Clinton County regulates building through its Zoning Department, led by Zoning Administrator Jami Staser in Room 124 on the lower level of the courthouse, 850 Fairfax Street, Carlyle ((618) 594-6655). The office issues a certificate of zoning compliance, which the county’s own forms call the building permit, for unincorporated land and for villages that have not adopted a zoning ordinance. A new house is charged $0.135 per square foot of living area under the fee sheet dated May 19, 2026, and the county’s application says any structure that will contain a bathroom needs a Health Department permit before the zoning certificate is issued.
What requires a permit in Clinton County?
Section 40-8-2 of the zoning code says no land may be developed and no structure may be built, enlarged, extended, altered, moved or rebuilt until an initial certificate of zoning compliance has been issued. The zoning office’s frequently asked questions give homes, decks, porches, permanent and portable sheds, pools, garages, carports and all farm structures as typical examples, and say a building sitting on skids still needs a certificate.
Certificate needed
- New houses, duplexes, multi-family buildings and manufactured or modular homes
- Additions, enclosed sunrooms, decks, covered patios and porches
- Garages, sheds, pole buildings, carports, lean-tos, gazebos and pavilions, including portable ones
- Above-ground and in-ground swimming pools
- Storage containers and truck trailers kept on a lot
- Farm buildings in agricultural districts (no fee)
- Personal solar arrays and commercial solar projects
Usually no certificate
- Re-roofing
- Window replacement
- New siding and similar maintenance work
Accessory buildings have their own limits under Section 40-3-14: no higher than 17 feet to the peak in a residential district or 35 feet in the A-R and C districts, with no limit in the A and I districts. In residential districts they may not sit in the front yard and must stay at least 7 feet from side and rear lot lines, and no accessory building may be used as a dwelling or for a home occupation.
What Clinton County decides and what the state holds
The county board sets zoning districts, setbacks, the subdivision and floodplain ordinances and the fees, and it has posted Ordinance 26-5-45 on solar energy systems and Ordinance 26-8-50 on energy storage systems. Asked whether commercial buildings face building codes, the zoning office answers by reprinting the state law for places with no local building code, under which a qualified inspector must certify a new commercial building before anyone occupies it. Farm land and farm buildings are largely exempt under Section 40-3-15, but they must meet district setbacks and need the free initial certificate. Private covenants and deed restrictions are not enforced by the county.
Clinton County building department: who handles permitting
The Zoning Department covers the unincorporated county and, under the ordinance in force since January 1991, villages that have no zoning ordinance of their own. The county’s 2019 building guide lists Bartelso and St. Rose as villages under county zoning, along with the unincorporated communities of Boulder, Ferrin, Jamestown, New Memphis and Shattuc, and it lists twelve municipalities that run their own zoning. The same office administers the subdivision and floodplain ordinances, handles 9-1-1 addressing from the same room, and prepares cases for the Zoning Board of Appeals.
Short on time to read all of this?
Get a free quote →| Office | Handles | Contact |
|---|---|---|
| Zoning Department (Zoning Administrator Jami Staser) | Certificates of zoning compliance, floodplain and subdivision review, ZBA filings | Room 124, 850 Fairfax Street, Carlyle; (618) 594-6655; fax (618) 594-6006; zoning@clintonco.illinois.gov; Monday to Friday 7:30 a.m. to 4 p.m. |
| Addressing Office | New 9-1-1 addresses | Room 124, courthouse; (618) 594-6631 |
| Health Department | Private sewage and water well permits | 991 Franklin Street, Carlyle; (618) 594-2723 |
| Highway Department (County Highway Engineer Dan Behrens) | New entrances, culverts and mailboxes on county highways; subdivision roads | 479 21st Street, Carlyle; (618) 594-2224; 7:30 a.m. to 4 p.m. |
| GIS Office | Parcel maps and flood zone determinations | Room 110, courthouse; (618) 594-6610 |
Cities and villages in Clinton County
| Municipality | Zoning handled by |
|---|---|
| Albers, Aviston, Beckemeyer, Damiansville, Germantown, Hoffman, Huey and Keyesport (villages) | Their own zoning ordinance |
| Breese, Carlyle, Centralia and Trenton (cities) | Their own zoning ordinance |
| Bartelso and St. Rose (villages) | Clinton County Zoning Department |
| New Baden (village) and Wamac (city), both partly in Clinton County | Not named in the county list; ask the municipality or the zoning office |
Inside a municipality with its own ordinance, building and zoning approvals come from that city or village hall.
Clinton County permit types
The residential application (revised September 2026) covers houses, manufactured homes, additions, pools and accessory buildings, with a commercial and industrial section on page 2; farm structures have a separate agricultural application. Applicant, owner and contractor sign before a notary; an owner doing the work signs as both.
Residential permits
- New homes. Give finished floor, garage, basement and second-floor square footage, height and cost, an 8½ by 11 inch floor plan and the Health Department permit number, or say the lot is on public sewer.
- Replacement homes. If a new house replaces an existing one, you sign a promise to remove the old dwelling once the new one is occupied and state the month and year.
- Accessory buildings and pools. Garages, sheds, pole buildings, carports, gazebos and pools go on the same form; for a pool you say whether and when a fence will be installed.
- Personal solar. A separate personal solar application (August 2026) applies, and the residential form asks whether the PTax-330 assessment form has been filed.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial and industrial certificates are charged by floor area at a different rate from homes, and the description of the proposed work goes in the commercial section of the application. Communication towers, commercial solar farms and energy storage have their own applications and ordinances, and special use requests are processed by the zoning office and sent to the Zoning Board of Appeals. Home occupations use a separate application.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Health Department. A house or other structure that will contain a bathroom needs a Health Department permit before the zoning certificate is issued. Allow two to three weeks for the soil sample and at least 15 days for the health application.
- Address. A new home site needs a 9-1-1 address from the Addressing Office.
- Floodplain and Carlyle Lake. The application asks whether any part of the tract is in a mapped floodplain or in the Carlyle Lake flowage easement; a yes means more information before a certificate is issued, including floodplain development forms and, near the lake, contact with the U.S. Army Corps of Engineers.
- County and township roads. New entrances and culverts on county highways go through the Highway Department, and the setback from a county road outside town limits is 100 feet from the road’s centerline (75 feet on township roads).
- Zoning relief. Variances, special uses, appeals and map or text amendments go to the Zoning Board of Appeals; map amendments then go to the County Board for a final vote.
Clinton County permit costs and fees
Fees are set by County Board resolution under Section 40-8-9 and can change without a code amendment. The current sheet on the zoning page is dated May 19, 2026. All fees are non-refundable; pay by check to Clinton County Zoning or by card through GovPayNow, which adds a service fee.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Residential (homes, additions, clubhouses), living area excluding basement and garage | $0.135 per sq ft; $50 minimum |
| Manufactured and mobile homes | $0.135 per sq ft; $50 minimum |
| Commercial or industrial building | $0.12 per sq ft; $50 minimum |
| Accessory uses and home occupations | Under 500 sq ft $25; 500 sq ft and over $50; $0.08 per sq ft over 1,000 sq ft |
| Agricultural buildings in agricultural districts | No fee for the initial certificate |
| Communication towers | $36 per foot |
| Commercial solar certificate | $5,000 per MWdc; $75,000 maximum |
| Special use permit | $360 for the first 10 acres plus $100 per additional acre, plus certified mail |
| Special use, commercial solar | $5,000 per MWdc; $125,000 maximum (extension $5,000) |
| Zoning map amendment | $400 for the first 10 acres plus $100 per additional acre, plus certified mail |
| Variance / appeal | $125 / $360, each plus certified mail |
| Building without a permit | Permit fee doubled; agricultural late fee $0.27 per sq ft, $100 minimum |
Worked example: a house with 2,000 square feet of living area costs 2,000 × $0.135, or $270, because basement and garage space is left out of the residential count. The accessory bands on the sheet do not join neatly between 500 and 1,000 square feet, so ask the office how a building in that range is priced. The fee table printed at the back of the residential application is an older version (updated December 16, 2024), with an accessory band of 501 to 1,000 square feet at $50, an agricultural late fee of $0.027 per square foot and commercial solar at $0.12 per square foot of permitted area; the May 2026 sheet is the newer document.
Trade permits and who may pull them
The county does not issue separate electrical, plumbing or mechanical permits; its approval is the certificate of zoning compliance, and the application asks only for the general contractor’s signature.
- Plumbing: the Illinois Plumbing Code applies and plumbers are licensed by the Illinois Department of Public Health; the county lists no local plumbing permit.
- Private sewage systems: a state-licensed, county-registered sewage contractor normally designs the system, signs the application and installs it, but the Health Department says property owners may install a permitted system themselves. Surface-discharging systems need the signed EPA NPDES general permit release form.
- Wells: new, modified and abandoned water wells and closed-loop geothermal wells each have a Health Department permit application.
- Roofing: roofing contractors hold a license from the Illinois Department of Financial and Professional Regulation, even though a re-roof generally needs no county certificate.
- Electrical and general contractors: the county’s pages show no county license or registration for them; a city or village with its own program may require one inside its limits.
Rather not deal with the Clinton County building department?
Get a free quote →How to apply for a Clinton County building permit
Use the county GIS map or call (618) 594-6655 to learn whether the parcel is unincorporated, its zoning district and any flood zone.
For a building with a bathroom, get the soil evaluation and Health Department sewage permit; for a new home site, request a 9-1-1 address.
Show property lines, all four setbacks, the distance from the centerline of the county or township road, any state highway right-of-way and the building height. The county does not mark property lines, so hire a land surveyor if you are unsure.
Residential, agricultural, personal solar or home occupation; sign it in front of a notary with the owner and contractor.
Email or mail the packet to the Zoning Office, or bring it to Room 124, and pay by check or through GovPayNow.
The initial certificate lasts one year; ask in writing for a one-year renewal if work is still going.
Review, corrections and what causes delay
The Zoning Administrator decides which items a project needs and may consult technical experts before approving it. A yes on the floodplain, flowage easement, Enterprise Zone or solar questions means more paperwork before issue, and a missing Health Department permit stops any building with a bathroom. Requests that need a hearing take longer: the ZBA meets on the first Wednesday of the month as needed, and the county says a rezoning usually takes at least two to three months. Any distance on the site that differs from the application can lead to a stop order and fines.
Inspections and final approval
Under Section 40-8-5 no new or altered structure may be used or occupied until the Zoning Administrator has inspected it and issued a final certificate of zoning compliance confirming the work matches the approved plan; skipping the final certificate is a separate violation. The Health Department inspects a private sewage system on site before it is covered (call at least 48 hours before installation), and work found in violation can draw a corrective action order that works as a stop order. A conviction is a Class B misdemeanor with a fine of $75 to $1,000 plus costs, and each day a violation continues counts as a separate offense.
Illinois building code in Clinton County
Clinton County’s rules are zoning rules: the zoning code (updated May 12, 2026), the subdivision code and the floodplain code, all posted on the zoning page. FEMA’s Community Status Book lists unincorporated Clinton County (community 170044) as participating in the National Flood Insurance Program, with flood maps effective August 2, 2007, and the zoning office reviews floodplain development applications.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Clinton County permit search and official resources
To get copies of permits, zoning files or other county records, send a written Freedom of Information Act request to the county’s FOIA officer at the Clinton County Courthouse, 850 Fairfax Street, Carlyle, IL 62231, (618) 594-6645. Parcel, zoning district and flood zone questions can go to the GIS Office or the Zoning Department.
- Clinton County Zoning Department
- Zoning fee sheet (May 19, 2026)
- Residential building permit application
- Agricultural building permit application
- Zoning FAQ (2025)
- Building in Clinton County FAQ (2019)
- Accessory structure rules
- Clinton County Zoning Code (updated May 12, 2026)
- Zoning Board of Appeals
- Variance application
- Clinton County Health Department forms
- Private sewage permit information packet
- County Highway Department
- County GIS office
- FOIA requests
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Clinton County building permit FAQs
Does Clinton County issue permits inside Breese, Carlyle or Trenton?
No. Those cities run their own zoning; the county office covers unincorporated land and villages without a zoning ordinance, such as Bartelso and St. Rose.
How much is a permit for a new house?
$0.135 per square foot of living area, with a $50 minimum; a 2,000 square foot home is $270, plus the $125 sewage permit if it is on a private system.
Do farm buildings need a permit?
Farm structures in agricultural districts need an initial certificate of zoning compliance and must meet setbacks, but no fee is charged.
Do I need a permit for a new roof or windows?
Generally no; the county treats re-roofing, window replacement and siding as maintenance.
How long is a zoning certificate good for?
One year, and the Zoning Administrator may renew it for further one-year periods on written request.
What happens if I build without a certificate?
The permit fee doubles (farm buildings pay $0.27 per square foot, minimum $100), and a conviction can bring a fine of $75 to $1,000, with each day of violation counted as a separate offense.
When does the Zoning Board of Appeals meet?
On the first Wednesday of the month as needed, at 6 p.m. in the County Board Room, 810 Franklin, Carlyle.
Can I install my own septic system?
Yes. The Health Department lets property owners install a permitted system; otherwise a state-licensed, county-registered sewage contractor does the work.
Simplify Clinton County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Clinton County sooner?
Let Alliance prepare, file, and track your Clinton County permits while your crew stays on the job.
More Illinois permitting guides
Bond County
Read guide →St. Clair County
Read guide →Madison County
Read guide →Coles County Building Permit Guide
Read guide →Cook County Building Permit Guide
Read guide →Country Club Hills Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Clinton County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.