Cayuga County does not issue building permits. The City of Auburn, the 23 towns and the 9 villages each run a code enforcement office, many with short weekly hours and several sharing one officer. The county shapes projects in three other ways: its Health Department enforces a sanitary code that reviews new septic systems and requires an inspection whenever a property is sold, its Highway Department permits every driveway and every piece of work in a county road right-of-way, and a county committee reviews referred zoning actions each month.
What requires a building permit in Cayuga County?
Local lists set the details. The Village of Aurora says any construction project, no matter how small, must go through its code enforcement officer, and its fee schedule prices sheds, decks, porches, garages, barns, pools, roofs, generators, solar systems, fireplaces and wood stoves, and heating, plumbing and electrical work; siding and windows need a permit there too. Scipio posts separate roof, demolition and solar permit forms, and Ledyard has its own floodplain permit.
Common permit items
- New homes, additions and alterations
- Decks, porches, garages, barns and sheds
- Roofs, and in Aurora siding and windows
- Pools, generators and solar systems
- Heating, plumbing and electrical systems
- Demolition
County permits, not local ones
- New septic systems: plan review by the county Health Department
- Septic inspection and pumping before any property sale
- Driveways and any work in a county road right-of-way
What the towns, villages and city decide and what the state holds
All 33 municipalities apply the 2025 Uniform Code and Energy Code. Their own decisions are zoning (Montezuma adopted a new zoning ordinance in 2019, Ira in 2021, Scipio in 2024, and Mentz amended its ordinance in November 2025), fees, office hours and local laws such as Fair Haven’s short-term rental inspections. Cayuga County has kept its share of enforcement duty; it is not among the twelve counties the Department of State lists as opted out.
Cayuga County building department: who handles permitting
Each row below is a city, town or village the Census counts in Cayuga County. A town office stops at the line of any village inside it; the table says which village is excluded. Auburn has a full guide on this site.
Short on time to read all of this?
Get a free quote →| Place | Who issues building permits | Official page |
|---|---|---|
| Auburn (city) | City Code Enforcement Office, Memorial City Hall; see the Auburn guide | Code Enforcement Office |
| Aurelius (town) | Town codes office; Cayuga village excluded | Town of Aurelius |
| Brutus (town) | Town office; Weedsport village excluded | No official page found |
| Cato (town) | Town office; Cato and Meridian villages excluded | Town of Cato |
| Conquest (town) | Town code officer, Mondays 10 am to 2 pm | Town of Conquest |
| Fleming (town) | Town building inspector (shared with Conquest and Sennett) | Town of Fleming |
| Genoa (town) | Town code office, Wednesday mornings | Town of Genoa |
| Ira (town) | Town office; part of Cato village excluded | Town of Ira |
| Ledyard (town) | Town code officer, Saturdays 10 to noon; Aurora village excluded | Town of Ledyard |
| Locke (town) | Town code enforcement officer | Town of Locke |
| Mentz (town) | Town code enforcement; Port Byron village excluded | Town of Mentz |
| Montezuma (town) | Town code officer, Town Hall, Tuesdays 4 to 6 pm | Town of Montezuma |
| Moravia (town) | Town code enforcement; Moravia village excluded | Town of Moravia |
| Niles (town) | Town office; building permit and fee forms online | Town of Niles |
| Owasco (town) | Town office; ask the town clerk | Town of Owasco |
| Scipio (town) | Town office; 2025 fee schedule posted | Town of Scipio |
| Sempronius (town) | Town office; zoning board page only | Town of Sempronius |
| Sennett (town) | Town code officer by appointment (shared with Conquest and Fleming) | Town of Sennett |
| Springport (town) | Town code office, Wednesday hours; Union Springs excluded | Town of Springport |
| Sterling (town) | Town Code Enforcement Office; Fair Haven village excluded | Town of Sterling |
| Summerhill (town) | Town code officer (shared with Venice) | Town of Summerhill |
| Throop (town) | Town office; ask the town clerk | No official page found |
| Venice (town) | Town code officer, Monday late mornings | Town of Venice |
| Victory (town) | Town code officer, Tuesdays 4 to 6 pm | Town of Victory |
| Aurora (village, in Ledyard) | Village code enforcement officer for every project | Permits, licenses, apps |
| Cato (village, in Cato and Ira) | Village code enforcement | Code Enforcement |
| Cayuga (village, in Aurelius) | Village zoning and code enforcement | Village of Cayuga |
| Fair Haven (village, in Sterling) | Village code enforcement officer | Village of Fair Haven |
| Meridian (village, in Cato) | Not shown on an official page; ask the village office | No official page found |
| Moravia (village, in Moravia) | Village building permits | Building permit application |
| Port Byron (village, in Mentz) | Village code enforcement | Code Enforcement |
| Union Springs (village, in Springport) | Village government with its own zoning law; ask the village office | Zoning law |
| Weedsport (village, in Brutus) | Village code enforcement | Code Enforcement |
Not sure this scope needs a permit?
Get a free quote →Many town pages live on the county’s own website, which hosts sites for Cato, Conquest, Fair Haven, Ira, Locke, Mentz, Montezuma, Moravia, Sempronius, Sterling, Summerhill, Venice and Victory. One officer covers Conquest, Fleming and Sennett, and another covers Venice and Summerhill, so office hours are short and often by appointment. Numbers posted by the towns include Conquest’s code office at 315-776-6064, Sennett’s at 315-253-3712 ext. 6, Genoa’s at 315-364-5505, Ledyard’s at 315-364-5707 ext. 6, Venice’s at 315-729-3921 and Montezuma’s at 315-776-4777. The Village of Cato straddles the Cato–Ira town line, and Meridian sits in the Town of Cato.
Rather talk it over?
Call 1-855-478-4290 →What Cayuga County itself does
- Health Department, septic program: enforces the Cayuga County Sanitary Code, which requires periodic septic inspections and an inspection at every property transfer; reviews plans for new and repaired systems; and keeps lists of registered installers and pumpers.
- Highway Department: issues driveway permits for county roads, checks sight distance and installs the driveway pipe itself for a fee based on pipe size; any other construction or maintenance in the county right-of-way needs a right-of-way permit, some with deposits.
- Planning & Economic Development: staffs the GML 239-l, m & n Review Committee, set up by Legislature Resolution 413-05 in 2005, which meets monthly at the Highway Department on York Street; the department is at 160 Genesee Street, Auburn (315-253-1276).
Cayuga County permit types and applications
Residential permits
Homeowners use the town or village form: Conquest, Locke, Summerhill, Venice and Victory post building permit applications on their county-hosted pages, Ledyard posts its permit application and fee sheet, Sennett its building and zoning application with fee and insurance sheets, and Moravia village its own application. In Auburn, applications go in by email, mail or the City Hall drop box and fees are paid after approval.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial work needs plans from a New York licensed design professional and usually site plan approval. Aurora inspects commercial and public assembly buildings for fire safety for $30 to $90 depending on the one- to three-year cycle and charges any village engineer review back to the applicant before the final inspection. Site plans such as those the review committee took up in August 2026 from Aurelius and Sterling go through the county referral first.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Rather not deal with the Cayuga County building department?
Get a free quote →What comes before the building permit
- Local approval of the development: needed before the county will approve a driveway onto a county road.
- County 239 review: for referred site plans, special use permits, variances and zoning changes.
- Septic plans: county review of a new or repaired system on any lot without sewer.
- Zoning boards: variances and special permits; Aurora charges $50 for an area variance and $75 for a use variance or special use permit.
Building permit fees in Cayuga County
Every municipality sets its own fees. Two posted schedules show the range: the City of Auburn’s, detailed in the Auburn guide, and the Village of Aurora’s schedule updated in January 2026.
| Work | City of Auburn | Village of Aurora (January 2026) |
|---|---|---|
| New house | $200 plus $0.40 per sq ft | $0.20 per sq ft, $200 minimum |
| Addition | See the Auburn guide | $0.20 per sq ft, $200 minimum |
| Renovation or alteration | See the Auburn guide | $0.15 per sq ft, $100 minimum |
| Deck or unheated porch | See the Auburn guide | $0.15 per sq ft, $75 minimum |
| Garage, barn or shed | See the Auburn guide | $0.15 per sq ft ($100 minimum garages; $25 sheds to 100 sq ft) |
| Heating, plumbing or electrical system | Separate plumbing and HVAC permits | $75 |
| Roof, pool | See the Auburn guide | Roof $75; pool $50 above ground, $75 in ground |
Worked example for a 1,500-square-foot new house: Auburn charges $200 plus 1,500 times $0.40, or $800; Aurora charges 1,500 times $0.20, or $300, which already includes the certificate of occupancy. Aurora doubles the fee when work starts without a permit, keeps permits valid for one year and renews them at half the original fee. Scipio posted a new fee schedule for 2025, and Victory, Ledyard, Niles and Sennett post theirs with their forms.
Trade permits and who may pull them
The county publishes no trade or contractor license. Where a municipality says how electrical work is inspected, it relies on third-party agencies: Auburn names three agencies it accepts, and Aurora requires inspection by a certified electrical inspector on top of its $75 permit for heating, plumbing and electrical systems. Septic installers are a county matter; the Health Department keeps the list of registered installers and pumpers, and only a Cayuga County certified inspector may do the routine or property-transfer septic inspection. Proof of workers’ compensation and disability coverage, or the state exemption form, comes with every local application.
Want this handled start to finish?
Get a free quote →How to get a building permit in Cayuga County
Use the table; a village inside a town has its own code officer.
Many town officers keep one or two short sessions a week; call or email for an appointment.
Clear any variance, special use permit or site plan, allowing for the monthly county review.
Submit the septic design to the county and, after local approval, apply for a county driveway permit if needed.
Lodge the local application with plans, insurance proof and the fee.
Book inspections with the local officer and collect the certificate of occupancy or compliance.
Review, corrections and what causes delay
Auburn’s plan review takes about eight business weeks; a town office that opens once a week may need longer. Common holdups are a driveway onto a county road that the county cannot permit until the town approves the development, a septic design still under county review, and a zoning question that has to wait for the board and the county committee.
Inspections and certificates
Building inspections are scheduled with the local code officer, who issues the certificate of occupancy or compliance at the end; in Aurora that certificate is included in the permit fee. Electrical inspections come from the approved third-party agency. Septic systems have their own county track: a passing property-transfer inspection plus proof of pumping leads to a county discharge permit, and that inspection stays valid for one year.
The county describes the test itself: the inspector adds dye to fixtures and runs water through the system, 55 gallons per bedroom in an occupied home or 110 gallons per bedroom over three days in an empty one for a sale, and 20 gallons per bedroom, up to 100 gallons, for a routine inspection. If a system fails, the owner must correct the violation.
New York building code
New York builds on one statewide code, the Uniform Code, outside New York City; the 2025 edition and 2025 Energy Code took effect on 31 December 2025 (the all-electric provisions remain suspended by court order). Cities, towns and villages administer it, and local standards stricter than the code need Code Council approval. The Uniform Code in New York
Cayuga County’s 33 local programs apply that one code; the county’s sanitary code adds the septic rules.
Cayuga County permit FAQ
Does Cayuga County issue building permits?
No. Each city, town and village issues its own. The county handles septic plan review and sale inspections, county road driveways and right-of-way work, and 239 referrals.
Do I need a septic inspection to sell a house?
Yes. The county Sanitary Code requires the system to be inspected and the tank pumped before any property transfer; inspect first, because after pumping you must wait 30 days.
Inspections are where schedules slip.
Get a free quote →Can I get a county driveway permit before town approval?
No. The county will not approve a driveway for a development until the local municipality has approved the development.
Who permits in the Village of Aurora?
The village code enforcement officer, for every construction project however small; the Town of Ledyard’s officer covers the rest of the town.
How much is a permit for a new house in Aurora?
$0.20 per square foot with a $200 minimum under the schedule updated in January 2026, doubled if work starts first.
Who reviews referred zoning actions?
The county’s GML 239-l, m & n Review Committee, which meets monthly at the Highway Department, 91 York Street, Auburn.
Does the Town of Brutus or Mentz permit inside Weedsport or Port Byron?
No. Weedsport, in Brutus, and Port Byron, in Mentz, each have their own village code enforcement pages; the town offices cover only the land outside those villages.
Is my municipality in the flood insurance program?
Yes. FEMA lists all 33 Cayuga County communities as participating, so mapped flood zones need a local floodplain permit.
Cayuga County permit search and official resources
Ask the issuing town, village or city for permit and certificate records, or make a Freedom of Information Law request to its clerk. Septic inspection reports and discharge permits are filed with the county Health Department.
- Cayuga County towns and villages
- Septic system installation and inspection, county Health Department
- County highway driveway and right-of-way permits
- GML 239 Review Committee agenda, August 20, 2026
- Village of Aurora building permit fees, January 2026
- NYS Department of State Code Inspection Unit
- FEMA Community Status Book, New York
- NYS code adoption and enforcement updates
Simplify Cayuga County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in New York. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Cayuga County sooner?
Let Alliance prepare, file, and track your Cayuga County permits while your crew stays on the job.
More New York permitting guides
City of Auburn
Read guide →Onondaga County
Read guide →Town of Camillus
Read guide →Chautauqua County Building Permit Guide
Read guide →Town of Cheektowaga Building Permit Guide
Read guide →Chemung County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Cayuga County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.