Moultrie County’s Department of Planning and Zoning, on the first floor of the courthouse at 10 South Main Street, Sullivan (217-728-7922), regulates construction in the unincorporated county through zoning, flood hazard and subdivision rules, and by agreement also handles building permits for the Village of Bethany. A residential permit costs a $50 base fee plus $50 for each inspection on the 2024 fee schedule, commercial and industrial permits $0.12 per square foot, and fees double if work starts before the permit. Sullivan, Arthur, Lovington and the other incorporated towns have their own ordinances.
What requires a building permit in unincorporated Moultrie County?
The county requires a permit before most construction starts, and inspections follow during the work. Its zoning and FAQ pages spell out the list:
Permit required
- New homes and other dwellings
- Additions, including decks and porches
- Garages, gazebos and other accessory structures, on a permanent foundation or not
- Sheds and buildings on skids of 151 square feet or more
- In-ground swimming pools
- Commercial and industrial buildings
- Solar installations and demolitions (demolition permits are free)
No permit
- Roof replacements
- Siding
- Replacement windows
- Interior remodels without major structural changes
- Sheds under 151 square feet
Certain agricultural uses are exempt from local zoning under state law, except for setbacks; the county suggests checking with the department and with your own legal counsel, and it publishes an affidavit of agricultural exemption and a separate farm building permit form. The county does not enforce private subdivision covenants or deed restrictions, and it does not locate property lines.
What Moultrie County decides and what the state holds
The County Board adopted zoning and land subdivision regulations in 1977 and sets the permit fees. For construction, the department says the county adopted the 2018 International Residential Code and the 2024 International Building Code and expects contractors working in the county to follow them. Septic and water matters are environmental health work for the Moultrie County Health Department; plumbing follows the state plumbing code with plumbers licensed by the Illinois Department of Public Health, and roofing contractors are licensed by the state.
Moultrie County building department: who handles permitting
The Department of Planning and Zoning, led by Planning and Zoning Director Kristi Hart, issues building, solar, farm building and demolition permits, handles zoning, flood hazard and subdivision matters, and answers nuisance complaints for unincorporated land. Two county building inspectors carry out the permit inspections, divided by township. Under an agreement with the Village of Bethany, the department also oversees Bethany’s planning and zoning, including building permits. The county stopped handling planning and zoning for the Village of Gays on June 10, 2026; Gays residents now go to the village clerk.
Short on time to read all of this?
Get a free quote →| Office | Contact |
|---|---|
| Planning and Zoning | Courthouse, 10 South Main Street, Suite 1, Sullivan, IL 61951; 217-728-7922; weekdays 8:30 a.m. to 4:30 p.m. |
| Building inspector: Dora, Lovington, Marrowbone, Sullivan, East Nelson and Whitley townships | Office 217-728-8456, weekdays 8:30 a.m. to 4:30 p.m. |
| Building inspector: Lowe and Jonathan Creek townships | Separate inspector; number on the county’s Building Inspector page |
| Health Department (septic, water) | 2 W. Adams, Sullivan; 217-728-4114; weekdays 8:30 a.m. to 4:30 p.m., closed noon to 1 p.m. |
| Highway Department (county highway entrances, utilities) | 10 S. Main Street, Suite 3, Sullivan |
| Municipality | Who handles building permits |
|---|---|
| Sullivan (city, pop. 4,310) | City of Sullivan, 304 South Hamilton Street, 217-728-4383: residential and commercial building permit and electric wiring permit applications online |
| Bethany (village, 1,200) | Moultrie County Planning and Zoning, by agreement; the village base permit fee is paid separately from county inspection fees |
| Gays (village, 212) | The village clerk (county planning and zoning ended June 10, 2026) |
| Arthur (village, 809 here; 1,452 in Douglas County) | The village, which posts its own building permit application |
| Lovington (1,010), Dalton City (432), Allenville (129) (villages) | Own ordinances; ask the village hall |
| Unincorporated land | Moultrie County Planning and Zoning |
Moultrie County permit types
Forms are on the department’s printable forms page. Completed forms can be uploaded through the county’s online submission form, brought to the office or mailed to Moultrie County Planning and Zoning, 10 South Main Street, Suite 1, Sullivan, IL 61951; payment is accepted in cash, check, money order or by card in the office and online.
Residential permits
- Residential building permit. For new homes, additions, decks, porches, garages and accessory buildings; a site plan with square footage is required for the application to be processed.
- Solar permit. $50 on the fee schedule.
- Farm building permit and affidavit of agricultural exemption for qualifying farm structures.
- Demolition permit. Free; available at the office or online.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial and industrial buildings use the commercial/industrial building permit, with a base fee of $0.12 per square foot of building, plus the same $50 inspection permits. Wind energy conversion systems and solar farms follow the county’s wind and solar ordinances, and uses not allowed in a district need a special use or rezoning.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning district. Check the district on the county GIS map (turn on the zoning layer; parcels marked “INC” are incorporated) and the setback chart, or call the department.
- Zoning relief. Variances, special uses and rezonings each cost $300 for the hearing and go to the five-member Zoning Board of Appeals, usually on the first Friday of the month and often at the site, with published notice at least 15 days ahead; the County Board makes the final decision.
- Subdivision. Splitting a tract outside a town may trigger the 1977 subdivision regulations; preliminary plans get a public hearing before the Regional Planning Commission and final County Board approval, and plats must be prepared by a licensed surveyor.
- Floodplain. Building in a mapped flood hazard area needs a joint application with the Illinois Department of Natural Resources and the Army Corps of Engineers, and may need a flood elevation certificate from a registered engineer or architect.
- Driveways on county highways. A right of entry permit from the Highway Department covers entrances and tile crossings; on township roads, ask the township road commissioner.
Moultrie County building permit fees
Fees are from the Planning and Zoning “Building Permit & Associated Fees” schedule, updated 2024. All payments are final, and the inspection permits must be completed in the order listed, each one passed before the next inspection starts.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Base permit fee, residential | $50 |
| Base permit fee, commercial or industrial | $0.12 per square foot |
| Footing inspection (before concrete) / foundation inspection / structure inspection | $50 each |
| Electrical rough-in / electrical final | $50 each |
| Plumbing rough-in / plumbing final | $50 each |
| Slab foundation with plumbing / finished basement | $50 each |
| In-ground pool electrical / plumbing | $50 each |
| Solar | $50 |
| Zoning (rezoning), variance or special use hearing | $300 each |
| Demolition permit | No charge |
| Permit renewal after 12 months | $30 residential, $50 commercial |
| Construction started without a permit | All fees double |
Worked example. A detached garage with footing, structure, electrical rough-in and electrical final inspections marked on its permit costs the $50 base fee plus 4 × $50, or $250; the same garage started before the permit was issued would pay $500. A 6,000-square-foot commercial building pays a base fee of 6,000 × $0.12 = $720 before its inspection permits.
Trade permits and who may pull them
The county’s pages show no separate trade licenses; electrical and plumbing work in unincorporated areas is covered by the inspection permits on the county fee schedule (electrical rough-in and final, plumbing rough-in and final, slab and pool items), which the inspector checks in sequence. The department’s pages describe no county contractor registration. Plumbing must meet the state plumbing code, under which plumbers are licensed by the Illinois Department of Public Health, and roofing contractors need a state license, although a re-roof needs no county permit. Inside Sullivan, electrical work uses the city’s own electric wiring permit application.
How to apply for a Moultrie County building permit
Use the GIS zoning layer or call 217-728-7922; parcels marked “INC” belong to a town.
Look up the district and setback chart, and seek a variance or special use first if needed.
Show the building’s location and square footage; applications without one are not processed.
Residential, commercial/industrial, solar, farm building or demolition permit.
Upload, mail or bring the form, and pay by cash, check, money order or card, online or in the office.
Give the inspector for your township at least 48 hours’ notice, in the order on the fee schedule.
Rather not deal with the Moultrie County building department?
Get a free quote →Review, corrections and what causes delay
A missing site plan with square footage stops processing. Zoning hearings run on a monthly calendar with at least 15 days’ published notice, and the County Board decides only after the Zoning Board of Appeals recommends, so file any variance or special use well before you want to build. If no construction starts within 12 months the permit must be renewed. In Bethany, the village’s base permit fee has to be paid separately from the county inspection fees, and village applications use the Bethany form on the county site.
Inspections in Moultrie County
The county building inspector does only permit-based inspections, and the inspections each permit needs are marked on the fee schedule when the permit is issued. It is the homeowner’s or contractor’s job to call the inspector when the work is ready, giving at least 48 hours’ notice. Which inspector to call depends on the township: one covers Dora, Lovington, Marrowbone, Sullivan, East Nelson and Whitley townships (office 217-728-8456, weekdays 8:30 a.m. to 4:30 p.m.), and another covers Lowe and Jonathan Creek townships.
The usual sequence is footing (before concrete is poured), foundation, structure, then electrical and plumbing rough-ins and finals, with extra steps for slab foundations with plumbing, finished basements and in-ground pools. Each step must pass before the next one starts. Violations are handled first by education, then by a violation notice and order of compliance, and finally by an ordinance violation suit filed by the State’s Attorney.
Building codes and flood rules in Moultrie County
The Planning and Zoning Department states that the county adopted the 2018 International Residential Code and the 2024 International Building Code for construction in its jurisdiction. Federal flood hazard rules are built into the county’s zoning and subdivision regulations and its ordinance regulating development in special flood hazard areas; where it is unclear whether a site is in the 100-year flood area, the applicant must provide certified elevation information. FEMA’s Community Status Book lists Moultrie County (community 170998, unincorporated areas) as a participating community, with a flood insurance rate map first issued August 5, 1985 and a current map dated July 18, 2011.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Moultrie County building permit FAQs
How much is a building permit in Moultrie County?
$50 base for residential work plus $50 for each inspection marked on the permit; commercial and industrial permits are $0.12 per square foot plus inspections.
Do I need a permit for a new roof, siding or windows?
No. The county does not require permits for roof replacements, siding, windows or interior remodels without major structural changes.
Do I need a permit for a shed?
Yes if it is 151 square feet or more, even on skids or without a permanent foundation.
How long is a permit good for?
12 months from issue; renewal costs $30 for residential and $50 for commercial permits.
What happens if I start building without a permit?
The permit and inspection fees double.
Does the county issue permits in Sullivan or Arthur?
No. Each incorporated town has its own ordinances; the county does handle Bethany by agreement, but no longer Gays.
Who do I call for an inspection?
The building inspector for your township, with at least 48 hours’ notice; the county lists both inspectors on its Building Inspector page.
Moultrie County permit records and official resources
Permit records for unincorporated land and Bethany are kept by the Planning and Zoning office; Zoning Board of Appeals, Regional Planning Commission and Planning and Zoning Committee agendas and minutes are listed on the department’s pages. Other records can be requested with the county’s FOIA request form.
Inspections are where schedules slip.
Get a free quote →- Moultrie County Planning and Zoning
- Building permit and associated fees (2024)
- Zoning and construction permits
- Planning and Zoning FAQs
- Printable permit forms and online submission
- Building inspectors by township
- Village of Bethany permits
- Village of Gays notice
- Zoning Board of Appeals
- Subdivision regulations
- Federal flood hazard regulations
- Planning and Zoning Committee
- Moultrie County Health Department
- County highway permits
- City of Sullivan permit forms
- FEMA Community Status Book, Illinois
Simplify Moultrie County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Moultrie County sooner?
Let Alliance prepare, file, and track your Moultrie County permits while your crew stays on the job.
More Illinois permitting guides
Piatt County
Read guide →Coles County
Read guide →Macon County
Read guide →Mount Prospect Building Permit Guide
Read guide →Mount Vernon Building Permit Guide
Read guide →Mundelein Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Moultrie County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.