In the City of Country Club Hills, the Community Development & Building Department at City Hall (708-798-2616) issues every building permit and enforces building, housing, health, planning and zoning rules through the Building Commissioner. Applications and inspection requests go through the city’s BS&A online system, and the fees are set by Ordinance OA-28-25, adopted on July 14, 2025: a residential plan review is $100, a deck or garage permit $100 to $150, and commercial projects under $3 million $20 per thousand.
What requires a building permit in Country Club Hills?
The city’s rule sheet says all new construction, including additions, alterations and repairs, is subject to the building codes and needs a permit, while normal maintenance and repairs do not. The department’s page names the jobs that come up most often.
Permit required
- New buildings, structural additions, alterations and demolitions
- Alarm systems, electrical and plumbing installations
- Fences, decks, covered patios, garages and sheds
- Air conditioning systems and fireplaces
- In-ground swimming pools and other permanent pools
- Roofs, siding, windows, doors, driveways, generators, sump pumps and water heaters (each has a fee in the schedule)
Usually no permit
- Normal maintenance and repairs
- Many minor renovations and household repairs, which the department says may not need a permit
- Temporary pools that can be taken down or moved, which still need a proper enclosure
Grading matters too: the city’s flood page says any change to a building or to the land needs a permit, and that even regrading or filling in the floodplain does. Masonry and curbside mailboxes often need a permit, and electrical signs always do.
What Country Club Hills decides and what the state holds
Country Club Hills is a home-rule city: its council sets the building fee schedule in Section 14.9.05 of the city code, licenses contractors, and keeps local plumbing and electrical rules such as requiring a reduced pressure zone (RPZ) backflow valve on every commercial building and lawn irrigation system, certified each year. Plumbers hold state licenses from the Department of Public Health and roofers state licenses from the Department of Financial and Professional Regulation.
Country Club Hills building department: who handles permitting
The Community Development Department issues all building permits through the Building Commissioner. An application is reviewed in turn by the Zoning Administrator, the Building Commissioner, the Electrical and Plumbing Commissioners, the Director of Public Works, the Fire Department and the Director of Community Development, and review starts only once every required item is in.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Permit office | Community Development & Building Department, City Hall (lower level), 4200 West 183rd Street, Country Club Hills, IL 60478 |
| Phone / fax | 708-798-2616 / 708-798-7352 |
| Buildingdept@countryclubhills.org | |
| City Hall hours | Monday to Friday, 8:00 a.m. to 5:00 p.m. |
| Online | BS&A: permit applications, contractor accounts and inspection requests |
| Boards | Plan Commission (first Tuesday, 7:00 p.m.); Zoning Board of Appeals (second Tuesday) |
The department’s web page gives the City Hall address as 4200 Main Street, while the permit forms and the city’s July 2026 records notice use 4200 West 183rd Street. Only land inside the city is permitted here; unincorporated parcels nearby go to Cook County’s Department of Building and Zoning.
Country Club Hills permit types
Every application needs the property’s PIN and the value of construction, together with the applicant’s name, the job address and zip code. The city posts separate forms for building, electrical, plumbing, fence, roof, siding and gutters, driveway, mailboxes and sewer cleanouts, plus step-by-step sheets for decks, sheds, signs, pools and additions.
Residential permits
- Additions, alterations and garages: a plat of survey and a scaled drawing showing materials and scope, using the city’s specification sheet for additions, alterations and garages.
- Sheds: up to 144 square feet and 14 feet tall, at least 3 feet from a side lot line and 5 feet from the rear line or another building, never on an easement, on a 4-inch concrete base or anchored to posts 42 inches deep.
- Pools: plans showing lot lines, pool size and volume, filter and piping; the pool follows the accessory-structure setbacks and needs a fence 3.5 to 6 feet high with self-closing, self-latching gates.
- Fences: side-yard fences top out at 6 feet and may not extend past the front of the house; back-to-back fences keep a 3-foot gap with a gate, and on a corner lot a side-yard fence within 10 feet of the property line must be decorative, at least half open.
- Point-of-sale and rental inspections carry their own fees in the building fee schedule.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial and public buildings need three sets of architectural drawings stamped and signed by an Illinois-registered architect. The fee schedule charges commercial projects by the thousand, adds plan review at cost plus 20%, and prices permanent signs at $4 per square foot. Commercial solar is $500 plus 20% of the project cost, and every commercial building needs an RPZ backflow valve in addition to its water meter.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning review. The Zoning Administrator is the first reviewer. The Zoning Board of Appeals hears requests for relief from the zoning ordinance on the second Tuesday of each month.
- Development plans. The Plan Commission reviews development plans and recommends them to the City Council; it meets on the first Tuesday at 7:00 p.m.
- Pre-application meeting. The city suggests meeting the Building Commissioner or Director of Community Development before filing.
- Floodplain. Staff can show whether a lot is in a mapped floodplain; work in a designated floodway also needs an IDNR permit.
- Stormwater. Larger developments fall under MWRD’s Watershed Management Ordinance, which covers all of Cook County.
Country Club Hills permit costs and fees
Ordinance OA-28-25, adopted by the Mayor and City Council on July 14, 2025, amended the comprehensive building fee schedule in Section 14.9.05 of the city code (earlier versions came from ordinances of February and April 2022). Most residential permits are flat fees.
| Permit | Fee |
|---|---|
| Plan review, residential / commercial | $100 / cost plus 20% |
| Commercial projects under $3 million / over $3 million | $20 per thousand / $10 per thousand |
| Residential rehab | $625 |
| Garage / deck / shed | $150 / $100 / $100 |
| Fence / windows and doors / egress window | $75 / $75 / $150 |
| Roof repair / roof replacement / siding | $60 / $150 / $150 |
| Driveway, asphalt or sidewalk | $100 |
| Electrical / plumbing permit | $210 / $220 |
| HVAC, residential / commercial | $100 / $500 |
| Water heater / sump pump / generator | $100 / $100 / $150 |
| Solar, residential / commercial | $640 / $500 plus 20% of project cost |
| Swimming pool | $50 |
| Demolition, single-family / commercial | $150 / $600 plus 10% of square footage |
| Point-of-sale inspection, residential / commercial | $150 (up to 2 inspections) / $300 |
| Rental inspection | $200 (up to 3 inspections) |
| POD | $25 for 14 days, then $60 for 21 more days |
| Dumpster sticker, residential / commercial | $25 up to 14 days / $100 up to 30 days |
| Contractor license, general or subcontractor | $150 a year |
Rather talk it over?
Call 1-855-478-4290 →The schedule prices residential siding at $150 in one row but lists siding, soffit, fascia and gutter permits at $50 each in another, so ask which applies. It also lists $135 for mold removal, $100 for a sewer cleanout, $65 for a monument mailbox and $25 for a post mailbox. A real estate sign for a home is $0 in the 2025 schedule, although the department’s web page still quotes $35.
Trade permits and who may pull them
Every contractor working in Country Club Hills needs a city contractor’s license: $150 a year for a general contractor or a subcontractor, running May 1 to April 30, with a $10,000 surety or cash bond and a certificate of insurance. The city will not process an incomplete license application.
- Electrical: all electrical work must be done by an electrical contractor registered with the city, and the permit costs $210. The license application adds that electrical and plumbing work under a permit must be done by a contractor registered or licensed under Illinois statutes, or by a certified testing agent, with a copy of the license attached.
- Plumbing: plumbing permits go to licensed plumbers, and each plumbing application carries a letter of intent on the plumber of record’s business stationery, signed, with a notarized corporate seal if the business is incorporated. The permit is $220.
- Local plumbing rules: the city’s plumbing sheet bans no-hub couplings inside buildings, requires sump basins to stand at least 2 inches above the finished basement floor and anti-scald shower valves in new buildings.
- HVAC: $100 for a home and $500 for a commercial building.
- Roofing: $60 for repairs and $150 for a replacement; the roofer needs the city contractor license, and roofing contractors are licensed by the state.
Homeowners may build their own shed, since the shed sheet requires a city license only when a contractor or anyone other than the homeowner does the work.
How to apply for a Country Club Hills building permit
Ask the Building Commissioner or Director of Community Development about the project before filing.
Each contractor files the license application with the $150 fee, bond and insurance certificate.
Create a free account; contractors use the contractor application link.
Application with PIN and value of construction, plat of survey, scaled drawings, and for commercial work three sealed architectural sets.
Zoning, building, electrical, plumbing, public works, fire and community development each sign off.
The city prepares the placard and inspection cards and calls you when the permit is ready.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
Review does not start until every item is received, so a missing PIN, survey or construction value stops the clock. The city says a residential permit generally takes about two weeks and commercial permits six to eight weeks; its procedures sheet cites a city ordinance timeframe of 14 business days for residential permits. After the inspector signs a permit, processing takes up to two to three days before the customer is called, and the staff checks each contractor’s insurance first. Older city sheets from 2022 say emailed or faxed applications are refused; online filing now runs through BS&A.
Inspections in Country Club Hills
Inspections are scheduled online through BS&A, with separate links for owners and contractors. Fences and decks start with a post-hole inspection: submit the request form at least 48 hours before the date you want, choose the 9 a.m. to noon or 1 p.m. to 3 p.m. window, dig every hole at least 42 inches, and give the JULIE dig number. If the work is not ready or nobody is there, the city may charge an inspection fee.
Sheds get two inspections, one on the post holes or base and one at completion. Point-of-sale inspections cost $150 for a house, covering up to two visits, and rental inspections $200 for up to three. For other jobs, the office prepares inspection cards when it issues the permit.
Flood help is free: on request, Public Works will visit a property to look at a drainage, flooding or sewer backup problem and explain ways to reduce the damage.
Building codes in Country Club Hills
The city’s building, plumbing and electrical rules sit in Chapter 14 of the city code, published on Municode, and the department’s electrical sheet, updated in 2022, names the 2002 National Electrical Code with local additions in Sections 14.7.01 to 14.7.17. FEMA’s Community Status Book lists Country Club Hills (community 170078) as taking part in the National Flood Insurance Program, with flood maps effective August 19, 2008; the city joined the Community Rating System in 1993 and is rated class 10, which carries no premium discount.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Want this handled start to finish?
Get a free quote →Country Club Hills permit search and official resources
Permits are among the records the city keeps under the Freedom of Information Act. Send a written request, or use the city’s Request for Public Records form, to the FOIA officer at City Hall, 4200 West 183rd Street (708-798-2616, fax 708-798-7352); forms are also available at the police and fire stations and online. Requests must arrive during office hours, Monday to Friday, 8:00 a.m. to 5:00 p.m.
- Building Department / Community Development
- Permits, fees and contractor licensing (BS&A links and forms)
- Building fee schedule, Ordinance OA-28-25 (July 14, 2025)
- When is a building permit necessary?
- Permit procedures and processing times
- Permit application: alterations, additions, garages, sheds, decks, demolition
- Contractor license application
- Plumbing letter of intent
- Local plumbing requirements
- Shed permit procedure
- Swimming pool requirements
- Post-hole inspection request
- Plan Commission
- Zoning Board of Appeals
- Flood information
- FOIA procedure, July 2026
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Country Club Hills building permit FAQs
How much is a building permit in Country Club Hills?
Most home permits are flat fees under Ordinance OA-28-25: $100 for a deck or shed, $150 for a garage or roof replacement, $75 for a fence; residential plan review is listed at $100.
How long does a permit take?
About two weeks for residential work and six to eight weeks for commercial permits, counted from a complete submission.
Can I apply online?
Yes. The city takes permit applications and inspection requests through BS&A; a free account is required.
Do contractors need a city license?
Yes. General contractors and subcontractors pay $150 a year (May 1 to April 30) and post a $10,000 bond with an insurance certificate.
Can a homeowner build a shed without a contractor?
Yes. A homeowner may build their own shed with the $100 permit; any contractor doing the work must be licensed with the city.
How big can a shed be?
No more than 144 square feet and 14 feet tall, at least 3 feet from side lot lines and 5 feet from the rear line.
Do I need a permit to regrade my yard?
The city’s flood guidance says any alteration to a building or land needs a permit, including regrading or filling in the floodplain.
Simplify Country Club Hills permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Country Club Hills sooner?
Let Alliance prepare, file, and track your Country Club Hills permits while your crew stays on the job.
More Illinois permitting guides
Cook County
Read guide →Crestwood
Read guide →Elmwood Park
Read guide →Crawford County Building Permit Guide
Read guide →Darien Building Permit Guide
Read guide →De Witt County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Country Club Hills permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.