American Fork, Utah Building Permit Guide

The American Fork City Building Department issues building and trade permits inside the city, with applications and inspection requests filed online in CityInspect.

Authority: American Fork City Building DepartmentCode: 2024 IBC, IPC, IMC and IECC; 2023 NECPhone: 801-763-3060
Authority
American Fork City Building DepartmentBuilding, electrical, plumbing and mechanical permits
Applications
CityInspect portalZoning Clearance Letter first for many projects
Inspections
CityInspect, 1 working day aheadNo same-day inspections
2025 population
41,020U.S. Census Bureau estimate

The American Fork City Building Department issues building, electrical, plumbing and mechanical permits inside the city, and every application is filed online in CityInspect; many projects first need a free Zoning Clearance Letter. The permit fee comes from a valuation table, plan review adds 65% of that fee, and new-home plans carry a $1,000 plan review deposit when they are submitted.

What requires a building permit in American Fork?

The Building Department applies the state code’s rule: building, enlarging, altering, repairing, moving or demolishing a structure, changing its occupancy, or installing or changing electrical, gas, mechanical or plumbing systems needs a permit first. Its FAQ names the outdoor projects people most often ask about.

Permit needed

  • New homes, additions, remodels and basement finishes
  • Detached garages and sheds over 200 sq ft
  • Pools and spas
  • Roofing and exterior siding
  • Decks, patio covers and awnings
  • Retaining walls and fences
  • Generators, solar and electrical meter upgrades
  • Gas lines for fire pits and barbecues

No building permit

  • Buildings under 200 sq ft, which must still meet the setbacks and code rules of the zone
  • Under the fence ordinance the department posts (2011-10-26), fences and walls up to 48 inches high

A shed over 400 sq ft needs a footing and foundation detail with its plans. No structure of any size, including a pool, detached garage or patio cover, may sit in a public utility easement.

Who handles American Fork building permits?

The City’s Building Department reviews plans, issues permits and inspects construction inside American Fork, including the electrical, plumbing, mechanical and gas work. Dan Loveland is the Chief Building Official. The Planning and Zoning Division issues Zoning Clearance Letters, and the Fire Department reviews fire sprinkler and alarm plans.

Unincorporated land outside the city limits is handled by Utah County Community Development, which serves only areas that are not inside a city.

American Fork Building Department contact
DetailInformation
OfficeBuilding Department, 275 East 200 North, American Fork, UT 84003
Phone801-763-3060
HoursMonday to Thursday, 7:00 a.m.–5:30 p.m.; closed Fridays
Chief Building OfficialDan Loveland
Apply and book inspectionsCityInspect portal (afcity.cityinspect.com)

American Fork permit types and the CityInspect portal

American Fork takes building applications only through CityInspect, which also handles fee payment and inspection requests. Projects follow two steps:

Short on time to read all of this?

Get a free quote →
  • Step 1, Zoning Clearance Letter. Filed in the Planning and Zoning module of CityInspect, at no charge. Anyone who registered in CityInspect before November 2025 has to register again to reach that module, keeping the same login and password.
  • Step 2, building permit. Filed in the building module once the letter (if needed) has been issued.
Which American Fork permits need a Zoning Clearance Letter
ProjectBefore the building permit
Accessory apartment (ADU), residential accessory structure, residential addition, residential retaining wallZoning Clearance Letter
Signs of all types, commercial tenant improvementZoning Clearance Letter
New commercial building, commercial addition or accessory structure, apartments and mixed-use, cell tower, commercial fence, pool or retaining wallZoning Clearance Letter and a Notice of Action letter from development review
New house or manufactured home, basement finish or walkout, deck or patio, residential fence or pool, remodel, roof, solar, demolition, electrical, plumbing, mechanical, meter upgrade, utility connection, storage rackingNeither

A Notice of Action letter comes out of the City’s development review process, after a decision by the Development Review Committee, Planning Commission or City Council, and is uploaded with the building application.

Forms the department posts: a Subcontractor List, a Property Owner Builder Affidavit, an Electrical information form and Meter Upgrade Information Form, and a link to the state’s owner-builder certification for homeowners doing their own work. Permits for multifamily housing, non-owner-occupied housing and commercial or industrial buildings are issued only to a licensed and bonded contractor.

Building permit fees in American Fork

American Fork’s FY 2026-2027 General Fee Schedule, adopted and effective July 1, 2026, sets the plan review and inspection charges. The permit fee itself is read from the department’s valuation table: the plans examiner values the project by square foot, and the total valuation sets the fee.

Valuation rates on the department’s fee table
AreaValuation per sq ft
Main level and second level$169.09
Finished basement$75
Unfinished basement$31.50
Garage$44
Porch or carport$30

Not sure this scope needs a permit?

Get a free quote →
American Fork building permit fee by valuation
Total valuationPermit fee
$1–$500$23.50
$501–$2,000$23.50 plus $3.05 for each added $100 or fraction
$2,001–$25,000$69.50 plus $14 for each added $1,000 or fraction
$25,001–$50,000$391.25 plus $10.10 for each added $1,000 or fraction
$50,001–$100,000$643.75 plus $7 for each added $1,000 or fraction
$100,001–$500,000$993.75 plus $5.60 for each added $1,000 or fraction
$500,001–$1,000,000$3,233.75 plus $4.75 for each added $1,000 or fraction
Over $1,000,000$5,608.75 plus $3.65 for each added $1,000 or fraction
Other American Fork building fees (FY 2026-2027)
ItemFee
Plan review, residential or commercial65% of the permit fee
Plan review, identical plans30% of the permit fee
Plan review deposit, new home$1,000 when plans are submitted
Plan review minimum, other permits$50
Up-front plan review, new commercial / tenant improvement$1,000 / $500
Expedited review$400 on top of the regular plan review fee
State surcharge1% of the building permit fee
Re-inspection$175 per unit
Cancelling an inspection within 3 days$125 per unit
Occupancy fee$50 residential, $150 commercial
Temporary power / construction water (residential)$100 each
Inspection outside working hours$200 for up to 2 hours, then $100 an hour
Work started without a permit (fine on top of the permit fee)Residential: $1,500 on an existing structure, $3,000 on a new structure (new footings); commercial: $5,000 existing, $10,000 new (new footings)

Once plan review has started, the plan review fee is not refunded. For identical plans, the adopted fee schedule, which controls, sets 30% of the permit fee; the Building Department page still says 30% of the plan review fee. The department’s older residential checklist still mentions a $500 plan review fee at submittal, but its fee page sets the deposit for a new home at $1,000. Card payments over $300 carry a 3% processing fee.

A new single-family home also pays impact and connection fees from the same schedule:

Rather talk it over?

Call 1-855-478-4290 →
New single-family home: impact and connection fees (FY 2026-2027)
FeeAmount
Culinary water impact (3/4-inch meter)$2,502.45
Sewer impact (3/4-inch meter)$840.08
Timpanogos Sanitary Sewer District sewer impact, plus the City’s $15 processing fee$5,793 per ERU through December 31, 2026; $6,171 from January 1, 2027
Roads impact (outside transit-oriented areas)$3,548.30
Parks and recreation impact$3,855.99
Fire / police impact$429.30 / $326.45
Pressurized irrigation impact$0.42 per irrigated sq ft
Storm drain impact$0.15 per gross sq ft
Water and pressurized irrigation hook-up (3/4-inch)$475 each
Sewer hook-up$235

The sewer district, renamed the Timpanogos Sanitary Sewer District on June 22, 2026, sets its own impact fee: it is added to the building permit but paid over to the district. Its Resolution 2026-01 lowered the fee from $5,931 to $5,793 per ERU from January 23, 2026, and Resolution 2026-11, adopted September 17, 2026, sets $6,171 for permits issued from January 1, 2027 (district phone 801-756-5231). The Building Permit Fees page still lists the sewer hook-up at $475 and omits the parks and storm drain impact fees; the adopted schedule above is the controlling document.

Electrical, plumbing and mechanical permits in American Fork

Trade permits come from the Building Department, not the State, and are filed in CityInspect like any other permit. Stand-alone electrical, plumbing, mechanical, meter upgrade and solar permits need no Zoning Clearance Letter. A meter upgrade is filed with the department’s Electrical Meter Upgrade submittal and information forms, and the adopted schedule charges $100 for an electrical meter change-out and $50 for a gas line review.

A solar application needs a site plan with fire-code clearances, roof mounting and uplift engineering, a one-line diagram and a photo of the panel being back-fed; code violations in that panel must be fixed as part of the job.

The American Fork Fire Department reviews fire sprinkler and alarm plans and charges its own fees on the City schedule (Fire Marshal review is $125 an hour).

Application documents and plan review

Everything is uploaded in CityInspect, and the department will not accept an incomplete submittal. The site plan must be drawn to scale and show the whole lot, the existing home, the new work, every building and shed, setback dimensions and public utility easements. Owner-drawn plans are accepted for personal projects if drawn at 1/4 inch to 1 foot or larger, though the department may ask for an engineer’s stamp.

Rather not deal with the building department?

Get a free quote →

New home

  • Project valuation, on an approved lot with subdivision improvements complete
  • Plot plan with lot, house and setback dimensions
  • Wet-stamped structural calculations
  • Floor plans with electrical layout, door and window sizes, joist layout and labeled rooms
  • Wall sections from footing to roof, stair and roof details, beam sizes
  • Energy code compliance (REScheck) showing lot, subdivision and plan number
  • Gas pipe sizing diagram and Manual J, D and S summary
  • Electrical load, elevations and a contractor and subcontractor list

Commercial

  • Code analysis and site plan approval
  • Utility, landscape and drainage plans with calculations
  • Floor plans with electrical, mechanical and plumbing
  • Electrical load report and one-line diagram; COMcheck or ASHRAE 90.1
  • Structural calculations and a geotechnical observation study
  • Water use in gallons per day and the TSSD grease trap and pretreatment survey
  • Utah County Board of Health compliance for food preparation
  • Recorded plat, at least 2 elevations and a traffic impact study

Reverse (mirrored) house plans are not accepted. Commercial plans need every applicable wet stamp, and the City accepts neither deferred submittals nor separate footing and foundation permits. Lots in sensitive lands need a soils report and Engineering Division approval before plans are submitted. The City does not publish a plan review time.

How to apply for an American Fork permit: 6 steps

1. Look up the parcel and zone

Find the parcel number on the Utah County parcel map and the zone on the City zoning map; both go on the clearance application.

2. Check the clearance table

Use the Building Department’s Zoning Clearance Letter checklist to see whether your project needs a letter, a Notice of Action letter or neither.

3. Get the Zoning Clearance Letter

Apply in the Planning and Zoning module of CityInspect; there is no fee. Name files as FileName_ProjectName_YYYYMMDD_Version.

4. File the building permit

Upload the application, plans and checklist items in the CityInspect building module and pay the plan review deposit or fee.

5. Answer plan review

Revise plans when the plans examiner asks; revisions are billed at $50 an hour for homes and $100 an hour for commercial work.

6. Pay, build and book inspections

Pay the permit, impact and connection fees, then request each inspection in CityInspect at least one working day ahead.

American Fork building inspections

Inspections are requested online in CityInspect only, at least one working day ahead; there are no same-day inspections and none can be arranged with an inspector in the field. Select every inspection the job needs, then watch for the confirmation email, which gives the date and whether it is a morning or afternoon visit.

Want this handled start to finish?

Get a free quote →
  • Morning visits run 7:30–11:30 a.m. and afternoon visits 1:00–4:30 p.m., Monday to Friday, with none over the noon hour.
  • Solar, mechanical final and sign inspections happen 10:00–11:30 a.m. or 3:00–4:30 p.m.
  • Concrete inspections get a one-hour window; name it when you book.

If the work is not ready when the inspector arrives, a $175 re-inspection fee can be charged, and cancelling within 3 days of the visit costs $125. No further inspections can be booked until those fees are paid in CityInspect. A permit expires after 180 days without an inspection, and restarting the work then takes a new permit with new fees and any newer code rules. The adopted schedule fines an occupancy violation $100 plus $30 a day.

Local American Fork details that matter

Sewer district: wastewater goes to the Timpanogos Sanitary Sewer District, whose impact fee and grease trap rules apply on top of the City’s.

Accessory apartments: basement and accessory apartments fall under Development Code 17.5.134, and an ADU needs a Zoning Clearance Letter before the building permit.

Fences: the posted ordinance allows fences up to 6 feet only inside the “Tall Fence Enclosure Area” of a residential lot; taller fences need a specific reason, such as a pool enclosure. A commercial fence needs zoning clearance and a Notice of Action letter.

Utah building code

Utah adopts one construction code for the whole state; cities and counties enforce it, and any local amendments are set by the Legislature. Utah rules

Official American Fork permitting resources

City and state sources:

Inspections are where schedules slip.

Get a free quote →

American Fork permit FAQs

How much is a building permit in American Fork?

It depends on valuation. A project valued at $100,000 has a $993.75 permit fee, plus 65% of that fee for plan review and a 1% state surcharge; a new home also pays impact and hook-up fees, the largest being the sewer district’s impact fee of $5,793 per ERU (rising to $6,171 on January 1, 2027).

Do I need a Zoning Clearance Letter?

For ADUs, residential additions, accessory structures and retaining walls, signs, tenant improvements and most new commercial work, yes. A new house, basement finish, deck, roof, solar or trade permit does not need one.

Do I need a permit for a shed or fence in American Fork?

A shed or other building under 200 sq ft does not, but it must meet setbacks. The posted fence ordinance requires a permit for fences and walls over 48 inches.

Can a homeowner pull their own permit?

Yes, for work on the home you live in, with the owner-builder paperwork; you are then responsible for the work meeting code. Multifamily, non-owner-occupied, commercial and industrial permits go only to licensed and bonded contractors.

How do I schedule an inspection?

Request it in CityInspect at least one working day ahead. There are no same-day inspections, and the confirmation email gives the date and a morning or afternoon slot.

How long is a permit good for?

It expires after 180 days with no inspection, so book an inspection before that period runs out.

What is the Building Department phone number?

801-763-3060, Monday to Thursday, 7:00 a.m. to 5:30 p.m.

Simplify American Fork permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Utah. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in American Fork sooner?

Let Alliance prepare, file, and track your American Fork permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about American Fork permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.