Building permits in Orem are issued by the Building Safety Division of the city’s Community Development Department, 56 North State Street (801-229-7198), with applications through the city’s online submittal system, My City Inspector. Fees are set in the city budget: the building fee is worked out from ICC valuation data and the 1997 Uniform Administrative Code tables, plan review is the lesser of 65% of the permit fee or the actual cost, and a failed inspection that needs a call-back costs $125. Orem permits separately from Provo and from Utah County, whose Building Division serves unincorporated areas only.
Work inside Orem city limits. Provo, Vineyard, Lindon and Utah County are separate authorities.
Two Orem rules pull in opposite directions. Fence permits do not require building permits and should not be filed through the building portal — unless the fence is masonry or concrete, or includes a retaining wall. But heating and air conditioning installations or replacements need a permit, and so do water heater installations or replacements; the city says permits for this kind of minor work can normally be completed within one business day.
What requires a permit in Orem?
The City of Orem Building Safety Division issues building permits for work inside Orem city limits. Orem sits immediately north of Provo in Utah County and permits entirely separately from it, and from Utah County, whose Building Division serves unincorporated areas only. The Provo-Orem boundary runs through continuous urban development, so the postal address does not settle which city permits a lot.
The city requires full online submittal for building permits, which means creating an account in the online submittal system before you can file. Once registered, the Building Permit Portal is where you check the progress of an application and schedule or view inspections.
Permit required
- New homes, room additions, attached or detached garages, patio enclosures and porch or patio covers
- Decks over 30 inches above grade, and storage sheds over 200 square feet (120 square feet on commercial or multi-family lots of 4 or more units)
- Basement and room finishes, remodels that move walls, windows or doors, and any structural repair or modification
- Heating and air conditioning, boiler and water heater installations or replacements, gas lines, gas logs and fireplaces
- Electrical and plumbing work, solar panels, swimming pools, hot tubs and spas
- Reroofing and siding, and replacing windows or doors where the opening size changes
- Retaining walls 4 feet or more above grade or supporting a surcharge, and masonry or concrete fences over 7 feet
No building permit
- One-story detached storage sheds 200 square feet and smaller on one- and two-family lots (120 square feet on commercial or multi-family property, which still needs site plan approval)
- Fences other than masonry or concrete, which still need a separate fence permit
- Wood decks under 30 inches above grade with no roof and no guard rail needed, concrete patios without roofs and sidewalks on private property
- Replacing plumbing fixtures, light fixtures, switches or outlets, cabinets and countertops, floor coverings, painting and minor roof repairs
- Retaining walls under 4 feet that carry no surcharge, prefabricated pools under 24 inches deep, and grade-level storage conex boxes under 350 square feet
- Drive approaches, which need an engineering permit instead
Utah adopts one construction code for the whole state; cities and counties enforce it, and any local amendments are set by the Legislature. Utah rules
Orem building department: who handles permitting
Registration comes first. The city requires full online submittal, so you register on CityInspect (which the city calls My City Inspector), receive a temporary password by email and then set your own. Each building needs a separate application, plans go in as PDFs in the field labeled for each document type, and on commercial work the application names the tenant rather than the corporate owner. Residential jobs that need no plans, such as a re-roof, siding, a new air conditioner or an electrical service change, are still filed online; they take at least one business day to process, and some are approved the same day. New commercial or multi-family buildings and additions need site plan approval through the city’s development review process first.
The fence rule follows the structure. An ordinary fence is a zoning question — height, location, sight lines — and goes through the separate online fence permit. Masonry or concrete fences, and fences that include a retaining wall, go through the building permit portal; the city’s 2026 permit list names masonry or concrete fences over 7 feet and retaining walls 4 feet or more high, and the planning fee schedule charges $440 to review a concrete or masonry fence.
Building without a permit doubles the fees here — all of them. The schedule doubles the building permit fee including its plumbing, electrical and mechanical portions, rather than the building portion alone. A call-back for a re-inspection costs $125, other inspections with no listed fee cost $73, and inspections outside normal working hours start at $151.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Authority | City of Orem Building Safety Division, Community Development, 56 North State Street, 2nd Floor, Orem, UT 84057; 801-229-7198 for questions and inspections |
| Other listed numbers | The city directory gives 801-229-7059 for the building department and 801-229-7060 for inspections; the inspection handouts use 801-229-7060 |
| Submittal | Full online submittal; an account is required |
| Portal | My City Inspector (CityInspect), for applications, progress and inspection results |
| Fences | Separate fence permit; masonry, concrete or retaining-wall fences go through the building portal |
| Mechanical | Heating and air conditioning installations or replacements need a permit |
| Plumbing | Water heater installations or replacements need a permit |
| Unpermitted work | Doubles all permit fees, across every discipline |
| Re-inspection | $125 per required call-back |
| Governing code | 2021 IRC, 2024 IBC, IMC, IPC, IFC, IFGC and IECC, 2023 NEC, 2024 ISPSC, 2006 Utah Wildland-Urban Interface Code (as of July 1, 2026) |
| Design criteria | Wind 105 mph, seismic D1–E, frost depth 30 in, winter design temperature 8°F, ice shield underlayment required |
| County | Utah County permits unincorporated areas only, not Orem |
Orem, Provo and Utah County are three different permitting authorities. Orem and Provo share a boundary running through continuous urban development, and Utah County's Building Division serves unincorporated areas only — it cannot permit an Orem address at all. Vineyard, Lindon, Pleasant Grove and Springville are separate again.
In 2025, building permits issued in Orem authorized 26 new privately owned housing units, all of them single-family homes, according to the U.S. Census Bureau Building Permits Survey.
Orem permits: record types and what each covers
The record catalog is conventional. Orem’s one-page permit list spells out which routine replacements need a permit and which jobs need no building permit at all.
Residential permit types
| Permit type | What triggers it | Review path | Fee basis |
|---|---|---|---|
| New construction | New dwellings, additions, and accessory structures above the local size threshold | Plan review against the state-adopted 2021 International Residential Code with Utah amendments, plus zoning and setbacks | Valuation-based |
| Addition | Added conditioned or unconditioned space attached to an existing dwelling | Structural and energy review; since 1 July 2026 houses follow Utah's own energy chapter in the residential code, with one set of insulation values statewide | Valuation-based |
| Renovation / alteration | Structural changes, layout changes, or added plumbing, mechanical, or electrical | Plan review scaled to scope; a change that alters egress, structure, or a system is reviewed even where the footprint does not move | Valuation-based |
| Reroof | Roof covering replacement, recover, and structural deck repair | Deck and dry-in inspection; plan review rarely required, but a change of assembly type can trigger a structural check | Valuation or squares |
| Solar photovoltaic | Rooftop or ground-mount arrays, with or without battery storage | Single local review covering both the structural attachment and the electrical scope; there is no separate state electrical record in Utah | Flat or system-size based |
| Battery energy storage | Wall or floor-mounted storage added to a dwelling | Electrical review plus fire separation, ventilation, and location check | Flat or per-permit minimum |
| Electrical | Service changes, panel upgrades, new circuits, EV chargers, meter sets, and rewiring | Local trade review and local inspection against the 2023 National Electrical Code, which applies statewide | Per-permit or per-device |
| Plumbing | New piping, repipes, fixtures, gas piping, and water heater replacement | Local trade review; performed by a contractor holding the matching state licence classification and qualifier | Per-permit minimum or per-fixture |
| Mechanical / HVAC | Changeouts, new ductwork, and refrigeration | Local trade review; changeout volume is heavy given Utah heating loads and wide seasonal swings | Per-permit minimum or per-unit |
| Patio cover and shade structure | Attached and detached covers, ramadas, and carports | Structural review for wind uplift and attachment, plus zoning for setbacks and lot coverage | Valuation or flat |
| Swimming pool | In-ground and above-ground pools and spas | Barrier, bonding, and electrical review; the state code adopts the residential provisions of the 2024 International Swimming Pool and Spa Code | Valuation or flat |
| Manufactured home set-up | Placing or re-siting a manufactured or modular home | Federal HUD label for manufactured homes or a state decal for modular units, with local zoning, floodplain, foundation, and utility connection review | Flat or per-unit |
| Demolition | Full or partial demolition of a dwelling or accessory structure | Utility disconnect confirmation, dust control where earthmoving is involved, and site restoration check | Flat |
| Mechanical replacement permit | Heating and air conditioning installations or replacements | Required; on the city’s 2026 permit list | Per the city schedule |
| Water heater permit | Water heater installations or replacements | Requires a permit; on the city’s 2026 permit list | Per the city schedule |
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permit types
| Permit type | What triggers it | Review path | Fee basis |
|---|---|---|---|
| New commercial construction | Ground-up commercial, industrial, and institutional buildings | Concurrent review against the state-adopted 2024 International Building Code with Utah amendments, plus fire and zoning | Valuation-based |
| Tenant improvement / upfit | Interior fit-out of an existing tenant space | Building, trade, and life-safety review; accessibility attaches on change of use | Valuation-based |
| Change of occupancy | Converting a building or space to a different use group | Occupancy classification, egress, and accessibility review | Valuation or flat |
| Commercial electrical | Service, distribution, and branch circuit work | Local trade review and local inspection; Utah has no central state electrical permit for either residential or commercial work | Per-permit or valuation |
| Commercial plumbing | Process piping, fixtures, backflow, and grease waste | Local trade review; backflow and grease interceptor sign-off where applicable | Per-fixture or valuation |
| Commercial mechanical | Rooftop units, kitchen exhaust and hood systems, and refrigeration | Local trade review; hood and suppression systems draw fire review alongside mechanical | Per-unit or valuation |
| Commercial reroof | Roof covering replacement on a commercial structure | Deck, dry-in, and attachment inspection | Valuation or squares |
| Signage | Wall, ground, and illuminated signs | Zoning review for size and placement, plus electrical where illuminated | Flat or per-sign |
| Grading and drainage | Clearing, grading, and site work that alters drainage | Civil review of grading and drainage, separate from the building permit | Acreage or valuation |
| Dust control permit | Earthmoving, trenching, and construction dust on a qualifying site | Utah Division of Air Quality, not the building department; a fugitive dust control plan is required for qualifying sites larger than a quarter acre | Set by the Utah Division of Air Quality where a dust control plan is required |
| Commercial demolition | Full or partial demolition of a commercial structure | Utility disconnect, asbestos notification, dust control, and site restoration | Flat or valuation |
| Masonry or concrete fence | Masonry or concrete fences over 7 feet, or fences that include a retaining wall | Filed as a building permit, unlike an ordinary fence | Per the city schedule |
| Unpermitted work | Work started before a permit issued | Doubles all permit fees across every discipline | Double the normal fee |
Rather talk it over?
Call 1-855-478-4290 →For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
Residential
- Building and trade permits are issued and inspected by the same local authority
- There is no separate state electrical permit — electrical is a local record
- A state contractor licence in the correct classification is required, with a named qualifier where the classification demands one
- Properties on septic need on-site wastewater approval before ground is broken
Commercial — multi-discipline
- Concurrent review across building, trades, fire, and zoning
- Signed and sealed plans across every affected discipline
- The licensee's classification must match the actual scope of work
- Accessibility and life-safety review attach to any change of occupancy
Records you will actually see in Orem
| Record | What it covers |
|---|---|
| Building permit | New construction, additions, remodels and alterations |
| Mechanical permit | Heating and air conditioning installations or replacements |
| Plumbing permit | Water heater installations or replacements |
| Electrical permit | Service changes, panel work and new circuits |
| Masonry or concrete fence | Filed as a building permit, unlike an ordinary fence |
| Retaining wall | Also filed through the building permit route |
| Solar photovoltaic permit | Arrays, inverters and battery storage |
| Basement finish | A common Orem residential record |
| Certificate of occupancy | Once every required inspection is clear |
Solar permits in Orem
Solar in Orem is permitted and inspected by the city under Utah's statewide adopted editions, filed through the city's online submittal system. The Utah rule governing every trade here is the edition split: the building, plumbing, mechanical, fuel gas and energy codes moved to their 2024 editions in July 2026, while the residential code stayed on 2021 and the electrical code on 2023. Reading the building code year and inferring the electrical year gets rapid shutdown, labelling and conductor requirements wrong. The city’s solar checklist asks for a site plan, the mounting system with roof weights and rafter or truss details, a one-line diagram, module and inverter specification sheets (inverters listed to UL 1741), and the total array power, and residential snow load is taken from the USU snow load calculator linked on the codes page.
Installing here? Alliance handles solar permit filing and the utility interconnection paperwork.
Roofing permits in Orem
A roof covering replacement is permitted work and follows the ordinary sequence. Reroofing and siding appear on the city’s list of outside work that needs a permit, and a re-roof is one of the plan-free jobs the city can approve the same day. Ice shield underlayment is required.
Solar and roofing work follow the statewide code, and utilities run interconnection on their own timeline. Utah rules
Roofing crews can hand this off: Alliance takes care of roofing permit expediting through to the issued permit.
Orem permit cost
Orem’s code says permit fees are whatever the City Council sets in the annual budget, and the schedule sits in Exhibit B of the budget. The building safety figures are the same in the “FY 2026 Adopted” and “FY 2027 Proposed” columns of the FY 2026-27 tentative budget, and the council adopted the final budget after its August 27, 2026 hearing. The schedule prices a building permit from ICC valuation tables and the 1997 Uniform Administrative Code tables, which it does not reprint, so the exact permit fee comes from the city’s assessment in the portal.
Rather not deal with the building department?
Get a free quote →| Item | Fee |
|---|---|
| Building permit | Valuation from the ICC building valuation tables, priced on Table 3A of the 1997 Uniform Administrative Code (with 2023 revisions), plus Tables 3B–3D for electrical, plumbing and mechanical work |
| Electrical, mechanical or plumbing permit only | $40 base fee plus the matching 1997 UAC table (3B, 3C or 3D) |
| Basement finish in an existing home | $40 base fee plus 1.5% of the valuation, plus Tables 3B–3D |
| Demolition; sign | $40 base fee plus Table 3A |
| Plan review (commercial and residential) | The lesser of 65% of the permit fee or the actual cost |
| Fast-track plan review | Residential $291 minimum plus $88 an hour over 2 hours; commercial under $5 million $811 minimum plus $88 an hour over 4 hours |
| Plan review required by changes | $114 minimum plus $73 an hour over half an hour |
| Required inspection call-back (re-inspection) | $125 |
| Other inspections; outside normal hours | $73 plus $73 an hour over 1 hour; $151 plus $88 an hour over 2 hours |
| Temporary certificate of occupancy | Residential $250 ($100 refunded if finished within 30 days); commercial $390 |
| Improvement bond, new single-family home on a developed lot; addition over 500 sq ft | $1,000; $200 |
| Building without a permit | Double the building permit fee, including plumbing, electrical and mechanical |
| Refund, permit not issued; issued but no work done | 100% or 80% of the permit fee; the city keeps the plan review fee |
Orem collects these impact fees itself; the budget describes its fire impact fee as a one-time charge imposed at building permit issuance. The city also runs the water and sewer utilities that charge the connection fee, and lots in the Southwest Service Area pay higher water, sewer and storm water impact fees.
| Fee | Amount |
|---|---|
| Water impact | $1,603.01 ($3,004.07 in the Southwest Service Area) |
| Water supply impact | $2,804 |
| Sewer impact | $846.90 ($4,876.90 in the Southwest Service Area) |
| Storm water impact | $2,128.02 per acre ($10,979.73 in the Southwest annexation area) |
| Transportation impact | $458.98 |
| Parks impact | $2,903.80 |
| Fire impact; police impact | $217.70; $120.69 |
| Water connection fee | $436.80 |
Orem trade permits
The trades are permitted and inspected by the city under Utah's statewide adopted editions. A stand-alone electrical, mechanical or plumbing permit carries a $40 base fee plus the matching 1997 Uniform Administrative Code table.
Electrical permits
Required for service changes, panel work, new circuits, solar and EV charging. The city lists the 2023 NEC. For a service change, book Rocky Mountain Power’s disconnect at least 48 hours ahead and the city’s meter-change inspection at least 24 hours ahead (801-229-7060, 8am to 5pm); the utility will not reconnect without the Building Safety Division’s clearance.
Alliance handles electrical permit applications for contractors here. More on this: who pulls the electrical permit.
Plumbing permits
Required for new piping, repipes, fixtures and water heater installations or replacements, which are on the city’s 2026 permit list. A tankless water heater also needs a gas line drawing showing every existing and new appliance.
Mechanical permits
Required for ductwork, ventilation, boilers, gas lines and fireplaces, and heating and air conditioning installations or replacements. The residential plan checklist asks for heat loss calculations to ACCA Manual J, a ductwork layout and a gas line drawing with every appliance’s BTU rating.
Fences and retaining walls
An ordinary fence needs the separate online fence permit, not a building permit. Masonry or concrete fences, and fences with a retaining wall, go through the building portal; the 2026 permit list names masonry or concrete fences over 7 feet, and retaining walls 4 feet or more above grade, as needing permits.
Contractors are licensed by the state Division of Professional Licensing, and a business licence must name a qualifier. Utah rules
Orem plan submittal checklist
Building Safety publishes checklists for residential plans, basement finishes, remodels, swimming pools, solar, mobile homes in existing parks, demolition and commercial plans. The residential checklist says plans cannot be reviewed without these items, and mirrored-image plans are not accepted:
- A complete application: contractor with Utah licence number, owner, architect and structural engineer contacts, project address and legal description
- A plot plan with lot dimensions, the footprint and distances to every property line, easements, corner elevations, sewer and water laterals and any retaining walls (walls 4 feet or higher need their own permit)
- Foundation, floor and framing plans, all four elevations with finish materials, and cross-sections specific to the building
- Wet-stamped structural calculations; truss layouts and engineering, usually deferred until delivery, with the engineer of record’s approval letter
- HVAC plan with Manual J heat loss calculations, ductwork layout and gas line drawing; plumbing fixture and floor drain locations; electrical plan with service size, sub-panels, GFCI, smoke and CO detectors
- Stair, handrail and guardrail details, roof ventilation calculations and energy compliance
Want this handled start to finish?
Get a free quote →The residential checklist still prints the 2021 IBC and 2015 residential energy provisions; the city’s adopted codes page, updated for July 1, 2026, is the current list. An owner acting as builder files the city’s owner-builder form. Properties on septic need onsite wastewater approval from the Utah County Health Department’s Environmental Health division (151 South University Avenue, Provo; 801-851-7525) before ground is broken.
Orem permit application: how to apply step by step
Here is how to get a building permit in Orem, from confirming the requirement through to close-out. Each step below corresponds to a real decision point where projects commonly stall.
Provo shares a boundary running through continuous development, and Utah County cannot permit an Orem address because it serves unincorporated areas only.
Register on CityInspect through the city’s registration link; the temporary password arrives by email. File a separate application for each building and attach each PDF in its labeled field.
Heating and air conditioning, boiler and water heater installations or replacements need permits, as do reroofing, siding and decks over 30 inches. Plan-free jobs like these are normally processed within one business day.
An ordinary fence does not need a building permit and should not go through the building portal. A masonry or concrete fence, or one with a retaining wall, does.
Orem lists the 2021 IRC, the 2024 IBC and trade codes and the 2023 NEC as of July 1, 2026, with 105 mph wind, seismic category D1–E and a 30-inch frost depth; take residential snow load from the USU calculator.
Track the application in the portal, pay the assessed fees, then call 801-229-7198 to schedule inspections with the address, permit number and inspection type; a call-back for work that was not ready costs $125.
Inspections in Orem
Building Safety asks you to call 801-229-7198 to schedule inspections; its 2025 inspection handout and the city directory give 801-229-7060 as the inspection request line. Have the job address, the permit number and the inspection type ready. The inspections record in the portal lists the inspections a job may need, results are posted there, and the handout says to call before covering anything up. A required call-back for a re-inspection costs $125.
The common sequence is footing (setbacks measured and the Ufer ground located before concrete), foundation, underground plumbing, electrical and mechanical, shear, weather barrier and flashing, the rough inspection once the roof, windows, doors and all systems are in, lath or stucco, permanent power so Rocky Mountain Power can set the meter, and the final once fixtures are in and exterior grading and any retaining walls are complete. Commercial jobs add accessibility, above-grid and special inspections, and fire sprinkler and alarm tests ending in a fire marshal final.
Close-out follows the ordinary sequence to the certificate of occupancy once every required inspection has passed. A temporary certificate of occupancy for a house costs $250, with $100 refunded if the work is finished within 30 days.
Utah law lets you use a third-party inspection firm when the building department cannot inspect within three business days. Utah rules
Orem permit search and official resources
These are the primary Orem and Utah sources behind this guide. The city’s adopted codes page lists the editions in force from July 1, 2026.
Inspections are where schedules slip.
Get a free quote →- City of Orem building permits
- Utah Code Title 15A, State Construction and Fire Codes Act
- Utah Code Section 15A-2-103, adopted code editions
- Utah DOPL contracting
- Utah DOPL licence lookup
- Utah State Fire Marshal plan review
- Utah State Construction Registry
- Orem Building Safety Division
- Orem building permit account registration (CityInspect)
- Orem guide to submitting through My City Inspector
- Orem: when do I need a building permit? (2026)
- Orem adopted codes and design criteria (July 1, 2026)
- Orem forms, applications and submittal checklists
- Orem building inspection information
- Orem electric service change scheduling
- Orem FY 2026-27 tentative budget, Exhibit B fee schedule (building fees unchanged from FY 2026)
- Orem city finances and budget documents
Frequently asked questions
Do I need a permit to replace my furnace or air conditioner?
Yes. Orem’s permit list includes heating and air conditioning installations or replacements. A permit for this kind of minor work is normally completed within one business day, and work started without one pays double fees.
Do I need a permit to replace a water heater?
Yes. Water heater installations and replacements are on the city’s permit list; a tankless unit also needs a gas line drawing of every existing and new appliance.
Do I need a permit for a fence?
Not a building permit, but a Fence Permit. Orem states that fence permits do not require building permits and asks that you not apply for them through the building permit portal — they are submitted online as a separate Fence Permit — unless the fence is masonry or concrete, or includes a retaining wall, in which case a building permit is needed.
How do I apply?
Through full online submittal. The city requires it, which means creating an account in the online submittal system. After registering, the Building Permit Portal is where you check application progress and schedule or view inspections.
What happens if I build without a permit?
The city doubles all permit fees — building, electrical, plumbing and mechanical — rather than only the building record. On a project that should have carried several trade permits, that is a substantial multiple.
Is there a re-inspection fee?
Yes. A required call-back for a re-inspection costs $125 under the budget fee schedule, and other inspections with no listed fee cost $73.
How much is a building permit in Orem?
The fee depends on the project’s valuation from ICC tables and the 1997 Uniform Administrative Code fee tables, which the city applies in the portal. Plan review adds the lesser of 65% of the permit fee or the actual cost, and stand-alone trade permits start at a $40 base fee. A new single-family home also pays impact fees, such as $2,903.80 for parks and $1,603.01 for water in the City Service Area.
Do I need a permit for a shed or deck in Orem?
Not for a one-story storage shed of 200 square feet or less on a one- or two-family lot, or a wood deck under 30 inches high with no roof and no guard rail needed. Larger sheds, decks over 30 inches and any patio cover need a building permit.
Which codes apply?
Utah's statewide adopted editions under Title 15A. The building, plumbing, mechanical, fuel gas, energy, existing building and pool codes moved to 2024 editions in July 2026; the residential code remains 2021 and the electrical code 2023.
Can Utah County permit my Orem project?
No. Utah County's Building Division serves only unincorporated areas of the county and says so on its own page. Orem permits its own work, as do Provo, Vineyard, Lindon, Pleasant Grove and Springville.
Do I need a permit for a retaining wall in Orem?
Yes, once the wall is 4 feet or more above grade, or at any height if it supports a surcharge. It is filed through the building portal, and the residential plans checklist treats a wall 4 feet or higher as a separate permit from the house.
How do I schedule an electric service change?
Give Rocky Mountain Power 48 hours’ notice for the disconnect and the city 24 hours’ notice for the meter-change inspection on 801-229-7060, between 8am and 5pm. Rocky Mountain Power reconnects only after Building Safety clears the work.
What does a temporary certificate of occupancy cost?
$250 for a house, of which $100 comes back if the work is finished within 30 days and the house was not occupied illegally, and $390 for a commercial building; apartment and condominium buildings start at $390.
Do I need a licensed contractor?
Utah licenses contractors through the Division of Professional Licensing, and a business licence must name a qualifier; Orem’s application asks for the contractor’s state licence number. An owner doing the work themselves files the city’s owner-builder form instead.
Simplify Orem permitting with Alliance Permitting
Orem publishes which replacements need a permit, which fences do not, and what unpermitted work costs. Using that clarity is most of the job. Alliance Permitting prepares, files and tracks Orem permits through issuance.
Trusted by leading builders, developers, and national contractors — 21+ years of filing in the jurisdictions we write about.
Contractors and builders choose Alliance for Orem because the work is done by people who have stood at the counter:
- We pull the furnace, air conditioning and water heater permits on Orem’s 2026 permit list.
- We route fences correctly, so ordinary fences do not clog the building queue.
- We file before work starts, because the doubling here applies across every discipline.
- We file with the city, since Utah County cannot permit an Orem address at all.
Alliance Permitting is a permit documentation and expediting service in Utah. We are not a law firm and do not provide legal advice, and we are not the permitting authority.
Ready to break ground in Orem sooner?
Let Alliance prepare, file, and track your Orem permits while your crew stays on the job.
More Utah permitting guides
Provo building permits
Read guide →Utah County building permits
Read guide →Lehi building permits
Read guide →Payson Building Permit Guide
Read guide →Pleasant Grove Building Permit Guide
Read guide →Riverton Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Orem permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.