Building permits in the Village of Crestwood are issued by the Building & Zoning Department at Village Hall, 13800 S. Cicero Avenue (708-371-4800), where Bill Graffeo is the Building Commissioner. The department reviews plans, inspects work, issues certificates of occupancy and certifies zoning. Applications are dropped off at Village Hall or mailed, the fee is paid before anything is processed, and every contractor must be registered with the village, at $100 for a general contractor and $25 for a subcontractor.
What requires a building permit in Crestwood?
The Building & Zoning Department publishes a short list of projects that need a permit and a list of jobs that do not. Exterior jobs such as new windows and doors, siding and re-shingling are on Crestwood’s permit list, so check it before ordering materials.
Permit required
- Remodels, additions and demolitions
- Changes in lot drainage or grading
- New electrical, gas, mechanical or plumbing services
- Changing heating, cooling or ventilation systems
- Re-shingling roofs, soffits and fascia, and new siding
- Windows and doors
- Patios, sheds, fences, pools and hot tubs, with a plat of survey
No permit needed
- Painting
- Carpeting
- Trim work
- Changing or swapping light fixtures
The village’s own 2025 building permit application has quick boxes for patios, fences, driveways, sheds and repairs, and a separate new construction application covers a new house and garage. Work that fits neither list should be raised with the department before it starts.
What Crestwood decides and what the state holds
Crestwood adopts its own building codes and zoning ordinance, which are published in the village code, and decides its own permit fees, contractor registration, rental licensing and vacant building rules. Plumbers are licensed by the Illinois Department of Public Health and roofing contractors by the Department of Financial and Professional Regulation; the village’s registration form asks electricians and plumbers to attach a copy of their license.
Crestwood building department: who handles permitting
The Building & Zoning Department, led by Building Commissioner Bill Graffeo, conducts plan reviews and inspections, issues permits for new buildings, renovations and additions, issues certificates of occupancy and certifies the zoning of properties. Permits are signed by the building inspector and the Building Commissioner, who also signs village property-maintenance notices as Village Services Director.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Permit office | Building & Zoning Department, Village Hall, 13800 S. Cicero Avenue, Crestwood, IL 60418 |
| Phone / fax | 708-371-4800 (Building Department extension 2006 on the application) / 708-371-4849 |
| Hours | Monday, Wednesday, Thursday and Friday 9 a.m. to 4 p.m.; Tuesday 9 a.m. to 8 p.m.; closed on the holidays the village posts |
| Building Commissioner | Bill Graffeo |
| Filing | Drop off or mail completed applications to Village Hall; pay in full first |
| Zoning body | Planning & Zoning Commission, 8:30 p.m. on the second and fourth Monday, Crestwood Civic Center, 13820 S. Cicero Ave. |
Crestwood issues permits only inside the village. Land in unincorporated Cook County is permitted by the county’s Department of Building and Zoning, and other neighboring addresses belong to their own municipalities.
Crestwood permit types
Crestwood posts four building forms: the contractor registration application, the building permit application, the new construction application and the sign permit application. Paper copies are also available at Village Hall.
Residential permits
- General building permit: the 2025 one-page form records the valuation of the work, the contractor and the owner, the type of job (patio, fence, driveway, shed, repair or other) and a site sketch oriented to north, south, east and west. The office notes whether inspections are required and which ones.
- New house and garage: the new construction application asks for the legal description (block, lot, subdivision and PIN), the building’s breadth, length, height, stories, rooms and floor area, distances from the lot lines, the heating type and every subcontractor from excavator to painter.
- Projects with a survey: patios, sheds, fences, pools and hot tubs need a plat of survey with the application.
- Rental units: owners register each rental property or unit with the village within 30 days of buying or converting it.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Business and commercial work uses the same building forms, and the department reviews the plans before issuing the permit. Signs need the sign permit application, which asks for the sign type, the building’s square footage, the sign’s location and dimensions. A new business also needs a village business license. Owners of vacant buildings must register them with the Building Commissioner within 15 calendar days of the triggering notice or event under Section 161.06 of the village code, paying $200 by certified check or money order and filing an amended form within 15 days of any change.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning certification. The department certifies zoning requirements for properties; the 2025 zoning map, revised July 17, 2025, shows the districts.
- Special uses. A special use is requested under Chapter 10A of the zoning ordinance from the Plan Commission and the Board of Trustees. The petition gives the legal description as an exhibit, the current zoning district, the hardships the present rules cause and the factors favoring the use, and the applicant signs it under oath before filing, with four signed copies filed with the Village Clerk, whose office receives hearing requests and petitions addressed to the Village Board.
- Board meetings. Special-use petitions also go before the Village Board, which meets at 7:00 p.m. on the first and third Thursday, except in July and August, after a Committee of the Whole session usually held the Tuesday before.
- Grading and drainage. Changing a lot’s drainage or grade needs a permit, and larger developments fall under MWRD’s Watershed Management Ordinance, which applies across Cook County.
- Floodways. Construction in a designated floodway also needs an IDNR permit under the Part 3708 rules for suburban Cook County.
- Utility locates. The department’s page reminds owners to call JULIE at 811, a free service, to have underground lines marked before digging for posts, footings or patios.
Crestwood permit costs and fees
Crestwood does not post its building permit rates; the permit fee is entered by the office on the application and must be paid at Village Hall before the permit is issued. The new construction form shows the full list of charges on a new house: building permit, sidewalk permit, water and sewer taps, water meter, contractor water, a street opening bond, a performance bond, driveway blacktop, electrical and plumbing fees, and fees for garages, room additions and dormers. The fees the village does publish are below.
| Item | Amount |
|---|---|
| Contractor registration, general contractor | $100 |
| Contractor registration, subcontractor | $25 |
| Vacant building registration | $200 (certified check or money order); $100 to renew each year while vacant |
| Rental license registration, single-family | $100 every 2 years |
| Rental license registration, multi-family | $75 per unit every 2 years |
| Rental inspection, single-family | $50 every 2 years |
| Rental inspection, multi-family | $100 every 2 years plus $10 per unit over 16 units |
| Water deposit after buying | $100 residential; $150 business; $100 per condo or apartment unit |
Rather talk it over?
Call 1-855-478-4290 →Call the Building Department at 708-371-4800, extension 2006, with the valuation of your work for the permit fee before you file, since the village processes nothing until payment is made in full. Rental registration and inspection fees are paid when the rental application is submitted.
Trade permits and who may pull them
Electrical, gas, mechanical and plumbing installations need permits, and the department’s note on every building page is that all contractors must be registered with the village. Registration is made on the village’s contractor permit application.
- Registration fee: $100 for a general contractor and $25 for a subcontractor, paid before the application is processed.
- Insurance: a certificate of insurance naming the Village of Crestwood as an additional insured.
- Licenses: electricians and plumbers attach a copy of their license; Illinois plumbers are licensed by the Department of Public Health.
- Background: the form asks for all addresses in the last five years, four other municipalities where the business is licensed, any permit denials or revocations and felony convictions, and the applicant consents to a records check that may include fingerprinting.
- Roofing: re-shingling and soffit or fascia work need a permit; roofing contractors hold an Illinois license from the Department of Financial and Professional Regulation.
On a new house, the new construction application lists every subcontractor, including the excavator, mason, carpenter, electrician, plumber, roofer, cement, painter, tile and heating contractors, with phone numbers, and records the heating system: gas, oil, radiant, hot water, vapor, steam or hot air, plus electrical and air conditioning. The village’s pages do not describe homeowner permits for trade work; ask the department before doing electrical or plumbing work yourself.
How to apply for a Crestwood building permit
Compare the job with the department’s permit and no-permit lists, and call 708-371-4800 if it is on neither.
File the contractor permit application with the insurance certificate, license copies and the $100 or $25 fee.
Use the building permit application for most jobs, or the new construction application for a new house and garage.
Attach a plat of survey for patios, sheds, fences, pools and hot tubs, and draw the work on the site sketch.
Drop the package off at Village Hall or mail it, and pay the fee in full.
Pick up the permit at Village Hall and call to book the required inspections.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
The forms page is plain that unpaid applications are not processed, so an application mailed without payment sits until the fee arrives. An unregistered subcontractor, a missing survey on a fence or shed, or a blank valuation line can also hold an application. Special uses go to the Plan Commission and the Board of Trustees, and the board does not meet in July and August.
Inspections and occupancy in Crestwood
To schedule an inspection, call the Building & Zoning Department at 708-371-4800. The permit form records whether inspections are required and lists the ones the job needs, and the building inspector signs the permit. The department issues certificates of occupancy once a new building or major renovation passes its inspections.
Crestwood does not require a village inspection or transfer stamps when a property is sold. Sellers do need a final water reading, scheduled with the Water Department within 48 hours of closing, and must pay the final bill before closing; Public Works reads the meter inside the home and cannot use lockboxes or key codes. The final bill is ready 30 to 45 minutes after the reading. Buyers contact Village Hall within a week of closing to set up billing and pay the water deposit, which stays with the account and is refunded at the owner’s request, once the final bill is paid, when the property is later sold.
Rental property is different: owners register each unit and pay the inspection fee, and the village inspects the unit for compliance with the building, zoning, electrical, plumbing and fire prevention codes. Renters are encouraged to confirm with the village that their landlord holds a current rental license agreement.
Building codes in Crestwood
Crestwood’s building regulations, zoning ordinance and property maintenance rules are in the village code of ordinances, published on American Legal. The department enforces all applicable building codes and zoning ordinances, and it can tell you which code editions apply to your plans. FEMA’s Community Status Book lists Crestwood (community 170080) as participating in the National Flood Insurance Program, with flood maps effective November 1, 2019.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Want this handled start to finish?
Get a free quote →Crestwood permit search and official resources
For a copy of a past permit, certificate of occupancy or zoning certification, start with the Building & Zoning Department at Village Hall (708-371-4800). Formal Freedom of Information Act requests are processed by the Village Clerk’s Office, also at 13800 S. Cicero Avenue (708-371-4800, extension 2003), which keeps the village’s ordinance book, minutes and other municipal records.
- Building & Zoning Department: permit list, contacts and hours
- Construction permits and contractor forms
- Building permit application (2025)
- New construction application, house and garage (2025)
- Contractor registration application (2025)
- Sign permit application
- Special use application
- Vacant building registration form
- Zoning map, revised July 17, 2025
- Buying, selling and renting property
- Village Board and Planning & Zoning Commission schedule
- Village Hall contacts
- Village Clerk’s Office (FOIA requests)
- MWRD Watershed Management Ordinance
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Crestwood building permit FAQs
Do I need a permit to replace windows or siding in Crestwood?
Yes. The department lists windows and doors, new siding, and re-shingling roofs, soffits and fascia among the jobs that need a permit.
What work does not need a permit?
Painting, carpeting, trim work and changing or swapping light fixtures.
How much does contractor registration cost?
$100 for a general contractor and $25 for a subcontractor, with an insurance certificate naming the village as additional insured.
Can I apply online?
The village takes completed paper forms by mail or at Village Hall, and nothing is processed until the fee is paid in full.
How do I schedule an inspection?
Call the Building & Zoning Department at 708-371-4800; Village Hall is open until 8 p.m. on Tuesdays and from 9 a.m. to 4 p.m. on other weekdays.
Does Crestwood inspect homes before a sale?
No. The village requires neither a sale inspection nor transfer stamps, but sellers must arrange a final water reading within 48 hours of closing.
What does a rental license cost?
For a single-family home, $100 registration and $50 inspection every two years; multi-family buildings pay $75 per unit plus a $100 inspection fee, with $10 more for each unit over 16.
Simplify Crestwood permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Crestwood sooner?
Let Alliance prepare, file, and track your Crestwood permits while your crew stays on the job.
More Illinois permitting guides
Cook County
Read guide →Elmwood Park
Read guide →Franklin Park
Read guide →Darien Building Permit Guide
Read guide →De Witt County Building Permit Guide
Read guide →Decatur Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Crestwood permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.