Maine Building Permit Guides

19 building permit guides for Maine jurisdictions.

How building permits work in Maine

County GuideMaine

Androscoggin County Building Permit Guide

Androscoggin County does not issue permits; each town does. Code offices and filing rules for Lewiston, Auburn, Lisbon and Turner.

4 min readOctober 2026
Read Guide
Municipal GuideMaine

Auburn Building Permit Guide

Auburn permits through its SmartGov portal at Auburn Hall, and carries an unusual rule: Lake Auburn supplies drinking water to Auburn and Lewiston, so septic systems in the watershed are inspected on a five-year cycle, with reports filed with the code department.

10 min readSeptember 2026
Read Guide
Municipal GuideMaine

Augusta Building Permit Guide

Augusta is the state capital, and the city does not issue electrical permits: it says those are handled by the State of Maine, while the city's Bureau of Code Enforcement takes the building, plumbing and septic work.

10 min readSeptember 2026
Read Guide
Municipal GuideMaine

Bangor Building Permit Guide

Bangor is the service centre for the whole north and east of Maine, and its Code Enforcement Office at City Hall states its own rules plainly on the application form: full plan sets and energy detail for all new construction, stamped drawings for commercial work, and no permit at all for a small building of 200 square feet or less.

10 min readSeptember 2026
Read Guide
Municipal GuideMaine

Biddeford Building Permit Guide

Biddeford's Code Enforcement Office is seven people, each assigned a specialism and most cross-trained across the others, and its building permit application asks for three copies of a licensed soil evaluator's wastewater form and a site plan drawn to boundary-survey accuracy.

11 min readSeptember 2026
Read Guide
Municipal GuideMaine

Brunswick Building Permit Guide

Brunswick publishes its overlay triggers as precise distances rather than general warnings: a steep slopes permit within 75 feet of a 15 per cent slope in the rural districts, and a shoreland permit measured at 250 feet from a river or wetland and 75 feet from a stream.

10 min readSeptember 2026
Read Guide
County GuideMaine

Cumberland County Building Permit Guide

Cumberland County does not issue permits; its 3 cities and 25 towns do. Offices, portals and fees for Portland, South Portland, Scarborough and Brunswick.

4 min readOctober 2026
Read Guide
Municipal GuideMaine

Gorham Building Permit Guide

Gorham is moving its permits online: applications now go online through SmartGov, with printed applications still taken in person at the Code Division through 31 October 2026, and a driveway entrance permit rides with every new house.

10 min readSeptember 2026
Read Guide
County GuideMaine

Kennebec County Building Permit Guide

Kennebec County does not issue permits; each town does, and the state LUPC covers Unity Township. Offices and rules for Waterville, Winslow and Oakland.

4 min readOctober 2026
Read Guide
Municipal GuideMaine

Lewiston Building Permit Guide

Lewiston runs its permits from the third floor of City Hall without an online portal: applications are downloaded, filled in and emailed, posted or brought to the counter, the fee is quoted once the application is complete, and the department publishes a seven to ten day turnaround for standard permits.

10 min readSeptember 2026
Read Guide
County GuideMaine

Penobscot County Building Permit Guide

Penobscot County towns issue their own permits; the state LUPC covers the Unorganized Territories. Offices and rules for Bangor, Orono, Brewer and Hampden.

4 min readOctober 2026
Read Guide
Municipal GuideMaine

Portland Building Permit Guide

Portland is the only municipality in Maine above 50,000 people, and its Permitting and Inspections Department runs a one-stop counter in City Hall where every application is filed online, with historic preservation review reaching a large share of the peninsula.

10 min readSeptember 2026
Read Guide
Municipal GuideMaine

Saco Building Permit Guide

Saco has a rule worth knowing: after a building permit issues for a new dwelling, a commercial use or any exterior change in the shoreland districts, the code officer writes to the abutting landowners to tell them it has been granted.

10 min readSeptember 2026
Read Guide
Municipal GuideMaine

Sanford Building Permit Guide

Sanford writes its permitting into ordinance rather than practice: applications go in writing to the code enforcement officer on the forms provided, the demolition permit expires 30 days after issue, and an oil or gas burner installer must hold a Maine Fuel Board licence.

10 min readSeptember 2026
Read Guide
Municipal GuideMaine

Scarborough Building Permit Guide

Scarborough takes building permit applications at a single submittals email address, keeps its property files electronically and turns them round within two days of a request, and sits around the largest salt marsh in Maine, which puts shoreland and wetland review at the front of a great many files.

10 min readSeptember 2026
Read Guide
Municipal GuideMaine

South Portland Building Permit Guide

South Portland splits a project into separate permits: the building permit is one of seven, with plumbing, electrical, heating, sprinkler, signs, driveway and mechanical each requiring their own, and the work must have a substantial start within 180 days.

10 min readSeptember 2026
Read Guide
Municipal GuideMaine

Westbrook Building Permit Guide

Westbrook runs a small code office with a clear division of labour: appointments with the code enforcement officer are booked through the office coordinator, who also assigns new property addresses for the state emergency system, and every permit issued is published in a monthly public report.

10 min readSeptember 2026
Read Guide
Municipal GuideMaine

Windham Building Permit Guide

Windham keeps a four-day week that starts at seven in the morning and runs late on Tuesday, and it splits its building records in two: permits since 2015 are on the town's MyGov permit portal, while older files live in the town's mapping system under each property.

10 min readSeptember 2026
Read Guide
County GuideMaine

York County Building Permit Guide

York County does not issue permits; its 29 municipalities do. Offices, fees, impact fees and timelines for Sanford, Biddeford, Saco and York.

4 min readOctober 2026
Read Guide

How building permits work in Maine

These rules apply across Maine. Each local guide above covers what is specific to that city, town, township or county: its building department and contacts, local rules, fees and inspections.

The state code, who enforces it and the state overlays

The adopted code sets the permit line, but in Maine it applies only where the town’s ordinance requires permits, and a town may add its own exemptions. Ordinary repairs generally need no permit; construction, alteration, repair, demolition and any change of occupancy generally do where the town requires permits. Two Maine features sit on top of that line in almost every town. Shoreland zoning is mandatory statewide within 250 feet of most water bodies and wetlands and within 75 feet of a stream, so a shorefront parcel answers a second ordinance before the building permit. And fees and appeals are local: the state code deletes its own fee and appeals provisions, leaving both to the municipality.

Who enforces, and what the state certifies

Maine does not leave the enforcing officer to the municipality’s discretion. A code enforcement officer under Title 30-A must be certified by the state in each area of responsibility — shoreland zoning, land use, internal plumbing, subsurface wastewater and building standards are separate certifications — within 12 months of appointment, with recertification every six years; the certifying body is now the Maine Office of Community Affairs, which took over the programme in the 2025 reorganisation. A plumbing inspector gets no 12-month grace period: they must be certified before taking office, unless the state health department gives temporary written approval for up to 12 months. A municipality may also meet its MUBEC duty through certified third-party inspectors, hired by the owner or the town, who report to the building official before the certificate of occupancy is issued; where a town has chosen no inspection method, the applicant must hire a certified third-party inspector at their own cost.

Shoreland zoning, wastewater and the unorganized territory

Three Maine overlays reach projects that the building code alone would not. Shoreland zoning is required of every municipality with water in it, and its setbacks, clearing limits and expansion rules apply on top of the building code. Subsurface wastewater on an unserved lot needs a licensed site evaluator’s design on the state’s own form (HHE-200), and the local plumbing inspector must issue the disposal permit before work on the system starts. And beyond the towns lie the unorganized and deorganized areas — more than 10.4 million acres of townships and plantations with no local government or no local land use controls — where the Land Use Planning Commission is the zoning and permitting authority and issues the building permit itself.

Contractor rules and trade licences

Maine has no general contractor licence. A builder needs no state credential to take on a house, and the protection sits in contract law instead: under the Home Construction Contracts Act a contract for more than the statutory threshold must be in writing and carry specified terms, including warranty and dispute-resolution provisions. The trades are licensed: electricians hold licences from the state electricians' examining board and plumbers from the plumbers' examining board, both within the Department of Professional and Financial Regulation, and oil and solid fuel technicians hold their own. Site evaluators for subsurface wastewater are licensed separately.

Trade work is permitted separately and done by state-licensed tradespeople, though an owner may do their own plumbing, wiring and heating work in a single-family home they live in, to the same standards. Internal plumbing runs through the local plumbing inspector on the state’s own permit form rather than through the building permit, and electrical permits come from the state Electricians’ Examining Board unless the town runs its own electrical inspection.