Skip to main content
Municipal GuideIndianaNew Albany · Floyd County

New Albany, Indiana Building Permit Guide

To get a building permit in New Albany, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

In New Albany you clear zoning with the City Plan Commission office (Suite 200) and then get the building permit from the Building Department (Suite 206), both at City Hall, 142 East Main Street; permits, payments and inspection requests run through the city’s SmartGov portal.

Authority: New Albany Building DepartmentFiling: SmartGov public portalPhone: 812-948-5371
Building permits
Building Department142 E. Main St, Suite 206
Zoning first
Location permitPlan Commission, 812-948-5327
Fence permit
$354 ft front, 6 ft side and rear
Variance
$160$150 plus $10 sign fee

New Albany splits a project between two City Hall offices at 142 East Main Street. The City Plan Commission staff (Suite 200, 812-948-5327) issue the improvement location permit that confirms zoning, for the city and its Two-Mile Fringe Area; the Building Department (Suite 206, 812-948-5371), headed by Building Commissioner David Kalbaugh, then issues the building permit and inspects. Applications, payments, inspection requests and permit searches run through the city’s SmartGov public portal.

What requires a building permit in New Albany?

The improvement location permit form shows the range of work the city tracks: building something new, adding to an existing building, altering one inside or outside, repairing it, demolishing it or changing how the property is used. The form says plainly that the location permit is not a building permit, and that a building permit must also come from the Building Commission office before construction starts. Fences, signs, subdivisions and work in the historic districts each have their own city application on top of that.

City approvals that apply

  • Improvement location permit for new buildings, additions, interior or exterior alterations, repairs, demolition and changes of use
  • Building permit from the Building Department
  • Fence permit for every new or replacement fence
  • Sign permit for each sign face
  • Certificate of Appropriateness for work in a local historic district

Fence rules

  • Up to 4 feet tall in the required front yard
  • Up to 6 feet tall in side and rear yards
  • No fence that blocks the view of drivers, cyclists or pedestrians on a corner
  • Finished side facing out
  • Call 811 before digging; a fence found on a neighbor’s land must be moved

What the city decides and what the state holds

New Albany sets its own zoning code (Chapter 156 of the city code), its permit fees and its contractor licensing, and its Building Commission oversees construction inside the city. The plan staff also verify the flood zone and FIRM panel on each location permit. The state’s role is the design release on Class 1 buildings, which the city’s building permit does not replace.

New Albany building department: who handles permitting

The Building Department issues building permits and handles code enforcement, grass and weed complaints and the rental registration program; its Building Commission board meets on the first Monday of the month at 4:00 p.m. The Plan Commission office, led by Director and Zoning Officer Scott Wood, runs zoning, subdivisions, historic preservation support and the Board of Zoning Appeals. The 11-member Plan Commission includes two members, appointed by the Floyd County Commissioners, who represent the unincorporated Two-Mile Fringe Area, and the BZA decides variances, special exceptions and conditional uses for the city and the fringe area.

Short on time to read all of this?

Get a free quote →
New Albany permit offices
ItemDetail
Building Department142 E. Main Street, Suite 206, New Albany, IN 47150; 812-948-5371
Building CommissionerDavid Kalbaugh
Code enforcement, grass and weeds812-948-5309
Plan Commission and zoning142 E. Main Street, Suite 200; 812-948-5327; Monday to Friday, 8:00 a.m. to 4:00 p.m.
OnlineSmartGov public portal: apply, pay, request inspections, search permits
HearingsBZA first Tuesday, Plan Commission third Tuesday, 5:30 p.m., Council Chambers, Room 100, City Hall

Unincorporated land around the city that is outside New Albany’s planning jurisdiction is permitted by Floyd County’s Department of Building & Development Services; see the Floyd County guide. The location permit form covers sites in the city or its Two-Mile Fringe Area jurisdiction, and Floyd County’s zoning ordinance leaves New Albany’s planning jurisdiction out of its own, so zoning for a fringe lot runs through the city’s Plan Commission; ask both offices which one issues the building permit for a lot outside the city limits. Only a letter from the Plan Commission staff counts as an official zoning verification, and the office has a form for requesting one.

New Albany permit types

Zoning and land-use applications are PDF forms on the Planning and Zoning page, filed with the Plan Commission office; building permits, contractor licenses and rental registrations are handled through SmartGov, where you can also pay and request inspections.

Residential permits

  • Improvement location permit. Attach a property survey or site plan; staff record the zoning, plat and lot, flood zone and FIRM panel and any earlier zoning action, and mark the application approved, pending Plan Commission or BZA action, or denied.
  • Building permit. Filed with the Building Department after the location permit.
  • Fence permit. $35, cash or check, with a survey or site plan showing where the fence goes.
  • Historic districts. A Certificate of Appropriateness from the Historic Preservation Commission ($10, non-refundable) needs a site plan, street photos and elevations for new construction, or photos and material samples for rehabilitation. Indiana Landmarks’ office at 911 State Street (812-284-4534) provides preservation services alongside the city.
  • Rentals. Rental units must be registered, at $5 per rental address or parcel, on paper at City Hall Suite 212 or online for an added convenience fee.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

For commercial development the Plan Commission posts a site plan application alongside the improvement location permit, and the building permit follows. Signs need a sign permit at $50 per sign face with a dimensioned sign plan; a sign over the public right-of-way needs Board of Works approval and at least 7 feet of clearance, and a sign in a historic district needs a Certificate of Appropriateness. Planned unit developments and subdivisions have their own applications.

Hearing deadlines for the rest of 2026

Every Plan Commission and BZA meeting convenes at 5:30 p.m. in the City Council Chambers, and each has a pre-application meeting about four weeks earlier. On the 2026 schedule, the Plan Commission’s December 15 hearing takes general applications until November 25, 2026; the BZA’s January 5, 2027 hearing has a pre-application meeting on December 7, a special exception deadline the same day and a December 18 deadline for other applications, with newspaper publication on December 26.

What comes before the building permit

  • Zoning relief. Variances and special exceptions are filed with the Plan Commission office; an unfavorable Plan Commission recommendation on a special exception ends it, and the BZA does not hear it.
  • Pre-application meeting. The 2026 hearing schedule sets a pre-application meeting and separate filing deadlines for special exceptions and other applications ahead of each hearing.
  • Sewer. The Wastewater utility at 38 W. 10th Street (812-948-5320) handles collection system locates and inspections.
  • Stormwater. The Stormwater department, 2113 Grant Line Road (812-945-1989), works under a Stormwater Board.
  • State design release. Needed before a Class 1 building goes up.

New Albany permit costs and fees

Building permit fees are set in the fee chapter of the New Albany Code of Ordinances, which the Building Department links from its page as “Ordinance Fees”; the department does not post a separate fee sheet, so ask it at 812-948-5371 for the fee on your job. The Plan Commission prints its fees on each application, and all of them are non-refundable.

Rather talk it over?

Call 1-855-478-4290 →
Fees printed on New Albany planning applications
ItemFee
Fence permit (form effective June 27, 2024)$35, cash or check
Variance (use or development standards)$150 plus $10 sign fee ($160)
Special exception$150 plus $10 sign fee ($160)
Zoning ordinance amendment (text or map)$250 plus $10 for signs ($260)
Residential subdivision$350 plus $10 per lot plus $10 signs; final plat $175 plus $10 per lot
Commercial subdivision$750 plus $10 per lot plus $10 signs; final plat $375 plus $10 per lot
Sign permit$50 per sign face
Certificate of Appropriateness$10
Rental registration$5 per rental address or parcel

Worked example from the subdivision form: a residential preliminary plat for 12 lots costs $350 plus 12 × $10 ($120) plus the $10 sign fee, or $480. SmartGov adds a convenience fee when a rental registration is paid online.

Trade permits and who may pull them

New Albany licenses contractors: the Building Department’s contractor license application and license renewals are handled through SmartGov, so register before you or your subcontractors pull a permit there. Permit applications and inspection requests go through the same portal.

  • Plumbing: the plumbing contractor needs an Indiana plumbing license; ask the Building Department whether the city’s contractor license is also needed for plumbing work.
  • Electrical and HVAC: Indiana issues no license for these trades, so any credential comes from the city; ask the Building Department which class of the city’s contractor license your trade needs before the permit is pulled.
  • Sewer work: connections, locates and inspections on the public collection system are coordinated with the Wastewater utility’s asset manager at 812-948-5320.
  • Homeowners: the city’s pages do not describe a homeowner permit; ask the Building Department before doing your own trade work.

How to apply for a building permit in New Albany

1. Confirm zoning

Email the Plan Commission office for the zoning of the parcel, or request a formal zoning verification letter.

2. Seek relief if needed

File a variance, special exception or other petition by the deadline on the 2026 hearing schedule, after the pre-application meeting.

3. Get the location permit

Submit the improvement location permit with a survey or site plan to Suite 200; add a Certificate of Appropriateness in a historic district.

4. Register as a contractor

Complete the city’s contractor license through SmartGov if you have not already.

5. Apply for the building permit

Apply and pay online in SmartGov, or work with the Building Department in Suite 206.

6. Request inspections

Use the portal’s My Inspections page when each stage is ready.

Rather not deal with the building department?

Get a free quote →

Review, corrections and what causes delay

A location permit that needs Plan Commission or BZA action is marked pending until the board rules, and boards meet once a month with newspaper notice deadlines several weeks earlier. A special exception that draws an unfavorable Plan Commission recommendation stops there. Projects in a historic district wait for the Historic Preservation Commission’s certificate before the building permit can move.

Inspections in New Albany

Inspections are requested through SmartGov’s My Inspections page “when you are ready”, and the portal publishes an inspection schedule and shows results on each application. The Building Department’s inspector carries out the building inspections. By signing the location permit, the owner also consents to inspections by the Plan Commission, the BZA and their staff during and after construction.

Rental property is inspected under the separate rental registration and inspection program (City Hall Suite 212, 812-948-5333). Owners register every rental unit each year; after registration and inspection the city issues an occupancy permit that stays in force unless it is suspended or revoked. The inspector looks at every room and the exterior for light, ventilation, heat, sanitation and fire safety. Owner-occupied single-family homes, group homes, federally owned or housing-authority units, contract-for-sale buyers, college dormitories and hotels are exempt.

The program’s checklist, request form and landlord and tenant brochures are posted on the city’s site. Complaints about existing buildings go to code enforcement at 812-948-5309 or on the Building Department’s complaint form.

Indiana building code in New Albany

FEMA’s Community Status Book lists the City of New Albany (community 180062) as participating in the National Flood Insurance Program, with maps effective April 16, 2014. Beyond the floodplain, the city’s Flood Control department maintains 3.5 miles of Ohio River flood wall, made up of earth levee and concrete wall, with six pumping plants.

Want this handled start to finish?

Get a free quote →

Before construction starts on a Class 1 structure — one used by the public, by three or more tenants, or by anyone working as another’s employee — Indiana requires a state Construction Design Release, unless the work is exempt under 675 IAC 12-6-4. One- and two-family dwellings and qualifying townhouses are Class 2 and are permitted locally where an ordinance requires it. Indiana enforces the 2014 Indiana Building Code and the 2020 Indiana Residential Code. Class 1 and Class 2 in Indiana

New Albany permit search and official resources

Anyone can search New Albany permits and licenses in SmartGov by permit or license number, address or name, and the portal also offers an advanced search and reports. For files held by the Plan Commission office, use its public records request form.

The Planning and Zoning page also carries the variance, special exception, zone change, subdivision, site plan, sign, Certificate of Appropriateness and zoning verification forms named in this guide.

Inspections are where schedules slip.

Get a free quote →

New Albany building permit FAQs

Do I need a permit for a fence in New Albany?

Yes. A fence permit costs $35; fences may be 4 feet tall in the front yard and 6 feet in side and rear yards.

Is the improvement location permit the same as a building permit?

No. It confirms zoning; you still need a building permit from the Building Department before you start.

How do I apply and pay online?

Through the city’s SmartGov public portal, where you can also request inspections and track your application.

How much is a building permit?

The amount is set in the city code’s fee chapter; ask the Building Department at 812-948-5371 for your project’s fee.

Does a contractor need a city license?

The city licenses contractors; the application and renewals are handled in SmartGov.

What does a variance cost and when is it heard?

$160 including the sign fee; the BZA meets on the first Tuesday at 5:30 p.m. in Room 100 of City Hall.

How do I get a sign approved?

File the Plan Commission’s sign permit application with a dimensioned sign plan and $50 for each sign face; a sign over the sidewalk or street needs Board of Works approval and at least 7 feet of clearance.

Do I have to register a rental house?

Yes, every year, at $5 per parcel; an owner-occupied single-family home is exempt, and the city issues an occupancy permit once registration and inspection are complete.

I’m in a historic district. What else do I need?

A Certificate of Appropriateness from the Historic Preservation Commission, which costs $10.

Simplify New Albany permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Indiana. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in New Albany sooner?

Let Alliance prepare, file, and track your New Albany permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about New Albany permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.