To get a building permit in Bradley, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

In Bradley, the Building Services Division of the Community Development Department, 111 N. Michigan Avenue, reviews plans, issues building permits and certificates of occupancy and inspects construction.

Authority: Building Services DivisionContractors: Kankakee County registrationPhone: 815-936-5100
Office
Building Services111 N. Michigan Ave.; 8 a.m.–4:30 p.m.
Review goal
10 working daysAfter a complete application
Trade inspections
Mon, Wed, Fri morningsPlumbing, electrical and HVAC
Permit life
12 monthsWork must start within 6 months

The Village of Bradley issues its own building permits through the Building Services Division of the Community Development Department at 111 N. Michigan Avenue (815-936-5100). Fees are based on the estimated value of the project, materials and labor included, and a code official gives the estimate on request; staff aim to finish review within 10 working days. Every contractor on a Bradley permit must be registered through the Kankakee County Contractors Registration Program, and plumbing, electrical and HVAC inspections are made only on Monday, Wednesday and Friday mornings.

What requires a building permit in Bradley?

The village says most construction needs a permit and advises checking with Building Services before any construction, alteration or repair; building without one can bring a fine or a stop-work order. Its permit guide lists new and temporary buildings, additions, demolitions, renovations and prefabricated structures, electrical and plumbing systems, heating, ventilating and air conditioning, water and sewer hookups and generators. For homes it names sheds, pools, fences, roofs, siding, windows, decks and fireplaces, and for businesses parking areas, signs and elevators.

Home projects

  • Additions, renovations and detached garages
  • Roofs, siding and windows
  • Decks, patios and fences
  • Sheds (168 square feet at most)
  • Pools and fireplaces
  • Driveways
  • Generators, water and sewer hookups

Business projects

  • New and temporary buildings
  • Renovations and demolition
  • Parking lots
  • Signs
  • Elevators
  • Electrical, plumbing and HVAC systems

What Bradley decides and what the state holds

Bradley lists the 2021 International Building, Residential, Fire, Mechanical, Fuel Gas, Property Maintenance and Swimming Pool and Spa codes, the 2021 ICC Performance Code and the 2020 National Electrical Code as its adopted codes, together with the current Illinois Energy Conservation Code, the Illinois Plumbing Code and the Illinois Accessibility Code. Zoning is Chapter 60 of the Bradley Village Code, administered by the Planning and Zoning Division and its Zoning Administrator.

Bradley building department: who handles permitting

The Building Services Division administers the village’s construction codes for new buildings, additions, alterations and remodels, helps enforce the zoning and sign rules, issues building permits and certificates of occupancy and makes the required inspections. Its handouts carry the heading Building Standards Department and a separate phone number, 815-933-5008, which the permit guide gives for inspection requests; the department page lists 815-936-5100. Kankakee County permits only unincorporated land.

Short on time to read all of this?

Get a free quote →
Bradley permit contacts
DetailInformation
OfficeCommunity Development Department, Building Services Division, 111 N. Michigan Ave., Bradley, IL 60915
Phone815-936-5100 (department page; ext. 6 on the garage packet); 815-933-5008 (Building Standards line on the handouts); fax 815-933-5068
Emailbuildingstandards@bradleyil.org
HoursMonday to Friday, 8:00 a.m. to 4:30 p.m. (the permit guide shows a noon to 1 p.m. closure)
Village Hall147 S. Michigan Ave.

Bradley permit types

Small jobs use the Building Permit Application, in a single-contractor or a multiple-contractor version; common projects have their own packet with the village’s construction rules and inspection list. A permit application needs the parcel ID number, the owner’s name, address and phone, a description of the work, a plot plan, a cost estimate or signed contract and the list of contractors, and, depending on the job, a floodplain survey, the recorded deed and two complete sets of construction plans.

Residential permits

  • Roofs. Ice and water shield along the roof edges and in valleys, no more than two layers of roofing, no mineral-surfaced rolled roofing and no tar or sealant used as flashing; tell the department before work starts.
  • Decks and porches. A plat of survey and plans, at least 5 feet from the property line, off any easement unless every utility consents in writing or an encroachment affidavit is signed, with post holes 42 inches deep. Guardrails at least 36 inches high are required where the deck is more than 30 inches above grade, with balusters no more than 4 inches apart; stairs are at least 36 inches wide with risers of 7¾ inches at most, treads of at least 10 inches and no open risers. The packet asks for 24 hours’ notice for the post-hole, framing and final inspections.
  • Fences. Residential fences may be 4 feet high in chain link or 6 feet in wood or vinyl; 8 feet is allowed in approved commercial areas.
  • Sheds. At least 5 feet from property lines and 10 feet from the house; sheds over 168 square feet are not allowed, and a concrete pad is recommended above 120 square feet.
  • Pools. The plot plan shows JULIE locates, the pool and the electrical supply; the department reviews completed pool applications within 14 business days. Pools go only in rear yards, 5 feet from property lines and accessory buildings, 10 feet from the house and 1 foot from easements, with no wiring under the pool, no overhead wires within 12 vertical feet and GFCI-protected power without extension cords. Barriers stand 4 to 6 feet tall, and the village electrical inspector checks the 18-inch-deep trench before it is covered, within 48 hours of the request.
  • Driveways. No closer than 5 feet to a property line, with curb cuts across public property no wider than 24 feet.
  • Detached garages. On the same lot as the house, at least 10 feet from it and 6 feet from any other structure, 5 feet from side and rear lot lines and never in a front yard or a street-side yard; eaves may overhang setbacks by 16 inches. A detached garage may cover up to 15% of the lot and stand no more than 16 feet 6 inches to the ridge, and the application includes two copies of the plat of survey with detailed drawings. The slab is at least 4 inches thick over compacted stone, inspected after the black dirt is removed and again after the stone is placed.
  • Attached garages. A one-hour fire-rated wall separates the garage from the house, the connecting door is fire-rated, self-closing and self-latching, a heat detector is interconnected with the smoke alarms, and the foundation goes below the 42-inch frost line.
  • Additions. Footing drain tile where the basement or crawl space floor is below grade, a heat detector in the garage, and any new water service installed by a licensed plumber.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Business projects – parking lots, signs, elevators and new or remodeled buildings – file on the same building permit application with plans, and signs have their own packet. Changes of zoning, special uses, annexations and variances use the Planning & Zoning Application Packet.

What comes before the building permit

  • Zoning. The nine-member Planning and Zoning Commission holds public hearings on special uses, zoning amendments and variations, hears appeals from the Zoning Administrator and meets at 6:30 p.m. on the first Tuesday of each month in the Village Board room at 147 S. Michigan Avenue. Its decisions are recommendations; the Village Board decides.
  • Hearing notice. The commission holds the hearing within 60 days of a complete application. The village publishes the legal notice 15 to 30 days ahead and bills the applicant, who pays at least seven days before the hearing; the applicant mails certified notices to every owner within 250 feet in the same window, using a list from the Bourbonnais Township Assessor or Community Development, and for a rezoning or planned development posts a sign of at least 8 square feet on the property for at least 15 days, sending the director a photo seven days before the hearing.
  • Floodplain. A floodplain survey may be required with the permit application.
  • Utilities. Call JULIE before digging post holes or footings; the deck packet asks you to allow two to three working days for the locate.

Rather talk it over?

Call 1-855-478-4290 →

Bradley permit costs and fees

Bradley publishes no building permit fee table on its building pages or permit packets; each packet leaves the permit fee blank for staff to fill in. The village’s permit guide says fees are based on the estimated value of the project, including the cost of materials and labor, and that a code official will estimate the fee for your project. The village’s 2025 and 2026 ordinance lists show no new building fee ordinance; the fee chapter of the Village Code was amended in 2025 only for ambulance and fire service charges.

What Bradley publishes about permit costs
ItemWhat the village publishes
Building permit feeBased on the estimated project value, materials and labor; ask a code official for an estimate
Proof of valueA cost estimate or signed contract with the application
PaymentChecks payable to the Village of Bradley, or online through the village’s BS&A payment site
Contractor registration (Kankakee County program)$150 a year, plus a $10,000 surety bond and insurance, per the county
Building without a permitPossible fine or stop-work order

Because no rate is published, no worked example can be given. Call Building Services at 815-936-5100 with the contract amount before you budget, and wait for the approved permit card to be posted before work begins.

Trade permits and who may pull them

Bradley requires every contractor working in the village to register with the Kankakee County Contractors Registration Program and to file the county license with Building Services, and its packets say all trades and contractors must be licensed in the county. Kankakee County describes the program as a $150 registration, valid for a year, with $1,000,000 general liability, $50,000 property damage and $100,000 workers’ compensation coverage and a $10,000 surety bond; its registration coordinator answers at 815-937-2940, extension 2, then 2 again.

Plumbing work also needs a letter of intent from the plumbing contractor with the building permit application, a provision of the state plumbing licensing law that the village says Illinois is now enforcing, and the addition packet calls for any new water service to be installed by a licensed plumber. The contractors who did the work must be present at every inspection.

Rather not deal with the building department?

Get a free quote →

How to apply for a Bradley building permit

1. Register the contractors

Make sure each contractor holds a current Kankakee County registration.

2. Choose the packet

Use the project packet, or the single- or multiple-contractor application.

3. Draw the plot plan

Show the lot, buildings, the new work and its distances to lot lines.

4. Attach the cost

Include an estimate or signed contract, since the fee depends on value.

5. File with Building Services

Submit at 111 N. Michigan Avenue; an inspector is assigned to review it.

6. Pay and post

Pay the fee and post the permit card before work starts.

Review, corrections and what causes delay

Once the application is complete, a building inspector is assigned and staff aim to finish review within 10 working days, though the time varies with the scope and the number of applications waiting. The county registration of every contractor and, on plumbing work, the plumber’s letter of intent belong in the application from the start. A permit lasts 12 months, and construction must begin within six months of issue.

Inspections and certificates in Bradley

Request inspections 48 hours ahead, according to the Building Services page, and not by email or voicemail; the permit guide asks for at least 24 hours’ notice at 815-933-5008, with inspections given first come, first served. Plumbing, electrical and mechanical inspections happen on Monday, Wednesday and Friday mornings only, and the pool packet notes there are no inspections on weekends or holidays. The property owner is responsible for making sure inspections are requested.

Typical inspections include footing and wall forms, basement and garage floors, the garage floor drain, under-floor plumbing, post hole depth, damp-proofing, buried electric service trenches, framing, rough electrical, plumbing and HVAC, fireplaces, water service, lawn sprinklers and the final; no concrete may be poured before inspection. A roof gets an ice and water shield inspection and a final, and a fence a post-hole and final inspection. Building Services also issues the certificates of occupancy.

Illinois building code in Bradley

Bradley enforces the 2021 International codes and the 2020 National Electrical Code it lists on the Building Services page. FEMA’s Community Status Book lists the Village of Bradley (community 170338) as participating in the National Flood Insurance Program, with flood maps dated January 20, 2010; the village is not in the Community Rating System.

Want this handled start to finish?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Bradley building permit FAQs

How much is a building permit in Bradley?

The fee is based on the estimated value of the project, materials and labor included; Building Services gives an estimate on request.

Do contractors need to register?

Yes. Every contractor must be registered through the Kankakee County Contractors Registration Program and file that license with the village.

How many roof layers are allowed?

Two at most, with ice and water shield at the edges and valleys.

How big can a shed be?

Sheds over 168 square feet are not allowed, and a shed stays 5 feet from lot lines and 10 feet from the house.

When are trade inspections done?

Plumbing, electrical and HVAC inspections are on Monday, Wednesday and Friday mornings only.

How long is a permit valid?

Twelve months, and work must start within six months of issue.

How tall can my fence be?

Four feet for chain link and six feet for wood or vinyl on residential lots.

Bradley permit search and official resources

For a permit’s status, contact Building Services. Permit records can be requested under the Freedom of Information Act on the village’s request form, sent to the Deputy Clerk at 147 S. Michigan Avenue or foia@bradleyil.org (815-932-2125); the first 50 black-and-white pages are free, later pages cost 15 cents each and certifying a record costs $1.

Inspections are where schedules slip.

Get a free quote →

Simplify Bradley permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Bradley sooner?

Let Alliance prepare, file, and track your Bradley permits while your crew stays on the job.