For land outside Monticello and the villages, building permits come from the Piatt County Zoning Office, Room 105 of the courthouse at 101 W. Washington, Monticello (217-762-3111). File the full Application for Building Permit with a site plan, building plans and construction specifications. New construction is charged $12 per 100 square feet and accessory buildings up to 2,000 square feet a flat $50. If the project adds a well, a private sewage system or a change of use, the DeWitt-Piatt Bi-County Health Department must approve it before the county issues the permit.
What requires a building permit in Piatt County?
The county’s zoning page describes one building permit, priced on new construction, with a separate rate for accessory buildings. Health approvals are tied to it, so a single rural project can need two offices.
County building permit
- New construction, charged by the square foot (a new house or added floor area)
- Accessory buildings, at a flat or capped rate
- Every permit must meet the minimum yards in Article VII of the Piatt County Zoning Ordinance
Health department permit
- A new private sewage system or a replaced septic tank
- Adding or removing a major component: an aeration unit, seepage bed, seepage pit, chamber field or waste stabilization pond
- Enlarging the absorption field by 25% or more, or replacing 25% or more of it
- A new private water well, a closed-loop geothermal well field, or sealing an old well
The two programs meet at the building permit. The county and the health department have a joint policy: no building permit is issued until the health department has approved the plans for handling water. A project that adds a new water source, changes the current use of a building or involves a private sewage system therefore starts at the health department, and the signed Health Department Certification of Approval form goes to the Zoning Office with the building application.
What Piatt County decides and what the state holds
The county sets its own zoning ordinance, yard rules, building permit fees and permit lifetime. The health department sets the local sewage and water fees and inspects private systems, but the rules it applies are state ones: the application holds the installer responsible for following the Illinois Private Sewage Disposal Licensing Act and Code, and the maintenance schedule printed on it comes from a 2014 Illinois Department of Public Health amendment to that code. Plumbing inside the building follows the Illinois Plumbing Code under a state-licensed plumber, and roofing contractors hold a state license.
Piatt County building department: who handles permitting
Building permits are issued by the Piatt County Zoning Office, run by Zoning Officer Keri Nusbaum. The zoning page also carries the county’s GIS mapping service, and the county has a Board of Appeals, a Plat Committee and a Mapping Committee. Septic and well permits come from the DeWitt-Piatt Bi-County Health Department, which serves both counties from an office in each.
Short on time to read all of this?
Get a free quote →| Office | Contact |
|---|---|
| Piatt County Zoning Office (building permits) | Piatt County Courthouse, Room 105, 101 W. Washington, Monticello, IL 61856; 217-762-3111; fax 217-762-7563; zoning@piattcounty.org |
| DeWitt-Piatt Bi-County Health Department, Piatt County office (septic, wells) | 1020 S. Market St., Monticello, IL 61856; 217-762-7911; fax 217-762-3422; Monday to Friday, 8 a.m. to 4 p.m. |
| DeWitt-Piatt Bi-County Health Department, DeWitt County office | 5924 Revere Road, Clinton, IL 61727; 217-935-3427 |
Cities and villages in Piatt County
The Census Bureau’s 2025 estimate puts Piatt County at 16,791 residents, 5,237 of them on unincorporated land. County building permits cover that unincorporated area; the city of Monticello and the villages are separate local governments, so a parcel inside one of them goes to that city or village hall instead.
| Place | Residents |
|---|---|
| Monticello (city, county seat) | 6,080 |
| Bement (village) | 1,462 |
| Cerro Gordo (village) | 1,312 |
| Mansfield (village) | 921 |
| Atwood (village, Piatt County part) | 579 |
| Hammond (village) | 499 |
| De Land (village) | 447 |
| Cisco (village) | 254 |
| Ivesdale (village; no residents counted on the Piatt side) | 0 |
The county GIS can find a parcel by street address, PIN or intersection, which shows where it sits; the advanced GIS features need a subscription of $40 a year through the county’s Interactive Map Subscription Agreement.
Piatt County permit types
The Zoning Office uses one building permit application for every project, with three forms: the Application for Building Permit, a site plan and a construction specifications sheet. Applicants may draw their own site plan, but must print the county’s site plan form, sign it and attach it to the drawing.
Not sure this scope needs a permit?
Get a free quote →Residential permits
- New houses and other new construction. Priced at $12 per 100 square feet of new construction, with building plans and construction specifications.
- Garages, sheds and other accessory buildings. A flat $50 up to 2,000 square feet; larger ones are charged up to a maximum of $225.
- Septic systems. A health department permit for a new system, a full replacement or a modification, with a soil report by a soil scientist and a plot layout.
- Wells. A health department water well application, including closed-loop geothermal wells, and a separate application to seal an abandoned well.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
The county posts no separate commercial building track: non-residential buildings use the same application, site plan, plans and specifications. The health department’s sewage application does treat them differently. A non-residential septic tank is sized at 1½ times the daily flow rate with a 750-gallon minimum, aerobic treatment units are not recommended, and non-residential systems must be evaluated every three years instead of every five.
For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Health department clearance. For a new well, septic system or change of use, the health department needs a completed Private Sewage System Application, a completed Private Water Well Application, a layout drawing showing the well and septic locations (and any geothermal field) and approximate setbacks from property lines and utilities, before it reviews the project.
- Soil report. Every sewage application needs one, but it is not required before the health department clears the building permit. If no report is filed and the soil later proves unsuitable for a subsurface field, the owner accepts that alternative technology will be needed, which may bring in further approvals from the Illinois Department of Public Health or the Illinois Environmental Protection Agency.
- Yard rules. Check the minimum yards in Article VII of the zoning ordinance when drawing the site plan.
- Flood maps. Unincorporated Piatt County has FEMA flood maps (see the code section below); check the parcel before siting a building.
Piatt County permit fees
Building permit fees are set by the county and printed on the zoning page; septic and well fees come from the health department’s Piatt County fee schedule, effective October 1, 2026.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Building permit, new construction | $12 per 100 square feet |
| Accessory building up to 2,000 sq ft | $50 flat |
| Accessory building over 2,000 sq ft | Up to a maximum of $225 |
| GIS advanced features subscription | $40 a year |
| Septic application, new or complete replacement (licensed contractor or homeowner installation) | $200 |
| Modification of an existing septic system (under 50% modified) | $75 |
| Private water well application | $100 |
| Closed-loop geothermal well system | $100 for the first 10 holes, then $10 a hole |
| Well sealing application | $50 (none when the old well is sealed at the site of a new well) |
| Water screening for nitrates, coliform and E. coli | $20 |
| Initial sampling of a new well (IDPH) | No charge |
The repair fee has a small wording difference between the department’s documents: its septic FAQ gives $75 for a repair of 50% or less of the existing system, while the fee schedule effective October 1, 2026 says under 50% modified. A repair at exactly half the system is the one case where they differ, so ask the department before paying.
Worked example. A new 1,800-square-foot house in the unincorporated county is 18 units of 100 square feet, so the county building permit is 18 × $12 = $216. If the house needs a new well and a new septic system, add the $100 well application and the $200 septic application, for $516 in permit fees before the soil report and the installer’s work.
Trade permits and who may pull them in Piatt County
The county zoning page describes a single building permit and lists no separate county electrical, plumbing or mechanical permit, and no county contractor license or registration. Plumbing inside the building follows the Illinois Plumbing Code and must be done by a state-licensed plumber, and roofers carry a state license.
Septic work has its own rule. A homeowner may install the system only if he or she owns and occupies the single-family house it serves; all other private sewage work must be done by a licensed installation contractor, whose name and license number go on the application, and the form also asks for the septic tank’s manufacturer or dealer and its Illinois number. Both the owner and the installer sign the application and the maintenance agreement attached to it. Well sealing by a licensed contractor carries a one-time annual charge, applied to the contractor’s first well sealing application.
Rather not deal with the Piatt County building department?
Get a free quote →How to apply for a building permit in Piatt County
Look the address or PIN up on the county GIS; city and village parcels go to their own hall.
For a new well, septic system or change of use, file the sewage and well applications and a layout drawing with setbacks.
Obtain the Health Department Certification of Approval to submit with the building application.
Fill in the entire Application for Building Permit, the site plan and the construction specifications sheet.
Bring or send the package, with building plans, to Room 105 of the courthouse and pay the fee.
Construction must begin within six months of issue; the permit is valid for two years.
Review, corrections and what causes delay
The health step is where the published rules can add time. The department does not review incomplete sewage applications; it mails them back to the owner’s current mailing address. Once a complete application is in, a sanitarian should contact the applicant within 5 working days. Changing the design afterwards may mean resubmitting the application, although the resubmission is fee exempt. On the county side, the Zoning Office asks for the entire application to be completed, so submit every form, including a signed site plan, and check the Article VII yard requirements before drawing it.
Inspections in Piatt County
The county zoning page sets the permit’s timing rather than an inspection schedule: work must start within six months and the permit lasts two years. Ask the Zoning Office at permit issue what it will look at and when.
Septic systems are inspected by the health department. A sanitarian must see the system before it is backfilled, and the department needs at least 48 hours’ notice by phone before work starts (text messages are no longer accepted). The department may refuse approval if any part of the system has been covered or is deficient, and it must be told at once of any change from the approved design.
Want this handled start to finish?
Get a free quote →The obligations continue after the final inspection. Residential systems must be evaluated within three years of installation and every five years after that, non-residential systems within three years and then every three years, and aerobic treatment units every six months with a chlorinator or annually otherwise. The homeowner, a private sewage installation contractor, a licensed environmental health practitioner, an IDPH representative or an Illinois professional engineer may do the evaluation, using the department’s Site Visit Evaluation Form. New wells get an initial water test through IDPH; sample bottles are available at either health department office.
Codes and flood maps in Piatt County
The county’s zoning page states its permit rules through the Piatt County Zoning Ordinance and does not name a building code edition; ask the Zoning Office which construction standards it applies to your plans. Private sewage systems follow the Illinois Private Sewage Disposal Code.
FEMA’s Community Status Book lists unincorporated Piatt County (community 170542) as a participating community in the National Flood Insurance Program, with its first flood insurance rate map dated September 1, 1986 and a current map dated June 16, 2011.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Piatt County building permit FAQs
How much is a building permit in Piatt County?
$12 per 100 square feet of new construction; accessory buildings up to 2,000 square feet are a flat $50.
How much does a large garage or shop building cost to permit?
An accessory building over 2,000 square feet is charged up to a maximum of $225.
How long is a Piatt County building permit good for?
Two years, but construction must begin within six months of the issue date.
Do I need the health department before a building permit?
Yes if the project involves a new water source, a change of use or a private sewage system; the county will not issue the permit without the health department’s approval.
How much is a septic permit?
$200 for a new or completely replaced system and $75 for a smaller modification, under the DeWitt-Piatt fee schedule effective October 1, 2026.
Can I install my own septic system?
Only if you own and occupy the single-family house it serves; otherwise a licensed contractor must do the work.
Inspections are where schedules slip.
Get a free quote →Does the county issue permits in Monticello?
No. County permits cover unincorporated land; parcels inside Monticello or a village go to that city or village.
Piatt County permit records and official resources
For a copy of a county building permit, contact the Zoning Office at 217-762-3111 or zoning@piattcounty.org. For septic and well records, the health department lists records requests as fee exempt on its fee schedule and has its own FOIA page.
- Piatt County Zoning Office: building permits, forms and fees
- DeWitt-Piatt Bi-County Health Department: septic systems
- Septic permitting and inspection FAQs
- Private sewage system permit application
- Health department Piatt County fee schedule (effective October 1, 2026)
- Well and water testing
- FEMA Community Status Book, Illinois
Simplify Piatt County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Piatt County sooner?
Let Alliance prepare, file, and track your Piatt County permits while your crew stays on the job.
More Illinois permitting guides
Champaign County
Read guide →De Witt County
Read guide →Macon County
Read guide →Pike County Building Permit Guide
Read guide →Pingree Grove Building Permit Guide
Read guide →Plainfield Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Piatt County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.