Clark County, Illinois Building Permit Guide

To get a building permit in Clark County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Clark County’s website lists no building or zoning office; the county permits it publishes are Highway Department truck and utility permits, while the Health Department in Martinsville permits septic systems and wells.

Septic and wells: Clark County Health DepartmentRoad permits: Clark County Highway DepartmentPhone: 217-967-2243
Septic permit
$125 or $100Form and web page differ; Health Department
Health Department
997 N. York St.Martinsville; weekdays 8–4
Highway permits
Truck and utilityForms on the county permits page
Flood insurance
ParticipatingUnincorporated Clark County

Unincorporated Clark County has no building or zoning department on the county’s website, and the county’s only permits page belongs to the Highway Department, which issues general truck permits and utility permits and takes culvert payments online. For a rural home, the approvals the county’s offices publish are for septic systems and wells: the Clark County Health Department, 997 N. York Street in Martinsville (217-967-2243), reviews and approves private sewage plans before construction, with a $125 permit fee on its application form ($100 on its septic page). Marshall, Casey, Martinsville and Westfield are separate governments.

What requires a permit in unincorporated Clark County?

The county’s department list includes the Highway Department, Health Department, Supervisor of Assessments, Clerk and Recorder, Treasurer and Sheriff, but no building, zoning or planning department, and the county’s pages describe no county building permit. The approvals the county’s own offices publish are:

Health Department

  • Private sewage systems: plan review and approval before construction, and inspection of the installation
  • Aeration systems, septic tanks with seepage fields or buried sand filters, and holding tanks
  • Sewage variance requests
  • Water well permits to construct, modify or seal a well
  • Real estate transfer inspections of private wells and septic systems

Highway Department

  • Utility permits, on the county’s utility permit application and policy
  • General truck permits
  • Culverts, paid through the county’s culvert payment link

None of the county’s Assessor, Supervisor of Assessments, Clerk and Recorder or Highway pages describes a county building permit or an improvement notice. A rural owner planning a house, addition or farm building should still ask the county whether any approval applies to the parcel.

What the county decides and what the state holds

The county sets its own highway permit rules and fees, and the Health Department administers private sewage and well permits within the county. The septic rules themselves come from the Illinois Private Sewage Disposal Code, which the department notes received numerous updates on January 1, 2014, and wells are built only by contractors licensed by the Illinois Department of Public Health.

Clark County building department: who handles permitting

No single county office issues building permits. The offices that do publish permit work for rural land are:

Short on time to read all of this?

Get a free quote →
Clark County offices for rural building projects
OfficeContact
Clark County Health Department, Environmental Health (septic, wells)997 N. York Street, P.O. Box 266, Martinsville, IL 62442; 217-967-2243; Monday to Friday 8 a.m. to 4 p.m., walk-ins Monday to Thursday 8 a.m. to 2:30 p.m., evening appointments on request
Clark County Highway Department (truck and utility permits, culverts)15487 N. State Highway 1, Marshall, IL 62441; 217-826-8056; fax 217-826-5694; Monday to Friday 7:30 a.m. to 4 p.m.; County Engineer Dallas Richardson
Clerk and Recorder (deeds, plats)501 Archer Avenue, 1st floor, Room 3, Marshall, IL 62441; 217-826-8311; Monday to Friday 8 a.m. to 4 p.m.
Supervisor of Assessments501 Archer Avenue, Marshall, IL 62441

Cities and villages in Clark County

The incorporated places are Marshall (population 3,880), the Clark County part of Casey (2,364), Martinsville (1,083) and Westfield (518). Casey also extends into Cumberland County. Each city or village governs land inside its limits, so ask its city or village hall which permits it requires before building there. Townships do not issue building permits, but the county Highway Department maintains the 165-mile county road system, helps the 15 townships with their 785 miles of township roads and 115 township bridges, and administers their Motor Fuel Tax and bridge funds.

Clark County permit types

For a rural project, the permits to plan for are the health and highway approvals below. The county’s pages describe no building plan review for houses or commercial buildings.

Residential permits

  • Septic system: before installing a private sewage system, contact the Environmental Health office, or have your installer contact it, to get the application. Your private sewage contractor designs a system suited to the house and site that meets the Illinois Private Sewage Disposal Code, and a soil analysis by a certified soil scientist may be needed before the department approves it. The department’s plan review application goes further: a soil test must set the loading rate, percolation results are not accepted, and the soil data report is attached. The form asks for the number of bedrooms, any garbage grinder, water softener or hot tub, the water supply, and a scaled lot diagram with the system, wells (including neighbors’ wells near the line), water lines, buildings, elevations and any sanitary sewer within 200 feet.
  • Septic setbacks on the form: a septic tank at least 5 feet from the building, 50 feet from wells, 10 feet from a pressure water line and 25 feet from a lake, stream or in-ground pool; a seepage field at least 10 feet from the building, 75 feet from wells, 25 feet from a pressure water line, 10 feet from an artificial drain, 5 feet from the property line and 25 feet from water or an in-ground pool.
  • Discharging systems: the department posts a homeowner certification form for discharging private sewage systems.
  • Variances: a sewage variance request form is available where a system cannot meet the code.
  • Water well: the department uses the state’s Application for Permit to Construct, Modify or Abandon a Water Well (IDPH form IL482-0620), which covers drilled, bored, driven and dug wells and repairs, deepening and sealing. It needs a site diagram with distances to buildings, property lines, sewer lines, septic components and other contamination sources, and is signed by the licensed well contractor and pump installer; the office can supply a list of local well contractors.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Utility companies and their contractors apply on the Highway Department’s utility permit application, which includes the county’s policy, and trucking firms use the county’s general truck permit form (2017). Commercial buildings in rural Clark County have no county building review described on the county’s pages; ask the county before construction which approvals apply.

What comes before construction

  • Incorporated or not: confirm whether the land lies in Marshall, Casey, Martinsville or Westfield (the Supervisor of Assessments page links city maps); inside them, that city or village decides.
  • Septic and well approval: plans for a private sewage system are approved before it is built.
  • Road work: utility work needs the Highway Department’s utility permit, and culverts are paid through the county’s culvert payment link.
  • Floodplain: unincorporated Clark County takes part in the National Flood Insurance Program, so ask the county about any mapped flood hazard area before you build; the county’s pages do not name a floodplain administrator.

Clark County permit fees

The county publishes no building permit fee, because its pages show no county building permit. The construction-related charges printed on official pages are the Health Department’s septic fees, and the two Health Department sources do not agree on the amount:

Published Clark County permit charges
ItemFee
Private sewage (septic) permit, residential, commercial or multi-system$125, as printed on the Private Sewage Disposal System Plan Review Application
Private sewage permit application fee on the septic web page$100, payable to the Clark County Health Department
Water well permitFee line left blank on the state well permit form; ask the Health Department
Soil analysisArranged separately with a soil classifier (no amount posted); a soil test is required with every septic application
Truck and utility permitsPaid through the county’s online permit payment link
CulvertsPaid through the county’s culvert payment link

Rather talk it over?

Call 1-855-478-4290 →

The application form (posted in 2019) prints $125 for every system type, while the septic page names a $100 permit application fee, so confirm the current amount with Environmental Health at 217-967-2243 before you send a check. If an aeration system is installed, the dealer must give the homeowner an initial two-year service policy; the department recommends renewing it when it expires.

For deeds and plats, the Clerk and Recorder’s fee schedule (raised July 1, 2023) adds a $3 restoration fee, a $19 rental housing surcharge and a $21 GIS fee to every recorded instrument, and certified birth, death and marriage certificates cost $16 for the first copy and $6 for each additional one.

Trade permits and who may pull them

Clark County’s pages list no electrical, plumbing or mechanical permits for rural land and no county contractor registration. The trade rules that apply come from the state and from the Health Department:

  • Septic installation: only Illinois licensed private sewage installation contractors, or the homeowner, may install a private sewage system.
  • Wells: only water well contractors licensed by the Illinois Department of Public Health may construct a well.
  • Plumbing and roofing: a rural Clark County house still needs an IDPH-licensed plumber for plumbing under the Illinois Plumbing Code and a state-licensed roofing contractor for a roof.

The septic application words the homeowner rule this way: work not done by a homeowner who owns and occupies the single-family residence must be done by a licensed contractor, and the contractor’s license number goes on the form. Inside Marshall, Casey, Martinsville and Westfield, any local trade permits or contractor rules are set by that city or village.

Rather not deal with the Clark County building department?

Get a free quote →

How to get a septic or well permit in Clark County

1. Confirm the land is rural

Check that the parcel is outside Marshall, Casey, Martinsville and Westfield; inside them, start with the city or village.

2. Ask the county about other approvals

Ask whether any county approval applies to the house or building, and whether the site is in a mapped flood hazard area.

3. Hire a septic contractor

Choose an Illinois licensed private sewage installation contractor, or plan to install the system yourself as the homeowner.

4. Get the soil test

Have a soil classifier test the site; the department does not accept percolation results.

5. Apply to the Health Department

Submit the plan review application with the lot diagram and soil report and the fee (confirm $125 or $100), and the well permit form for a new well.

6. Install and have it inspected

Give 48 hours’ notice before work and call for the final inspection before the system is covered.

Review, corrections and what causes delay

The department approves septic plans before construction, so a design that does not meet the Illinois Private Sewage Disposal Code, or soil that needs a soil scientist’s analysis, holds up the project; a variance request is the route where the code cannot be met. Utility work waits on the Highway Department’s permit; completed permit forms are emailed to the address on the county permits page.

Inspections in Clark County

Environmental Health staff review the plans and inspect the installation of private sewage systems to make sure they are built correctly. The septic application commits the contractor to notify the Health Department 48 hours before construction starts and to call for the final inspection and approval before the system is covered, and the homeowner’s signature consents to inspections by department staff. Approval does not guarantee trouble-free operation: the contractor answers for installing to the state Private Sewage Disposal Licensing Act and Code and the Clark County Private Sewage Disposal Ordinance, and the owner accepts responsibility for servicing the system.

For wells, the person building or deepening a permitted well must tell the department, by phone or in writing, at least two days before work starts, and the permit form has a box the department ticks when it plans a full inspection. The department also publishes disinfection procedures for bored or dug wells and for drilled wells, tests water samples and carries out real estate transfer inspections of private wells and septic systems. The county’s pages describe no building inspections for houses or other structures on unincorporated land.

Illinois building code in Clark County

The county’s pages show no county building code. FEMA’s Community Status Book lists Clark County (community 170940, unincorporated areas) as participating in the National Flood Insurance Program, with its first flood insurance rate map dated November 4, 1988 and its current map dated August 2, 2007; the county has no Community Rating System class.

Want this handled start to finish?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Permit search and official resources

The county offers no online permit search. For septic and well records on a property, ask the Health Department at 217-967-2243; for highway permits, use the Highway Department’s permits page. Recorded deeds and plats are kept by the Clerk and Recorder, which sells county records online for an extra fee (deed records from 1959) and gives no legal advice or legal descriptions.

Inspections are where schedules slip.

Get a free quote →

Clark County permit FAQs

Does Clark County issue building permits?

The county’s website lists no building, zoning or planning department, and its assessor, Supervisor of Assessments, Clerk and Highway pages describe no county building permit or improvement notice; ask the county before building whether any approval applies to your parcel.

How much is a septic permit in Clark County?

The plan review application prints $125 for residential, commercial and multi-system permits, while the septic web page names a $100 application fee; confirm with the Health Department at 217-967-2243.

Can a homeowner install their own septic system?

Yes, on the single-family home the owner owns and lives in; other work must be done by an Illinois licensed private sewage installation contractor, after the department approves the plan.

Is a percolation test enough for a septic permit?

No. The application requires a soil test by a soil classifier to set the loading rate and says percolation results are not accepted.

Who can drill a well?

Only a water well contractor licensed by the Illinois Department of Public Health; the Health Department can give you a list of local contractors.

What permits does the Highway Department issue?

General truck permits and utility permits; it also takes culvert payments online. Its office is at 15487 N. State Highway 1, Marshall (217-826-8056).

Who issues permits in Marshall or Casey?

Ask the city or village; Marshall, Casey, Martinsville and Westfield each govern building inside their own limits.

Simplify Clark County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Clark County sooner?

Let Alliance prepare, file, and track your Clark County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Clark County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.