Vineyard’s Building Department issues and inspects building permits inside the city, with applications and inspection requests handled in its CityInspect portal.

Authority: Vineyard Building DepartmentFiling: CityInspect builder portalPhone: 801-226-1929
Authority
Vineyard Building Departmentbuilding@vineyardutah.gov
Filing
CityInspect builder portalPermit Desk completeness check
Inspections
Portal or 801-226-1929Request by 4:00 p.m. the day before
2025 population
16,092U.S. Census Bureau estimate

Vineyard’s Building Department issues building permits for work inside the city, and every application, correction and inspection request goes through its CityInspect builder portal. The permit fee is set from project valuation on the City’s Consolidated Fee Schedule, with plan review at 65% of that fee and a further 10% for fire inspection and plan review; impact fees are charged when the permit is issued.

What requires a building permit in Vineyard?

Vineyard’s building permit application covers these kinds of work, and the City posts separate submittal requirements for several of them:

Residential

  • New homes and additions
  • Remodels and repairs
  • Basement finishes, including basements finished earlier without a permit
  • Solar
  • Pools
  • Standby generators

Commercial

  • New buildings and additions
  • Tenant finish of a shell and tenant improvements
  • Signs
  • Solar and repairs

A basement finished without a permit still needs one, and any concealed work, including drywall, cabinets and fixtures, has to be opened up for inspection. Work done without a permit is fined $100 per infraction, doubling for each later infraction.

Who issues building permits in Vineyard?

The City’s Building Department reviews plans, issues building permits and inspects construction inside Vineyard, including the electrical, mechanical and plumbing work listed on the application. Fire inspection and plan review are charged as 10% of the building permit fee, and the fire inspection fees follow Orem Fire’s schedule. Engineering and Public Works handle encroachment permits, driveway approaches and site inspections. Unincorporated land outside the city falls to Utah County Community Development.

Vineyard Building Department contact
DetailInformation
Phone801-226-1929
Emailbuilding@vineyardutah.gov
City office hoursMonday to Thursday, 8:00 a.m.–5:00 p.m.; Friday, 8:00 a.m.–noon
InspectionsMonday to Friday, 8:00 a.m.–5:00 p.m.
ApplyCityInspect builder portal (vineyard.cityinspect.com)

Short on time to read all of this?

Get a free quote →

Vineyard permit applications and the CityInspect portal

New users register for a builder account, then sign in at vineyard.cityinspect.com and choose Apply for a new permit. You can start a new application or copy details from an existing permit, fill in the permit, builder and building information, upload every required document and click Submit Permit. The Permit Desk then checks the application for completeness.

Plan review status shows in the portal: white means not yet reviewed and yellow means reviewed with corrections. Corrections are answered in the portal by opening Plan Review, choosing the area marked Needs Corrections and attaching revised files.

Forms on the City’s Resource Documents page include the Building Permit Application (also in Spanish), the Owner Builder Certification Form, a 2nd Kitchen Acknowledgement Form, a Special Inspection Agreement, the Set Water Meter Request, a TSSD Pre-Treatment Survey for commercial users and an exemption policy for mechanical ventilation. The application names the general, electrical, mechanical and plumbing contractors, each with a licence number.

Vineyard permit costs and fees

Building permit fees come from the City’s Consolidated Fee Schedule (the latest version posted is the April 2026 amendment of the 2025-2026 schedule). The fee is read from the project’s total valuation; the Building Department values new work with the ICC Building Valuation Data.

Vineyard building permit fee by total valuation
Total valuationPermit fee
$1–$1,300$86
$1,301–$2,000$86 plus $3 for each added $100 or fraction
$2,001–$40,000$107 plus $11 for each added $1,000 or fraction
$40,001–$100,000$525 plus $9 for each added $1,000 or fraction
$100,001–$500,000$1,065 plus $7 for each added $1,000 or fraction
$500,001–$1,000,000$3,865 plus $5 for each added $1,000 or fraction
$1,000,001–$5,000,000$6,365 plus $3.50 for each added $1,000 or fraction
Over $5,000,000$20,354 plus $2 for each added $1,000 or fraction

Not sure this scope needs a permit?

Get a free quote →
Other Vineyard building fees
ItemFee
Plan review, residential or commercial65% of the building permit fee
Simple or duplicate plan review25% of the building permit fee
Fire inspection and plan review10% of the building permit fee
Re-inspection$75 an hour
Inspection outside business hours$75 an hour, 2-hour minimum
Added plan review for changes$85 an hour, 1-hour minimum
Reinstating an expired permit$50 plus any added review time
Water meter and connection, 3/4 inch / 1 inch$580 / $795
Final grading bond, residential lot$1,000 up to 1 acre, $500 for each added half acre
Impact fees charged when the permit is issued
FeeAmount
Drinking water$4,207.49 per ERU (or by meter size)
Parks and recreation$3,422.88 per household
Roadway$3,586 per trip end in Area A, $1,286 in Area B (RDA)
Sewer facilities$637 per ERU
Storm and ground water$222, $337 or $237 per ERU in Areas A, B and C
Timpanogos Sanitary Sewer District or Orem Water ReclamationPassed through at that agency’s current impact fee (Timpanogos: $5,793 per ERU in 2026, $6,171 from January 1, 2027)

Rather talk it over?

Call 1-855-478-4290 →

The schedule prints $20,354 as the base for projects over $5,000,000, although the band below it adds up to $20,365 at $5,000,000. A basement finished before the house’s certificate of occupancy is valued with the ICC data like the rest of the house. A basement finished after occupancy is charged the cost of 5 inspections plus the plan review fee and any surcharges or impact fees.

Electrical, plumbing and mechanical permits in Vineyard

Trade work is permitted by the Building Department as part of the building permit: the application lists the electrical, mechanical and plumbing contractors and their licence numbers. A generator permit needs the manufacturer’s specifications, a gas line schematic, a photo of the electrical panel and an electrical plan showing the connection. Pool plans must show GFCI receptacles within 20 feet of the inside of the pool wall and the electrical bonding.

Commercial MEP drawings must each be stamped by a licensed engineer, and commercial users that discharge to the sewer complete the Timpanogos Sanitary Sewer District pretreatment survey.

Application documents and plan review

Commercial

  • Architectural drawings stamped by a licensed architect
  • Structural drawings and calculations stamped by a licensed engineer
  • Lighting, mechanical and plumbing drawings stamped by an MEP engineer
  • Geotechnical study
  • COMcheck for envelope, lighting and mechanical
  • Site and civil plan and a landscaping plan

Pool

  • Scaled site plan with existing buildings and distances to property lines
  • Fence enclosure location and height, gate location and the self-closing gate detail
  • Pool equipment location and GFCI receptacles
  • Elevations showing depth and slope
  • Engineer-stamped plans or a current ICC evaluation report
  • Mechanical equipment specifications

Rather not deal with the building department?

Get a free quote →

An architect must prepare and stamp the plans for new commercial buildings, tenant finish of a shell, and tenant improvements that change the use or occupancy or alter more than 3,000 sq ft. Houses are designed to the City’s residential design criteria, which include a 30-inch frost depth, the Utah snow load study and FEMA flood maps. Vineyard does not publish a plan review time; reviews are tracked stage by stage in the portal.

How to apply for a Vineyard building permit: 6 steps

1. Register a builder account

Use the new-user link on the Building page to register in CityInspect.

2. Get any HOA architectural approval

The application makes the owner and builder responsible for Architectural Review Committee approval; the City does not obtain it.

3. Start a new application

Choose Apply for a new permit, then enter the permit, builder and building information.

4. Upload and submit

Attach every document on the relevant submittal list and click Submit Permit for the Permit Desk’s completeness check.

5. Clear corrections

Answer items marked Needs Corrections by attaching revised files in the portal.

6. Pay and start within 180 days

Pay the permit and impact fees; the permit lapses if work does not start within 180 days or stops for 180 days.

Inspections in Vineyard

Request inspections in CityInspect (open the permit, click Request Inspection and pick the type) or by calling 801-226-1929 during business hours; voicemail requests are not honored. The cut-off is 4:00 p.m. the day before, as there are no same-day inspections, and an email confirms when staff have scheduled the visit. Inspections run Monday to Friday, 8:00 a.m. to 5:00 p.m.

For a new home, the water meter must be set before final inspections can be scheduled, and the meter has to go in before any landscaping. File the Water Utility Agreement when you request the meter. Re-inspections cost $75 an hour.

Local Vineyard details that matter

Second kitchens: a home with a second kitchen needs the City’s 2nd Kitchen Acknowledgement Form.

Sewer: the City collects the Timpanogos Sanitary Sewer District or Orem Water Reclamation sewer impact fee, whichever applies, as a pass-through at that agency’s current rate. The Timpanogos district (called the Timpanogos Special Service District until June 22, 2026) raises its fee to $6,171 per ERU for permits issued from January 1, 2027 under Resolution 2026-11.

Want this handled start to finish?

Get a free quote →

Street work: an encroachment permit costs $150 plus $1 per square foot of disturbed asphalt, and a driveway approach inspection after it costs $250 for up to 2 inspections.

Permit activity: the City posts a monthly report of active building permits on its Resource Documents page.

Utah building code

Utah adopts one construction code for the whole state; cities and counties enforce it, and any local amendments are set by the Legislature. Utah rules

Official Vineyard permitting resources

City and state sources:

Inspections are where schedules slip.

Get a free quote →

Vineyard building permit FAQs

How much is a building permit in Vineyard?

It follows the valuation table: for example, a $100,000 valuation costs $1,065, plus 65% of that fee for plan review and 10% for fire inspection and plan review. Impact fees are added when the permit is issued.

How do I apply?

Online in the CityInspect builder portal; register first, then submit the application and documents for the Permit Desk’s completeness review.

How do I schedule an inspection?

Request it in CityInspect or call 801-226-1929 by 4:00 p.m. the day before. Same-day and voicemail requests are not accepted.

Do I need an architect for a commercial remodel?

Yes if the remodel changes the use or occupancy or alters more than 3,000 sq ft, and always for new commercial buildings and shell tenant finishes.

What if my basement was finished without a permit?

Apply for a basement permit; concealed work must be exposed so it can be inspected like any new basement finish.

Can a homeowner pull the permit?

Yes, with the Owner Builder Certification Form from the City’s Resource Documents page.

Simplify Vineyard permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Utah. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Vineyard sooner?

Let Alliance prepare, file, and track your Vineyard permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Vineyard permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.