Danville, Illinois Building Permit Guide

To get a building permit in Danville, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Danville’s Building Safety division in the Public Works Building takes every building permit application through the city’s CitizenServe portal and registers the contractors who pull them.

Authority: City of Danville Building SafetyApply: CitizenServe portalPhone: 217-431-2321
Building permits
Building Safety1155 East Voorhees Street
New house permit
$0.10 per sq ftPlus a $5 zoning fee
Contractor registration
$100 a yearExpires April 30
Missed inspection
$100 to $200Charge per the city’s documents

Inside Danville’s city limits, building, electrical, plumbing, mechanical and demolition permits come from Building Safety, part of the city’s Department of Public Works at 1155 East Voorhees Street (217-431-2321). Building permit applications are accepted only through the city’s CitizenServe portal, and a permit is issued only after the application is paid for and approved by the inspector for that trade. Under the city’s posted fee schedule a new home costs $0.10 per square foot plus a $5 zoning fee, and other work is priced from a $40 minimum by project cost.

What requires a building permit in Danville?

The city publishes a four-page list of activities requiring permits, one page each for building, electrical, mechanical and plumbing work. The building page is broad: any new structure, addition or alteration, demolishing or moving a structure, and installing or altering equipment the building code regulates. It then names the smaller jobs homeowners often ask about.

Building permit required

  • Fences, sheds, patios and decks
  • Swimming pools more than 24 inches deep, spas and hot tubs
  • New or replacement windows
  • Roofing, new or recover, over one square of shingles or 100 square feet of other roofing
  • New interior partition walls
  • Concrete sidewalks; concrete, asphalt or brick driveways and parking lots
  • Retaining walls in hazardous locations or along property lines
  • Any permanent sign

No permit on the city’s list

  • Installing or replacing exterior siding
  • Gutters and downspouts
  • Cabinets, countertops and similar finish work
  • Drywall, painting and wallpapering
  • Carpet, tile and other floor finishing
  • Roof repairs under the one-square / 100-square-foot threshold

The trade pages follow the same pattern. Electrical permits cover temporary poles, new or upgraded services, panels, meter moves, new wiring, outlets and switches, and hard-wired appliances and fixtures; like-for-like swaps of fixtures, outlets, switches and plug breakers, fuses and plug-in smoke detectors are exempt. Mechanical permits cover new heating, cooling, duct, vent, gas-line and generator work, but not servicing, cleaning or recharging existing equipment. Plumbing permits cover new or replaced fixtures, water heaters, water and sewer lines, sewer taps, backflow preventers and sprinkler systems; leak repairs, thawing pipes and unplugging a sewer do not need one.

What Danville decides and what the state holds

Danville writes its own building rules: it applies the international codes as amended by its own adopting ordinance (see the code section below), sets its own fees and runs contractor registration under Chapter 165. Plumbing is the piece the state controls: the checklists name the Illinois State Plumbing Code as required by the Illinois Department of Public Health, and plumbers and roofers carry state licenses that Danville checks at registration.

Short on time to read all of this?

Get a free quote →

Danville building department: who handles permitting

Building Safety issues building, trade and demolition permits for property inside the city limits. Planning and Zoning, in the same building, handles zoning verification letters, rezoning, variances, special uses, planned unit developments, home occupations and sign permits. The city’s zoning reaches a 1½-mile extraterritorial area around Danville, so land just outside the limits can still fall under city zoning; for building permits on unincorporated land, see the Vermilion County guide.

Danville permit contacts
OfficeContact
Building Safety (permits, inspections, contractor registration)Public Works Building, 1155 East Voorhees Street, Danville, IL 61832; 217-431-2321; permits@cityofdanville.org; 7:30 a.m. to noon and 1 to 4 p.m., Monday to Friday
Planning and ZoningSame building; 217-431-2321
Department headDavid Ruwe, Director of Public Works
City Clerk (records requests)Robert E. Jones Municipal Building, 17 West Main Street; city hall 217-431-2200

See also the Vermilion County permit guide for floodplain, septic and well permits outside the city.

Danville permit types

Danville issues separate permits by trade: the checklists say an application for each applicable permit, whether demolition, building, plumbing, mechanical or electrical, must be filed before work starts. Building permits go through CitizenServe; the city’s other community development applications are emailed to permits@cityofdanville.org and paid by card over the phone, or mailed with a check to Building Safety.

Residential permits

  • New homes and additions: one complete set of plans, one final PDF and one site plan, reviewed against the 2026 one- and two-family checklist. Plans are also needed for every other project except minor remodeling with no structural change, though the building official may waive them.
  • Pools, spas and hot tubs: a building permit for every in-ground or above-ground pool, spa or hot tub; wading pools under 24 inches deep are exempt. Pools sit in side or rear yards, at least 5 feet from property lines, never over a gas line and never under or within 22.5 feet of power lines, with a separate electrical permit for pumps, filters and lighting.
  • Roofing: the roofer’s state license number must be on the application.
  • Fences, decks, sheds, driveways and windows: building permits under the city’s list.

Commercial permits

Commercial and multi-family work is reviewed under the International Building Code as amended by the city, with the Illinois Accessibility Code. Applicants file two complete sets of plans signed and sealed by a licensed design professional, a final PDF and a site plan; new buildings, additions and major improvements must be sealed by an Illinois registered architect or structural engineer, and building systems may also be sealed by a professional engineer.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning: confirm the zoning district on the city’s zoning and land use map, or request a zoning verification letter, before buying a site or starting work; rezonings, special uses and planned unit developments go to the Planning and Zoning Commission and then the City Council.
  • Stormwater: under Chapter 162, agricultural and single-family residential projects need no stormwater management permit. Other development that disturbs more than 5,000 square feet needs one: on an overall site over 1 acre, both detention and water-quality volume; on a smaller site, detention, water-quality volume or a fee in lieu. The plan is filed with the zoning or building permit application.
  • Land disturbance: a Class 1 permit for 1 acre or more, or a Class 2 permit for 2,000 square feet up to 1 acre.
  • Historic districts: work in the Lincoln Park Historic District can need a certificate of appropriateness.
  • Floodplain: Danville takes part in the National Flood Insurance Program; its stormwater code requires buildings next to an overland flow path to have their lowest opening at least half a foot above the base flood elevation where the tributary area is 20 acres or less, and 1 foot above it for larger areas.

Danville permit costs and fees

The fee schedule posted on the city’s Planning / Zoning page is headed “effective as of 3/1/16”. The Building Safety page also lists a “Fee Schedule” among its fillable forms, so confirm current figures with Building Safety. The posted figures are:

City of Danville permit fees (schedule effective March 1, 2016)
ItemFee
New residential construction$0.10 per square foot plus a $5 zoning fee
Other work, project cost $0 to $3,000$40
Each further $1,000 of project cost up to $50,000$5 more per band, reaching $275 at $49,001–$50,000
Project cost $50,001 to $1,000,000$275 plus $3 per thousand over $50,000
Project cost over $1,000,000$3,125 plus $2 per thousand over $1,000,000
Building plan review$150 up to 1,500 sq ft; $500 for 1,501–25,000; $2,000 for 25,001–50,000; $4,000 over 50,000
Site plan review$100 up to 5 acres; $200 over 5 acres
Stormwater management review$200 initial (first and second review); $100 each later review
Electrical3.5% of project cost up to $50,000; over $50,000, $1,750 plus 1% of the cost over $50,000; minimum $40
Mechanical1.5% of the equipment and installation cost; minimum $40
Plumbing$15 per fixture, waste opening, water service, backflow preventer, water heater or softener; $30 yard sprinklers; $60 sewer tap or sewer repair; minimum $40
Sewer tap fee$750 single-family home; $375 per unit of multi-unit housing; $1,000 business under 10,000 sq ft; $2,500 larger businesses, restaurants and taverns
Land disturbanceClass 1: $100 for the first 5 acres, $200 over 5 acres; Class 2: $20 with architect- or engineer-prepared plans for new homes, additions and demolitions, otherwise $200
Contractor registration$100 a year; $50 late fee after April 30

Rather talk it over?

Call 1-855-478-4290 →

The valuation chart applies to non-residential work, residential alterations, remodels and repairs, awnings, pools, tanks, fireplaces, demolitions and signs. Two worked examples from the chart: a $30,000 kitchen remodel falls in the $29,001–$30,000 band and costs $175; a $100,000 commercial alteration costs $275 plus $3 for each of the 50 thousands over $50,000, or $425. A new 2,000-square-foot house is $200 plus the $5 zoning fee, before plan review and trade permits.

Stormwater projects that use outside review engineers can be billed for the extra cost, capped at $1,500 in total, and the fee in lieu of on-site stormwater management is $0.75 per square foot of the overall site ($0.25 in the B4 district).

Trade permits and who may pull them

Every contractor working in the city must first register with Building Safety under Chapter 165 of the City Code, and anyone a contractor hires as a subcontractor must be registered too. Registration needs the application form, proof of at least $1,000,000 in liability insurance, proof of workers’ compensation insurance and the $100 annual fee; all registrations expire April 30. The department keeps a list of registered contractors.

  • Electrical: the registration form has Class A and Class B electrical categories, and Danville requires additional testing or licensing for electrical work.
  • Plumbing: a plumbing contractor shows an Illinois plumbing license number (055-) to register.
  • HVAC: furnace, air conditioning and refrigeration contractors register under the mechanical category, which also carries the extra testing or licensing requirement.
  • Roofing: the state roofing license number (104-) is recorded at registration and on the permit application.
  • Demolition: only a general contractor registered under Chapter 165 may demolish a building.

The city’s documents do not describe a homeowner permit or an owner exemption from registration; owners planning their own work should ask Building Safety at 217-431-2321 before applying.

Rather not deal with the building department?

Get a free quote →

How to apply for a Danville building permit

1. Check zoning

Look up the parcel on the city’s zoning and land use map, or request a zoning verification letter, and note any historic-district or stormwater trigger.

2. Register contractors

Make sure the general contractor and every subcontractor hold a current Danville registration with insurance on file.

3. Prepare plans

Use the 2026 one- and two-family checklist or the commercial checklist; commercial plans must be sealed.

4. Open a CitizenServe account

The city publishes a guide to creating a CitizenServe portal account; building permit applications are accepted only there.

5. Apply and pay

File the building permit and each trade permit, and pay the fees.

6. Post the permit and call inspections

Work may start only after the permit is issued and posted on the site; give the inspector 24 hours’ notice for each inspection.

Review, corrections and what causes delay

A permit is not issued until the application and payment are both received and the application is approved by the inspector for that trade, so an unpaid fee or a missing trade application holds up the whole job. Unregistered subcontractors, a missing roofer’s license number or, for commercial work, unsealed plans also stop a permit.

Inspections in Danville

Danville expects the permit holder to set up every inspection: the permit page says the permittee arranges inspections unless something else was agreed at application, and the contractor instructions tell applicants to call the inspector for that trade directly with 24 hours’ notice. The city’s documents disagree on the penalty for skipping one: the permit page says failing to schedule an inspection may bring a $100 charge per offense, while the 2025–26 registration form says failing to call for a required inspection is subject to a $200 administrative fee.

  • Each trade separately: Building Safety has a building inspector, an electrical and zoning inspector and a plumbing and mechanical inspector, each with a direct line.
  • Demolition: the plumbing inspector checks the sewer disconnect before it is covered, and the building inspector approves broken basement slabs before backfill; a demolition must be finished within 15 days of the permit, with foundations removed to at least 3 feet below final grade.
  • Pools: the permit holder is responsible for making sure the required permanent barrier is in place.

Building codes in Danville

The city’s 2026 plan-review checklists list the codes Danville applies: the 2021 International Residential and Building Codes as amended by the city’s adopting ordinance, the 2021 International Mechanical and Fuel Gas Codes, the National Electrical Code, the International Fire Code for commercial work, the Illinois State Plumbing Code, the Illinois Accessibility Code, the 2008 zoning ordinance and the 2017 stormwater code. The adopting ordinances themselves sit in the city’s code of ordinances on American Legal Publishing. FEMA lists the City of Danville (community 170662) as participating in the National Flood Insurance Program, with its current flood map dated May 16, 2012.

Want this handled start to finish?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Danville permit records and official resources

The CitizenServe portal holds building and zoning permits, licenses and code complaints for property inside the city. For older files or records not online, Danville’s FOIA officer is the City Clerk at 17 West Main Street; requests can be made in person from 8 a.m. to noon and 1 to 4:30 p.m. on weekdays, by mail or by email, and since January 1, 2026 an emailed request must be written in the body of the message, not in an attachment or link.

Inspections are where schedules slip.

Get a free quote →

Danville building permit FAQs

How do I apply for a building permit in Danville?

Only through the city’s CitizenServe portal. Other community development applications can be emailed to permits@cityofdanville.org or mailed with a check to Building Safety.

How much is a building permit in Danville?

Under the schedule effective March 1, 2016, a new home is $0.10 per square foot plus a $5 zoning fee; other work starts at $40 for up to $3,000 of cost and rises $5 per $1,000 to $275 at $50,000.

Do I need a permit to replace my roof or windows?

Yes for windows, and yes for roofing over one square of shingles or 100 square feet of other roofing. Siding, gutters and downspouts need no permit.

Do contractors have to register with the city?

Yes. Every contractor and subcontractor registers with Building Safety for $100 a year with $1,000,000 liability insurance and workers’ compensation; registrations expire April 30.

Does an above-ground pool need a permit?

Yes, every in-ground or above-ground pool, spa or hot tub does; only wading pools under 24 inches deep are exempt.

Who schedules inspections?

The permit holder calls the inspector for that trade with 24 hours’ notice. Missing an inspection can cost $100 or $200, depending on which city document applies.

Does Danville zoning apply outside the city limits?

Yes, within the city’s 1½-mile extraterritorial jurisdiction, according to the Planning / Zoning page.

Simplify Danville permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Danville sooner?

Let Alliance prepare, file, and track your Danville permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Danville permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.