In Bond County, the county’s Zoning Administrator, Brad Criner, issues building permits and zoning certificates for unincorporated land from 206 W. Main, Greenville (618-237-9737, office visits by appointment), and applications can be filed through the county’s online permit portal. A new house is charged $0.15 per square foot of foundation area plus a $100 zoning certificate of compliance. Greenville and the villages are outside the county building code, and septic and well permits come from the Bond County Health Department.
What requires a building permit in Bond County?
Two county ordinances apply outside the cities and villages. The Bond County Building Code (Ordinance No. 3, last revised December 17, 2024) requires a permit from the county Building Inspector before any building or structure is built, enlarged, altered or moved, and before repairs that affect its structure, fire safety or health features. The Zoning Ordinance, posted with a June 17, 2025 revision, requires an Initial Certificate of Zoning Compliance, which the county calls the building permit, before a lot is created, land is developed, or a structure or use is added, enlarged, altered, moved or rebuilt.
Permit needed
- New houses, commercial and industrial buildings, priced by foundation area
- Garages, carports, decks and patios ($50 flat) and other accessory buildings
- Alterations, remodeling, enlarging or moving a structure
- Manufactured homes, which get three inspections
- Billboards, towers, substations and bulk storage tanks
- Roof or ground solar and small wind systems, and solar or wind farms
- Any new lot, use or change of use under the zoning ordinance
No county permit
- Minor repairs that keep existing parts in shape and do not touch load-bearing parts, exits, light or ventilation, room sizes, sanitary or fire-resisting work, or add height or area
- Buildings used for agriculture on farms; a tract under five acres never qualifies, and on larger tracts the Building Inspector decides (zoning setbacks still apply)
- Anything inside a city or village limit
The building code words the farm-house rule two ways: its Section 3 exempts farm residences, while Section 7 excludes farm residences and garages from the farm exemption. Ask the Zoning Administrator before building a house or garage on farmland.
What the county decides and what the state holds
The county board adopted the 2021 International Building, Residential and Fire Codes and the 2020 National Electrical Code for unincorporated Bond County, sets its own fees, and runs its zoning and subdivision ordinances. The Illinois Plumbing Code, the Private Sewage Disposal Code and the state energy and accessibility codes apply as state law, and the Zoning Administrator will not issue a certificate until the sewage plan meets the state code.
Short on time to read all of this?
Get a free quote →Bond County building department: who handles permitting
The county Zoning office handles both permits: the building permit under the Building Code, issued by the Building Inspector the County Board appoints, and the zoning certificates issued by the Zoning Administrator, Brad Criner. The office sees visitors by appointment only, so call first or use the online portal. The county building code covers only structures outside the limits of cities, villages and incorporated towns; county zoning reaches into a municipality only where it has no zoning ordinance of its own.
| Office | Handles | Contact |
|---|---|---|
| Bond County Zoning | Building permits, zoning certificates, special uses, variances, solar and wind | 206 W. Main, Greenville, IL 62246; 618-237-9737; by appointment; online portal |
| Bond County Health Department, Environmental Health | Private sewage system and water well permits | 1520 South Fourth Street, Greenville; 618-664-1442 ext. 149 |
| Bond County Highway Department | County highways | 618-664-1144 |
Who permits in each city and village
| Place | Who issues building permits |
|---|---|
| Greenville (city) | City Building Inspector, 618-664-1644 ext. 1008; own fee schedule effective August 1, 2025 |
| Mulberry Grove, Old Ripley, Pocahontas, Smithboro, Sorento (villages) | Outside the county building code; zoning by the county only if the village has no zoning ordinance of its own. Ask the village clerk |
| Donnellson, Keyesport, Panama, Pierron (villages partly in Bond County) | The part inside Bond County follows the same rule; ask the village |
| Unincorporated land and farms | Bond County Zoning: building permit and zoning certificates |
To check whether an address is inside a municipality, use the county GIS web map or call the Zoning office with the parcel number.
Bond County permit types
Applications are made in writing on the county’s forms or through the online portal, by the owner or the owner’s representative. Each one needs a description of the work, the use, the estimated cost and a full legal description, and an E911 address must be assigned to the building before the permit can be approved.
Not sure this scope needs a permit?
Get a free quote →Residential permits
- New houses pay the per-square-foot building permit plus the $100 zoning certificate, and need one copy of the plans and a scaled plot plan.
- Garages, carports, decks and patios carry a $50 flat building permit; other accessory buildings are $0.10 per square foot of foundation.
- Manufactured homes are inspected at the footings, when the home is set and tied down, and when it is finished and graded.
- Personal solar and wind systems need an Initial Certificate of Zoning Compliance with a written plan and a drawing showing the system, property lines and setbacks; fees start at $200 for systems up to 10 kW.
- Zoning limits on accessory buildings: no accessory structure may be taller than 15 feet in a residential district or 25 feet in other districts, with no height limit in the agricultural district; an accessory building may never be used as a dwelling, and generally only one dwelling is allowed per lot.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial and industrial buildings use the same $0.15 foundation rate, and the zoning appendix adds a $5,000 commercial use fee for third-party plan review and inspections. The Administrator may issue a siting permit for a commercial project before the zoning certificate. Solar and wind farms, towers, substations and bulk storage tanks pay by area or construction cost, and the county’s solar farm checklist sets out what the application must include.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Variances, special uses and rezonings go through the Zoning Administrator to the five-member Zoning Board of Appeals, which meets at 7:00 p.m.; its 2025–2026 schedule lists second-Tuesday meetings from December 2025 to October 2026.
- Subdivision. No permit is issued for a structure that does not conform to the Bond County Subdivision Ordinance.
- Sewage and water. A lot within 600 feet of a public sewer with capacity must connect to it. Otherwise a private system is required, and the Health Department’s $75 permit comes before it is installed; a new well is a $100 permit and must be drilled by a state-licensed driller.
- Floodplain. FEMA lists unincorporated Bond County as a participating community whose flood map has no detailed elevations, so ask the Zoning office whether a site is mapped before you design.
Bond County permit costs and fees
Building permit fees are in Section 15 of the Building Code Ordinance and repeated in Appendix A of the Zoning Ordinance, whose filing fees were approved by the County Board on September 21, 2021 and amended on August 16, 2022, February 20, 2024, December 17, 2024 and June 17, 2025. Zoning fees are paid to the County Treasurer’s office and are non-refundable.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Building permit: residential, commercial and industrial | $0.15 per sq ft of foundation area |
| Building permit: accessory buildings | $0.10 per sq ft of foundation area |
| Building permit: carport, garage, deck, patio | $50 flat |
| Billboards | $60 flat |
| Substations, bulk storage tanks, towers | $60 for the first $5,000 of cost; $40 for each additional $1,000; $50 inspection fee per visit |
| Alterations, remodeling, enlarging or moving | $50 up to $5,000 of value; $100 above $5,000 |
| Zoning certificate of compliance: residential, commercial or industrial structure, accessory use | $100 |
| Commercial use fee (third-party plan review and inspections) | $5,000 |
| Automation fee | 10% of the total project fee; $25 minimum |
| Special use, variance or rezoning | $175, plus notice and certified-mail costs |
| Appeal | $75 application plus $175 filing fee |
| Personal solar or wind system | $200 (up to 10 kW), $375 (11–50 kW), $750 (51–100 kW), $2,000 (101–500 kW), $4,000 (501 kW–1 MW), $6,000 (1–2 MW) |
Worked example from the schedule: a house with a 2,000-square-foot foundation has a building permit fee of 2,000 × $0.15, or $300, and the $100 zoning certificate of compliance is charged on top; the automation fee is then added at 10% of the project fee. A solar or wind system built before its zoning certificate is issued pays double. Health Department permits ($75 septic, $100 well) are separate.
Trade permits and who may pull them
The county pages list no separate electrical, plumbing or mechanical permits. The 2020 National Electrical Code is part of the county’s adopted codes, and plumbing, heating and electrical work is checked at the rough-in inspection under the building permit. The county pages list no contractor license or registration of their own.
Rather not deal with the Bond County building department?
Get a free quote →- Plumbing: plumbing must be done under the Illinois Plumbing Code by a plumber licensed by the Illinois Department of Public Health.
- Roofing: roofing contractors need a state license from the Department of Financial and Professional Regulation.
- Septic and wells: the Health Department permits private sewage systems and wells, and well drilling must be done by a state-licensed driller.
- Greenville and the villages: trade rules there come from each municipality, not the county.
How to apply for a Bond County building permit
Check the county GIS map; inside Greenville or a village, the municipality handles building permits.
A new building needs an assigned 911 address before the permit can be approved.
Without public sewer within 600 feet, apply to the Health Department for the private sewage permit first.
One set of plans plus a scaled plot plan showing the new work, other buildings, structures within 10 feet of the lines, and water lines or drainage ditches.
File through the county permit portal or make an appointment at 206 W. Main, Greenville.
Pay the building, zoning and automation fees, then keep the signed permit posted on site until the work is complete.
Review, corrections and what causes delay
The Building Inspector must issue the permit, or explain in writing why not, within seven days of receiving the application. Missing 911 addresses, a lot that breaks the subdivision ordinance, an unresolved sewage plan or a zoning variance that must go to the Board of Appeals are the common reasons a permit waits. A permit expires if no work starts within one year, and a zoning certificate is valid for one year but can be renewed in writing while work is under way.
Inspections and certificates in Bond County
Any permitted project is inspected at least once. New buildings and alterations costing more than $1,000 get at least five inspections: before the footing is poured, when the foundation is ready to pour, when the frame is complete, when plumbing, heating and electric are roughed in, and when the structure is finished and the ground around it graded. The owner or builder tells the Building Inspector when each stage is near; on some remodeling jobs the footing inspection is skipped.
Before a new or altered building is used, the Administrator issues a Final Certificate of Zoning Compliance after an inspection. Unsafe buildings can be ordered repaired or condemned, and the Building Inspector can post a written stop order on work that breaks the code. Building code variances and appeals go to the county’s Board of Standards and Appeals. Violating the building code carries a fine of $25 to $500, with each day a separate offense; a zoning violation is a petty offense with a fine of up to $500 for each week it goes uncorrected.
Want this handled start to finish?
Get a free quote →Illinois building code in Bond County
FEMA’s Community Status Book lists unincorporated Bond County (community 170996) as participating in the National Flood Insurance Program, with a January 4, 1985 flood map that shows no detailed elevations. The county row covers unincorporated land only.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Bond County permit search and official resources
The Zoning Administrator keeps the records of zoning certificates, special uses, variances and Board of Appeals decisions, and the Building Inspector keeps permit, inspection and stop-order files. To get copies, use the county’s FOIA request form, posted on the county website.
- Bond County Zoning office
- Bond County online permit portal
- Bond County Building Code, revised December 17, 2024
- Bond County Zoning Ordinance with Appendix A fees, June 2025
- Solar farm checklist
- Bond County Subdivision Ordinance
- Zoning Board of Appeals schedule, 2025–2026
- Bond County GIS web map
- Bond County Health Department, environmental health permits
- City of Greenville building permits
- Bond County FOIA request form
Inspections are where schedules slip.
Get a free quote →Bond County building permit FAQs
Does Bond County issue permits in Greenville?
No. The county building code applies only outside city and village limits; Greenville’s Building Inspector issues permits in the city.
How much is a county building permit for a new house?
$0.15 per square foot of foundation area, so a 2,000-square-foot foundation is $300, plus a $100 zoning certificate and the automation fee.
Do farm buildings need a permit?
Buildings used for agriculture on farms are exempt, but not on tracts under five acres, and zoning setbacks still apply.
Who issues septic permits?
The Bond County Health Department, for $75, before a private sewage system is installed, replaced or modified.
How long is a permit good for?
A building permit expires if work does not start within one year; a zoning certificate lasts a year and can be renewed.
Does a deck need a permit?
Yes, in unincorporated areas: decks, patios, garages and carports carry a $50 flat building permit.
Can I visit the Zoning office without calling?
Office visits are by appointment; call 618-237-9737 or apply through the online portal.
Simplify Bond County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Bond County sooner?
Let Alliance prepare, file, and track your Bond County permits while your crew stays on the job.
More Illinois permitting guides
Fayette County
Read guide →Madison County
Read guide →Clinton County
Read guide →Boone County Building Permit Guide
Read guide →Bradley Building Permit Guide
Read guide →Brookfield Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Bond County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.