City of Auburn, New York Building Permit Guide

To get a building permit in City of Auburn, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Building, plumbing and HVAC permits inside the City of Auburn come from the Code Enforcement Office in Memorial City Hall, 24 South Street; applications go in by email, mail or the City Hall drop box, and fees are paid only after approval.

Authority: City of Auburn Code Enforcement OfficeCode: 2025 NYS Uniform Code, Municipal Code ch. 125Phone: 315-255-4111
Authority
Code Enforcement OfficeMemorial City Hall, 24 South St.
Apply
Email, mail or drop boxPay after the approval notice
New house fee
$200 + $0.40 per sq ftPlan review about 8 business weeks
Electrical
City-designated agenciesThree authorized inspection agencies

Inside Auburn city limits, the Code Enforcement Office in Memorial City Hall, 24 South Street, issues building, plumbing/HVAC, driveway and sign permits and the city’s certificates of occupancy. Applications are sent by email, mail or the City Hall drop box with no payment; the office notifies you when the permit is approved and the fee is due. A new house costs $200 plus $0.40 per square foot, and its plan review takes about 8 business weeks.

What requires a building permit in Auburn?

The office’s fee page doubles as Auburn’s list of permit work. It also names the common jobs that need no permit at all.

Permit needed

  • New houses, additions, attached garages and carports
  • Interior renovations and remodels
  • Decks, open porches and ramps
  • Detached garages and sheds of any size
  • Fences, pools and driveways (new, expanded or resurfaced)
  • Roofs, windows, doors, soffit and fascia
  • Generators, solar arrays, fireplaces, stoves and chimneys
  • Retaining walls, foundation repairs and demolition
  • Plumbing and HVAC work (separate application)

No permit

  • Painting
  • Carpeting and floor covering above the sub-floor
  • Deck repairs under 50 sq ft
  • Roof repairs under one square

The office notes that this list is not exhaustive. The fee web page also names siding, but the July 2026 permit fee sheet leaves siding out, so ask before re-siding.

What the city decides and what the state holds

Construction standards are the state Uniform Code and Energy Code, which Auburn enforces with its own Municipal Code: Chapter 125 for building construction (including the electrical inspection article), alongside Chapters 178, 182, 230 and 305, which the office also enforces. The city sets its own fees, setbacks, historic district review and certificate-of-occupancy triggers.

Auburn building department: who handles permitting

The Code Enforcement Office issues permits, answers housing code complaints, takes applications for the Zoning and Planning Boards and makes certificate of occupancy and home occupancy inspections. It covers the city only: the towns that surround Auburn are separate municipalities, so confirm on the Cayuga County tax map that a parcel is inside the city before filing here.

City of Auburn Code Enforcement Office
DetailInformation
OfficeCode Enforcement Office, Memorial City Hall, 24 South Street, Auburn, NY 13021
Phone315-255-4111
Fax315-255-4188
HoursMonday–Friday, 8 am–4 pm
FilingEmail to Code Enforcement, mail, or the City Hall drop box

The city has warned of a phishing scam aimed at people with planning, zoning and code applications, so send documents only to the office’s published contacts and pay the city directly.

Short on time to read all of this?

Get a free quote →

Auburn permit types and applications

Residential permits

The Application for Building Permit and a Plot Plan cover most house projects; drawings or plot plans are required for fences, pools, new construction, accessory structures, additions and driveways. The forms page adds separate applications for plumbing/HVAC, driveway, curb cut or parking expansion, dwelling unit conversions and reinstatements, short-term rentals, and excavation in the city right-of-way for sewer and water. Placement rules from the city’s construction requirements:

  • Sheds and detached garages: no larger than 784 sq ft, no taller than 20 ft at the peak, 6 ft from the house, 3 ft from side and rear lines, never in the front yard.
  • Decks: 3 ft from side and rear lines and not in the front yard.
  • Fences: may go up to the property line with footers on your own land; front-yard fences are limited to 4 ft.
  • Pools: 10 ft from property lines and 6 ft from the house; above-ground pools need 48-inch walls with a lockable ladder or a fence, and fences must be 48 inches high with a self-latching gate.
  • Solar and generators: solar arrays use the New York State unified solar permit application; for generators the office asks owners to consult Codes staff on the requirements.

Commercial permits

Commercial work covers every property outside the residential group. A job of $20,000 or more needs stamped New York architectural plans: two sets and one digital set on the fee web page, three sets on the July 2026 permit fee sheet. Commercial plan review for new buildings, exterior renovations and interior remodels takes about 8 business weeks. A commercial solar array is $200 plus any consultant review costs in the adopted 2026–2027 schedule; the July 2026 fee sheet adds the commercial building fee on top.

What comes before the building permit

  • Historic district: exterior work needs a Certificate of Appropriateness from the Historic Resources Review Board first.
  • Zoning: area and use variances and special use permits are filed through the same office for the Zoning and Planning Boards.
  • Sewer and water: a new building also needs a request to connect to city sewer and water, made through the city’s engineering department.
  • Floodplain: FEMA lists Auburn as a participating community in the National Flood Insurance Program (current flood map dated August 2, 2007), so check the flood map before designing on low ground.

Other city setbacks from the construction requirements page:

City of Auburn setbacks for common projects
StructureSetback
Attached garage7 ft from side lines; 20 ft front and rear
Pole barn style garage6 ft from the house; 5 ft from side and rear lines
Porch10 ft from any property line; no more than 10 ft into the required front yard
New single-family house, R-1 district7 ft side; 25 ft rear; 20 ft front

Not sure this scope needs a permit?

Get a free quote →

Auburn building permit fees

Fees come from the city’s Codes and Zoning Fee Schedule 2026 to 2027, which the office repeats on its Permit Fees & Information page and its July 1, 2026 permit fee sheet, and are paid after approval: by check to the City of Auburn, or by card with a $3 processing fee under $100 and 2.65% above $100.

City of Auburn residential permit fees
WorkFee
New one-family, two-family or townhouse construction$200 + $0.40 per sq ft
Addition, including attached garages and carports$150 + $0.40 per sq ft
Interior renovation or remodel (plumbing and electrical excluded)$75 + $0.25 per sq ft
Deck, open porch or ramp$50 + $0.25 per sq ft
Detached structure of 144 sq ft or more / under 144 sq ft$75 + $0.25 per sq ft / $50
Fence$25 + $0.25 per linear ft
Pool$50
Roof / windows / generator / fireplace, stove or chimney$50 each
Solar PV$75
Driveway new or expanded / resurfaced$50 / $25
Miscellaneous (doors, soffit and fascia, retaining walls, foundation repairs)$50
Demolition$50 + $0.02 per sq ft of footprint
Permit renewal (one-time 12-month extension)$50 or 10% of the original permit, whichever is greater

Rather talk it over?

Call 1-855-478-4290 →
City of Auburn commercial permit fees
WorkFee
New commercial building, including additions$500 + $0.50 per sq ft
Interior remodel / exterior renovation$300 + $0.40 per sq ft / $250
Fence$200 + $0.25 per linear ft
Driveway or parking resurfacing$200 + $0.02 per sq ft of parking area
Gasoline pump / gasoline storage tank (install, replace or remove)$100 each / $150 each
Moving a building through or across a street$100 + all city costs
Commercial demolition$50 + $0.02 per sq ft of footprint
HVAC permit, residential / commercial$50 / $100 per unit installed
Plumbing, new single-family house$100 for 1–20 fixtures; $200 for 21–30
Plumbing, new multiple residences (2–10 / 11–20 / 21+ units)$100 / $250 / $500 application fee plus $5 per fixture
Plumbing, new commercial (under $25,000 / to $100,000 / to $500,000 / over)$100 / $250 / $500 / $750 application fee plus $10 per fixture
Plumbing renovations and additions$25 + $5 per fixture single-family; $100 + $5 multiple residences; $100 + $10 commercial
Sewer, storm and water service work$100–$150 per item; water heater $30; backflow assembly $50; sewer tap $200
Sign$50 up to 30 sq ft; $2 per sq ft above
Inspection or re-inspection / missed appointment$50 / $75

Worked examples: a 1,800-square-foot new house is $200 plus 1,800 × $0.40, or $920; a 400-square-foot addition is $310; a 300-square-foot deck is $125; and 150 feet of residential fence is $62.50. Working without a permit costs double the permit fee for a first offense, $300 plus double for a second and $500 plus double for a third. Certificates of occupancy are billed separately (see below).

Trade permits and who may pull them

Auburn licenses its own trades through city boards. The Electrical License Board examines and licenses Master, Limited and Appliance Installer electricians, and posts the 2026 list of each; for the current round, applications had to be filed in person at the board’s October 14, 2026 meeting, with the exam date to be announced. The Plumbing Board licenses Master Plumbers and Drain Layer Plumbers and accepts applications only in person at an advertised regular meeting. The city also keeps a list of backflow testers, and backflow prevention devices have their own application on the forms page.

Electrical inspections are made by agencies the City Council has designated and deputized under Article V of Chapter 125: Commonwealth Electrical Inspection Service (315-224-3404), CNY Electrical Inspection Service (315-633-0027) and The Inspectors, LLC (800-487-0535). Plumbing and HVAC work uses the city’s own Plumbing/HVAC Permit application.

Every building permit needs the contractor’s certificate of workers’ compensation and disability coverage, a CE-200 if the contractor has no coverage, or the city’s self-liability waiver signed by a homeowner doing the work.

Rather not deal with the City of Auburn building department?

Get a free quote →

How to apply for an Auburn building permit

1. Check historic and zoning status

Exterior work in the Historic District needs the review board’s certificate; variances and special use permits go to the boards first.

2. Draw the plot plan

Show setbacks for sheds, decks, fences, pools and additions using the city’s construction requirements.

3. Add plans and insurance

Stamped plans for jobs of $20,000 or more (confirm whether two sets plus a digital set or three sets), and the insurance certificate, CE-200 or homeowner waiver.

4. Submit without payment

Email the package to Code Enforcement, mail it to 24 South Street or leave it in the City Hall drop box; money sent with an application is not accepted.

5. Pay on approval

When the office tells you the permit is approved, pay by check or card and collect the permit.

6. Inspect and certify

Arrange inspections with the office and, where the work triggers one, obtain the certificate of occupancy.

Review, corrections and what causes delay

The office publishes review times by project: 14 business days for additions, detached structures, driveways and solar, and 8 business weeks for new houses and for commercial building work. A Historic District project cannot be permitted until the Certificate of Appropriateness is in hand, and a permit can be extended only once, for 12 months from the original issue date.

Auburn inspections and certificates of occupancy

Construction inspections are arranged through the Code Enforcement Office; electrical installations are inspected by one of the city’s designated agencies. The office posts an inspection checklist with its certificate of occupancy information.

A certificate of occupancy is required for every building with two or more dwelling units, and for every mixed commercial-residential building, whenever title transfers, a mortgage is recorded without a valid certificate, units sit vacant or condemned for six months, the use changes, a building permit is issued, or an existing certificate reaches its five-year expiry. A new single-family house, or one vacant for six months or more, also needs one.

Certificate of occupancy fees
BuildingFee
Residential$50 per unit
Mixed use$100 plus $50 per unit over one
Commercial, 0–25,000 sq ft / to 50,000 sq ft / over 50,000 sq ft$200 / $300 / $400

Want this handled start to finish?

Get a free quote →

New York building code

New York builds on one statewide code, the Uniform Code, outside New York City; the 2025 edition and 2025 Energy Code took effect on 31 December 2025 (the all-electric provisions remain suspended by court order). Cities, towns and villages administer it, and local standards stricter than the code need Code Council approval. The Uniform Code in New York

Auburn’s local administration rules sit in Chapter 125 of the Municipal Code, published on eCode360, which also carries the city’s electrical inspection article.

City of Auburn permit FAQ

Do I need a permit to replace siding in Auburn?

Ask first. The fee web page lists painting, siding, carpeting and floor covering above the sub-floor as work that needs no permit, but the July 2026 permit fee sheet drops siding from that list. Window replacement does need a permit ($50).

How much is a building permit for a new house?

$200 plus $0.40 per square foot, so an 1,800-square-foot house is $920. A certificate of occupancy is a separate $50 per unit.

Can I pay when I submit?

No. Send the application without money; the office notifies you when the permit is approved and then collects the fee.

Do I need a permit for a small shed?

Yes. Detached structures under 144 square feet pay a flat $50, and larger ones $75 plus $0.25 per square foot, up to 784 square feet.

Who inspects electrical work in Auburn?

One of the City Council’s designated agencies: Commonwealth Electrical Inspection Service, CNY Electrical Inspection Service or The Inspectors, LLC.

How do I get an electrician’s or plumber’s license?

Apply in person to the city’s Electrical License Board or Plumbing Board at an advertised meeting; the boards examine applicants and the city publishes the licensed lists each year.

What does a pool need in Auburn?

A $50 permit, a site plan, and a location 10 feet from property lines and 6 feet from the house. Above-ground pools need 48-inch walls with a lockable ladder or a 48-inch fence with a self-latching gate, and in-ground pools must be fenced.

Do I need a permit to pave or widen a driveway?

Yes. A new, expanded or replacement driveway is $50 and resurfacing is $25, with a plot plan; the city’s Driveway / Curb Cut and / or Parking Area Expansion application covers work at the curb.

Does a short-term rental need anything from Code Enforcement?

Yes. The office publishes a separate Application for Short Term Rentals alongside its dwelling unit conversion and reinstatement applications.

How long does review take?

About 14 business days for additions, sheds and garages, driveways and solar, and about 8 business weeks for a new house or commercial building work.

When does a rental building need a certificate of occupancy?

Buildings with two or more units need a current certificate on sale, refinancing without a valid certificate, a six-month vacancy, a change of use, a building permit, or when the existing certificate turns five years old.

Inspections are where schedules slip.

Get a free quote →

Auburn permit search and official resources

Permit and certificate records for Auburn properties are kept by the Code Enforcement Office at Memorial City Hall. Because a multi-unit building needs a valid certificate of occupancy when title transfers or a mortgage is recorded, its certificate status is the first record to check before a sale or refinancing; copies of permit files can also be requested from the city under the Freedom of Information Law.

Simplify City of Auburn permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in New York. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in City of Auburn sooner?