Clay County government has no building, zoning or planning office: its department list runs from animal control to the treasurer without one, and the County Board’s posted minutes show no zoning or building-permit ordinance. For a home on rural land, the approvals that do apply are a private sewage permit and a well permit from the Clay County Health Department, 601 East 12th Street, Flora ((618) 662-4406), where a septic permit and a well application cost $100 each. FEMA lists unincorporated Clay County among the communities not in the National Flood Insurance Program.
What requires a permit in Clay County?
On unincorporated land, the permits a builder can expect are tied to water and wastewater, not to the building itself. The Health Department regulates every private sewage system that treats 1,500 gallons a day or less and every private water well, and both need its approval before work starts.
Permit needed
- New or replacement private sewage systems (Health Department plan review and permit)
- New water wells, including the pump installation report
- Sealing an abandoned well
- Surface-discharging septic systems: coverage under the federal NPDES general permit where the discharge reaches waters of the United States
No county office for
- Building permits for houses, garages or farm buildings on rural land
- Zoning certificates, setbacks or land-use approvals
- Building-code plan review or framing inspections
Inside a city or village, the municipality’s own ordinances decide whether a permit is needed, so check with that town before building on a lot within its limits.
What Clay County decides and what the state holds
The 14-member County Board passes the county’s ordinances and approves its contracts, but none of the 2025 and 2026 board minutes posted on the county site adopts zoning or a building code. Where the board has dealt with large projects, it has done so by agreement: on September 12, 2023 it approved a memorandum of understanding between Flora Solar, LLC and the county, and it heard updates on Invenergy’s Maple Flats Solar project in December 2023 and December 2024. Septic and well rules come from state codes administered locally by the Health Department: the Illinois Private Sewage Disposal Code and Licensing Act, and the Illinois Water Well Construction Code and pump installation code.
Short on time to read all of this?
Get a free quote →Clay County building department: who handles permitting
With no county building department, the offices that matter for a rural building project in the county’s 12 townships (Bible Grove, Blair, Clay City, Harter, Hoosier, Larkinsburg, Louisville, Oskaloosa, Pixley, Songer, Stanford and Xenia) are the Health Department, the Highway Department, the township road commissioners and the Supervisor of Assessments for parcel records.
| Office | Handles | Contact |
|---|---|---|
| Clay County Health Department, Environmental Health | Private sewage permits and inspections; well construction permits and inspections; abandoned well sealing | 601 East 12th Street, Flora; (618) 662-4406 |
| Engineering / Highway Department (County Engineer Darin Koelm, P.E.) | 127 miles of county highways; engineering help to the 12 township road districts; county and township bridges | 14464 Highway 45 South, Louisville; (618) 665-3346 or 665-3347 |
| Township road commissioners | Township roads and their weight limits | Listed by township on the Highway Department page |
| Supervisor of Assessments | Property tax search and aerial mapping | 111 East Chestnut Street, Louisville; (618) 665-3370 |
| Courthouse | County Clerk & Recorder, County Board and other offices | 111 Chestnut Street, Louisville; (618) 665-3525; Monday to Friday 8 a.m. to 4 p.m. |
Cities and villages in Clay County
The county has six incorporated places: the city of Flora (population 4,634) and the villages of Louisville (1,108), Clay City (816), Xenia (360), Iola (96) and Sailor Springs (87). Each municipality sets its own rules inside its limits; ask the city or village hall about building permits, utility connections and any zoning there. The courthouse is in Louisville, and the Health Department is in Flora.
Clay County permit types
Because the county issues no building permit, the permit types below are the Health Department’s, which apply to homes and businesses alike on land without public sewer or water.
Residential permits
- Private sewage disposal system. Submit a plan review application and fee to the Health Department; a permit is granted if the design meets the Illinois Private Sewage Disposal Code and the Private Sewage Disposal Licensing Act. The application asks for the bedrooms and residents, the water supply and a soil investigation, whose results must be attached for a subsurface system, plus a sketch showing lot lines, the system, distances to wells and water lines, ground elevations and any sanitary sewer within 300 feet. Notify the department at least 24 hours before installation.
- Homeowner installation. A person who owns and lives in a single-family home may be issued a permit to install their own system if they file an application and meet the code.
- Water well. Before a private well is drilled, file an application with the $100 fee, payable to the Illinois Department of Public Health, at the county Health Department, and give 24 hours’ notice before construction. Construction and pump installation reports follow the work.
- Abandoned wells. Unused or damaged wells must be sealed under the state rules the Health Department enforces, using the department’s sealing form.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial buildings in unincorporated Clay County face no county building permit, but the Health Department also monitors non-community water supplies, and its sewage program covers any private system up to 1,500 gallons a day. Larger energy projects have been handled through agreements with the County Board, as with the Flora Solar memorandum of understanding in 2023. Statewide rules for commercial buildings in places without a local code are summarized in the code section below.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Know your jurisdiction. Use the county’s GIS property search or the Supervisor of Assessments to confirm whether the parcel is in a city or village.
- Plan the septic system early. The Health Department grants a permit only for a design that meets the state code, and installation must be by a licensed contractor unless the owner-occupant does it.
- Surface discharges. The U.S. EPA’s NPDES General Permit ILG62, in effect since February 10, 2014, covers new or replacement surface-discharging systems that discharge to waters of the United States; the property owner is responsible for deciding whether coverage is needed.
- Roads. Township roads may carry weight limits, so ask the township road commissioner before heavy deliveries; county highways with seasonal weight-limit signs had their 2026 limits lifted on April 8, 2026.
- Flood risk. FEMA lists the unincorporated county as outside the National Flood Insurance Program; check the January 2025 flood map before building near a stream.
Rather talk it over?
Call 1-855-478-4290 →Clay County permit costs and fees
Clay County charges no building permit fee on rural land because it issues no building permit. The Health Department’s charges are the ones to budget for.
| Item | Fee |
|---|---|
| Water well construction application | $100, payable to the Illinois Department of Public Health |
| Private sewage disposal system permit (plan review application) | $100 |
| County building or zoning permit | None issued |
The sewage page itself does not print the amount, but the department’s plan review application form shows a $100.00 permit fee, so a rural home that needs both a new septic system and a new well pays $200 in Health Department permits before work starts. Inside Flora and the villages, permit and tap fees are set by each municipality.
Trade permits and who may pull them
The county itself issues no electrical, plumbing or mechanical permits. The trade credentials that apply on rural land come from the state and from the Health Department’s programs.
- Septic installers: anyone other than an owner-occupant of a single-family home must be a licensed private sewage disposal installation contractor, or work under the direct supervision of one. The Health Department keeps a list of licensed installers who have worked in the county, and the Illinois Department of Public Health keeps a searchable database of active licenses.
- Well drillers and pump installers: licensed under the Illinois Water Well and Pump Installation Contractor’s Licensing Act, which the Health Department enforces along with the well construction and pump installation codes.
- Plumbing: plumbing work follows the Illinois Plumbing Code, and plumbers are licensed by the Illinois Department of Public Health.
- Roofing: roofing contractors hold a license from the Illinois Department of Financial and Professional Regulation.
Rather not deal with the Clay County building department?
Get a free quote →How to get the permits a Clay County project needs
Check the county GIS property search or call the Supervisor of Assessments at (618) 665-3370.
Flora and the villages set their own permit rules inside their limits.
Work with a licensed installer, or prepare your own plan if you own and will live in the single-family home.
Submit it with the fee to the Health Department in Flora and wait for approval.
File the well application with the $100 fee before drilling.
Call the Health Department at least 24 hours before installing the septic system or building the well.
Review, corrections and what causes delay
The Health Department grants a sewage permit only when the proposed system meets the Illinois Private Sewage Disposal Code and Licensing Act, so ask the department about a design before buying materials. Installers who are not licensed, and helpers not directly supervised by a licensed contractor, may not do the work unless the owner-occupant is installing their own system. For surface-discharging systems, sort out NPDES coverage before you file; the property owner is responsible for deciding whether the system discharges to waters of the United States.
Inspections in Clay County
There are no county building inspections on rural land. Health Department staff inspect new and existing sewage systems and investigate complaints, and they inspect new water well construction, and the department asks for at least 24 hours’ notice before either job starts. The department’s well page posts the water well construction report and pump installation report forms used after the work. The installer’s signature on the sewage application also commits them to notify the department before backfilling over the system. Inside the municipalities, any building inspections are the town’s.
Illinois building code in Clay County
Clay County has adopted no building code for unincorporated land. FEMA’s Community Status Book lists unincorporated Clay County (community 170898) under “Communities Not in the National Flood Program” with a flood map dated January 17, 2025. The county’s pages show no floodplain ordinance or floodplain permit for unincorporated land.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Clay County permit search and official resources
For copies of septic or well permits, ask the Health Department in Flora; for deeds, plats and other recorded documents, the County Clerk & Recorder at the courthouse in Louisville; and for parcel maps, the Supervisor of Assessments or the county’s GIS property search. County Board agendas and minutes are posted on the county site; the board’s 2026 regular meetings were held monthly, most often on the second Tuesday, with the November meeting on November 10, 2026.
- Clay County government and department list
- Clay County Board, agendas and minutes
- Engineering / Highway Department
- Supervisor of Assessments
- Clay County Health Department
- Health Department private sewage program
- Private sewage plan review application ($100 permit fee)
- Health Department water wells
- FEMA Community Status Book, Illinois
Clay County building permit FAQs
Do I need a county building permit to build a house in rural Clay County?
The county has no building or zoning department, so there is no county building permit; a home with a private septic system or well needs Health Department permits for them.
Inspections are where schedules slip.
Get a free quote →How much are the septic and well permits?
$100 each: the septic permit fee printed on the Health Department’s plan review application, and the well application fee, payable to the Illinois Department of Public Health and filed with the county Health Department before drilling.
Can I install my own septic system?
Yes, if you own and live in the single-family home and get a permit; otherwise a licensed installer must do it or supervise it.
Is flood insurance available in unincorporated Clay County?
FEMA lists the unincorporated county under “Communities Not in the National Flood Program,” with a flood map dated January 17, 2025, and the county’s pages show no floodplain ordinance or floodplain permit for rural land.
Who maintains the road in front of my property?
County highways are the Highway Department’s; township roads belong to one of the 12 township road districts and their commissioners.
Where is the Health Department?
601 East 12th Street, Flora, (618) 662-4406.
Do I need a permit inside Flora or Louisville?
That depends on the city or village; each sets its own rules inside its limits, so ask the town hall.
Simplify Clay County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Clay County sooner?
Let Alliance prepare, file, and track your Clay County permits while your crew stays on the job.
More Illinois permitting guides
Effingham County
Read guide →Fayette County
Read guide →Champaign County
Read guide →Clinton County Building Permit Guide
Read guide →Coles County Building Permit Guide
Read guide →Cook County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Clay County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.