In the Village of Elmwood Park, the Code Administration/Building Department at 11 West Conti Parkway (708-452-3920) issues building, electrical, plumbing and roofing permits and schedules plan review, contractor licenses, business license inspections and pre-sale inspections; Jeff Shea is the Building Commissioner. Applications can be filed on the village’s online fillable forms with a signed contract attached, every contractor must hold a village contractor license first, and the permit form bars construction on Sundays.
What requires a building permit in Elmwood Park?
Elmwood Park’s permit forms set out the work it regulates: a separate new construction application for new buildings, and a “sundry construction” building permit for everything else on a house, apartment building or business, from garages and roofs to fences. Each trade then needs its own permit, because the village’s rule is that each contractor obtains a separate permit.
Building permits
- New buildings, on the new construction application
- Garages, frame or brick
- Roofs, with the village’s roofing information sheet
- Fences, with type and height stated
- Demolition, noted on the sundry application
Trade and other permits
- Electrical work, including service changes that need a meter disconnect
- Plumbing fixtures and water service taps
- HVAC and fire suppression or sprinkler systems
- Dumpsters or storage containers on public property
- Pre-sale listing inspections before a home goes on the market
The sundry form tells applicants not to start work until permits are issued and states that no construction is allowed on Sunday. The village posts no list of exempt work, so call Code Administration at 708-452-3920 before deciding a small job needs no permit.
What Elmwood Park decides and what the state holds
The village picks its own codes, listed on its Applicable Codes page, licenses every contractor who works in town, and runs pre-sale inspections, transfer stamps and property maintenance enforcement. Plumbing follows the Illinois State Plumbing Code; plumbers hold state licenses from the Department of Public Health and roofers state licenses from the Department of Financial and Professional Regulation, and the village wants copies of both before it licenses those contractors.
Elmwood Park building department: who handles permitting
Code Administration has two jobs: building, permitting, inspections and licensing on one side, and code enforcement and property maintenance on the other, including building and housing complaints. Artie Shabez is the Director of Code Administration and Jeff Shea is the Building Commissioner, who also issues permits for dumpsters and containers on public property.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Permit office | Code Administration/Building Department, 11 West Conti Parkway, Elmwood Park, IL 60707 |
| Permits and inspections line | 708-452-3920 (village main line 708-452-7300) |
| code@elmwoodpark.org | |
| Director of Code Administration | Artie Shabez |
| Building Commissioner | Jeff Shea |
| Online forms | Village FormCenter: sundry building permit, contractor license, electrical, plumbing, roofing and dumpster forms |
The village permits only inside its limits. Cook County’s Department of Building and Zoning covers unincorporated land elsewhere in the county.
Elmwood Park permit types
The village’s forms page has two PDF applications, the new construction building permit and the plan review request, and a set of fillable online applications in its FormCenter. The online forms take an electronic signature and file uploads, and a signed contract must be attached to every building permit.
Residential permits
- Sundry construction permit: for work on a single residence or multi-unit building. It asks for garage size and whether it is frame or brick, the roof style, fence type and height, and the total value of the work, leaving out HVAC, plumbing and electrical costs, which are permitted separately.
- Roofing: the roofing information sheet goes with the permit application and requires ice and water shield.
- Electrical: the form records meters, amperage (100, 200 or 400), phase and new circuits from 15 to 60 amps, and warns that a meter disconnect is required.
- Plumbing: fixtures such as bathtubs, backflow preventers, boilers, drain tile, dishwashers, ejectors and floor drains are counted one by one, along with service taps, and the plumber gives bond and license numbers.
- Dumpsters and containers: a dumpster or storage container on public property needs a permit for no more than seven consecutive days, renewable, with reflective markings on every side facing the public way, from a scavenger company licensed by the village.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial and business work uses the sundry form, and new buildings use the new construction application, which records the legal description by sublot, lot, block and subdivision, the class of use (single family, apartment, condominium, business, industrial or accessory), the zoning classification, the building’s dimensions and type of construction, and the total cost. That form lists fees for plan and engineering review, the building permit, electrical, fire suppression or sprinkler, HVAC, plumbing and elevator inspection. The separate plan review request form names the owner and the architect, with contact details for both.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning. The new construction application asks for the zoning classification; the 2019 zoning map shows the districts.
- Plan review. File the plan review request with the architect’s details; the department assigns the permit number.
- Owner consent and taxes. If the applicant does not own the land, the owner signs a consent, and the applicant certifies that special assessments and general taxes are paid.
- Old water service. On new construction the old water service must be disconnected.
- Stormwater and floodways. MWRD’s Watershed Management Ordinance governs development across Cook County, and IDNR permits construction in designated floodways under its Part 3708 rules.
Elmwood Park permit costs and fees
The village does not post its building permit rates on its permit pages; the department calculates the fee from the application. On the sundry form, the valuation that drives the building fee leaves out HVAC, plumbing and electrical costs, since those trades are priced on their own permits. Electrical permits are figured from meters, amperage and circuits, and plumbing permits from each fixture and tap.
| Item | Fee or requirement |
|---|---|
| New construction permit fee lines | Plan and engineering review, building permit, electric, fire suppression or sprinkler, HVAC, plumbing, elevator inspection |
| Contractor license | Village license with $1,000,000 general liability insurance; bond for plumbers, sewer contractors, excavators and demolition |
| Transfer stamps on a sale | $5 per $1,000 of the purchase price ($500 on a $100,000 sale) |
| Exempt transfer stamp | $35 administration fee |
| Dumpster on public property | Permit from the Building Commissioner, up to 7 days, renewable |
| Plumbing inspection under the flood-proofing grant | Free review of the existing system by village plumbing inspectors |
Transfer stamp fees must be paid by cashier’s check, money order, certified check or cash, never by personal check, and the final water bill, which may be paid by personal check, must be settled by the day of closing. For a building permit figure, call Code Administration at 708-452-3920 with the contract amount.
Rather talk it over?
Call 1-855-478-4290 →Trade permits and who may pull them
Every contractor, builder or firm working on buildings in Elmwood Park must be licensed by the village, insured and bonded before starting, and the new construction application cites Section 29-8-A for the rule that all contractors and subcontractors be licensed, bonded and insured at the time of application.
- Insurance: at least $1,000,000 in general liability, with Elmwood Park listed as certificate holder.
- Plumbing: plumbing contractors attach a copy of their state license and a photo ID and post a bond; each plumbing permit records the bond and license numbers.
- Electrical: electrical contractors attach a copy of their registration license and a photo ID; the village follows the 2023 National Electrical Code.
- Roofing: roofers attach a copy of their state license and a photo ID; Illinois roofing licenses come from the Department of Financial and Professional Regulation.
- Bonds: required only for plumbers, sewer contractors, excavators and demolition contractors.
Licensed contractors also agree to remove all debris and keep the premises clean. Each contractor pulls its own permit, so a kitchen remodel can mean separate building, electrical and plumbing permits. The village’s pages do not describe homeowner permits for trade work; ask Code Administration before doing electrical or plumbing work yourself.
How to apply for an Elmwood Park building permit
Each contractor files the online contractor license application with insurance, any state license and photo ID.
Where architect’s drawings need review, file the plan review request with the owner’s and architect’s details.
Use the new construction application for new buildings, or the online sundry construction permit for other work.
Every building permit needs a signed contract, plus any other documents the job requires.
Electrical, plumbing and roofing contractors file their own applications.
Do not start until the permits are issued, and never work on a Sunday.
Review, corrections and what causes delay
An unlicensed subcontractor stops a new construction application, because licensing, bonding and insurance are checked at the time of application. A missing signed contract holds up sundry permits, and a valuation that wrongly includes trade costs has to be corrected. The new construction application also notes that the old water service must be disconnected on a new building. Questions on any of these go to Code Administration at 708-452-3920.
Rather not deal with the building department?
Get a free quote →Inspections and pre-sale rules in Elmwood Park
Permit inspections, plan review, contractor license and business license inspections are all scheduled by calling Code Administration at 708-452-3920. Keep regulated work open until it passes, and follow the electrical form’s meter disconnect instruction when a service is changed.
Selling a home starts with the Notification of Proposed Sale form, filed online or completed at Village Hall with the Code Department (708-452-3942, 708-452-3948 or 708-452-3920). No open house or for-sale sign is allowed until the owner or agent has filed it, and the department then performs a listing inspection. Repairs found at that inspection are checked again at the final transfer stamp inspection, and smoke alarms and carbon monoxide detectors must be in place before any transfer stamps are released, including on foreclosures and short sales. Before closing, the seller files the transfer stamp declaration with a copy of the unsigned deed and the Illinois Real Estate Tax Declaration form. Exempt transfers, such as moving a property into or out of a trust, adding or removing a name on the deed, or a quitclaim deed, need the stamp application, a copy of the signed and notarized deed, a current water account and the $35 fee.
Because the village is served by combined sewers that can back up in heavy rain, it runs a Home Flood Proofing Assistance grant for single-family homeowners. It helps pay for an overhead sewer, which the village strongly recommends, a backflow valve with bypass pump, a lift station, or interior drain tile with a sump pump. The grant does not pay to update or enhance an existing system, but it can help when an old system is replaced entirely.
Building codes in Elmwood Park
The village’s Applicable Codes page lists the 2021 International Building, Residential, Mechanical, Energy and Fuel Gas Codes, the Illinois State Plumbing Code, the 2023 National Electrical Code and the current International Property Maintenance Code. The village code book, with Section 29-8-A on contractors and Section 23-10 on dumpsters, is published on eCode360. FEMA’s Community Status Book lists Elmwood Park (community 170089) as a participant in the National Flood Insurance Program, with flood maps effective August 19, 2008.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Want this handled start to finish?
Get a free quote →Elmwood Park permit search and official resources
Permit and inspection records are requested under the Freedom of Information Act. Requests must be in writing; verbal requests are not accepted. Send the village’s fillable request form to the Village Clerk, who is the FOIA officer, by email, by fax to 708-453-0325 or by mail. The village responds within five working days to non-commercial requests; the first 50 black-and-white pages are free and later pages are $0.15 each. Since January 1, 2026, the village need not follow links in a request, so attach or describe what you need.
- Code Administration/Building Department contacts
- Code and building administration forms
- Applicable codes
- New construction building permit application
- Plan review request form
- Building permit for sundry construction (online)
- Contractor license application (online)
- Electrical permit application (online)
- Plumbing permit application (online)
- Dumpster and storage container authorization
- Notification of proposed sale
- Transfer stamp requirements
- Home flood proofing assistance program
- 2019 zoning map
- FOIA directory and request form
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Elmwood Park building permit FAQs
Can I apply for an Elmwood Park permit online?
Yes. The sundry construction building permit, contractor license, electrical, plumbing, roofing and dumpster applications are fillable online forms; new construction uses a PDF application.
Do contractors need a village license?
Yes. Every contractor must be licensed by the village, insured for at least $1,000,000 in general liability, and bonded if they are a plumber, sewer contractor, excavator or demolition contractor.
Can construction take place on Sunday?
No. The village’s building permit form states that no construction is allowed on Sunday.
What do I need before listing a house for sale?
File the Notification of Proposed Sale and book a listing inspection at 708-452-3920; no sign or open house is allowed until the notice is filed.
How much are transfer stamps?
$5 per $1,000 of the purchase price, or $35 for an exempt transfer, paid by cashier’s check, money order, certified check or cash.
Which codes does Elmwood Park use?
The 2021 International codes, the Illinois State Plumbing Code, the 2023 National Electrical Code and the current International Property Maintenance Code, according to the village’s Applicable Codes page.
Does the village help with basement flooding?
Yes. A grant for single-family homeowners helps pay for overhead sewers, backflow valves, lift stations or drain tile, and village plumbing inspectors will check your current system free.
Simplify Elmwood Park permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Elmwood Park sooner?
Let Alliance prepare, file, and track your Elmwood Park permits while your crew stays on the job.
More Illinois permitting guides
Cook County
Read guide →Franklin Park
Read guide →Glenview
Read guide →Evanston Building Permit Guide
Read guide →Fayette County Building Permit Guide
Read guide →Ford County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Elmwood Park permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.