Pike County, Illinois Building Permit Guide

To get a building permit in Pike County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Pike County’s Zoning Administrator in Pittsfield issues building permits for land outside locally zoned towns, priced by house size from $50 to $200, with farm buildings free.

Authority: Pike County Zoning AdministratorOffice: 121 E. Washington St., PittsfieldPhone: 217-285-4013
New house permit
$50 to $200By square footage
Farm buildings
No feeResidences are not farm buildings
Permit life
180 daysVoid if work has not begun
No permit started?
Double fee$100 penalty for farm buildings

Outside locally zoned cities and villages, Pike County requires a building permit from the Zoning Administrator before any permanent building is erected, structurally altered or moved. The office is at 121 E. Washington Street, Pittsfield (217-285-4013). A new single-family house costs $50 to $200 depending on its size, agricultural buildings pay nothing, and a permit is void if work has not begun within 180 days. Homes on a septic system or geothermal unit need Pike County Health Department approval before the permit is issued.

What requires a permit in unincorporated Pike County?

The Pike County Zoning Ordinance (the version dated September 27, 2021) says no permanent building or structure may be erected, reconstructed, structurally altered or relocated, and no work started on it, until the Zoning Administrator issues a building permit. A significant change in the use of land or buildings also needs the Administrator’s approval. The permit application covers:

Permit needed

  • Single-family homes, site-built or modular, and multi-family buildings
  • Mobile homes
  • Commercial, industrial, institutional and public buildings
  • Farm buildings and hunting cabins (no fee for agricultural use)
  • Garages, carports, covered patios, porches and storage sheds
  • Decks, breezeways, basements, fences, pools, hot tubs, antennas and towers
  • Grain bins
  • Room additions, moving a building and converting a use

No permit under the ordinance

  • Routine maintenance or repair, including re-roofing
  • Alterations to an existing building with a replacement value of $700 or less
  • A service connection to a municipally owned and operated utility

One permit for a main building also covers accessory buildings built at the same time on the same lot. Fences in a required front yard in a residential, business or industrial district need a permit of their own.

What the county decides and what the state holds

The county board adopts the zoning ordinance, its districts (agricultural, single-family and two-family residential, business, highway business, industrial, flood plain and rural development) and the fee schedule. The permit form warns that the state may require additional permits and licensed contractors, lists the state plumbing inspector and the state livestock waste program, and requires accessibility compliance for commercial, industrial, institutional and public uses. Plumbers and roofers hold state licenses, and plumbing follows the state plumbing code.

Pike County building department: who handles permitting

The Zoning Administrator, Greg Wyatt, is appointed by the county board and enforces the zoning ordinance; the ordinance treats the “Building Official” of the old 1974 building permit ordinance as the same office. The office issues building permits, inspects completed work and issues the zoning compliance and use certificate.

Short on time to read all of this?

Get a free quote →
Pike County offices for building projects
OfficeContact
Zoning Administrator (building permits, zoning)121 E. Washington Street, Pittsfield, IL 62363; 217-285-4013
Pike County Health Department, Environmental Health (septic, wells, geothermal)606 W. Adams Street, Pittsfield; 217-285-4407; Monday to Friday 8:30 a.m. to 5 p.m., closed noon to 1 p.m.
Highway Department (county highways)Building #4, 39643 260th Avenue, Pittsfield; P.O. Box 514; 217-285-4364; Monday to Friday 7 a.m. to 3:30 p.m.; County Engineer Chris R. Johnson, P.E.

Cities and villages

The ordinance applies to all land and water in Pike County except locally zoned incorporated cities, villages and towns. Pike County has 17 municipalities: Pittsfield (population 4,041), Barry (1,247), Griggsville (1,047) and Pleasant Hill (895) are the largest, followed by Hull, New Canton, Perry, Nebo, Milton, Kinderhook, Baylis, New Salem, Pearl, Detroit, El Dara, Florence and Valley City, each under 400 people. For a lot inside one of them, ask the city or village hall whether it has its own zoning and permits; if it does not, ask the Zoning Administrator whether the county ordinance reaches the lot.

Pike County permit types

Pike County uses one building permit application for every project, marked as pre-construction or post-construction. It sorts work into four groups: principal buildings, accessory buildings, incidental structures and remodeling, plus use conversions such as agricultural to residential.

Residential permits

  • Houses and additions: give the estimated cost, lot size, building dimensions, stories including basement, rooms, bathrooms, whether a wood furnace is used and the height from roof peak to ground.
  • Garages, sheds and outbuildings: the same form, with eave height for outbuildings.
  • Decks, pools, hot tubs and fences: listed as incidental structures on the form.
  • Plumbing note: unless the form says otherwise, the structure is permitted with no plumbing, sinks or drains.
  • Septic or geothermal: if the building connects to an onsite waste disposal system or a geothermal unit, attach the Health Department’s signed approval.

Commercial permits

Commercial, industrial, institutional and public uses are marked on the same form and must meet accessibility requirements. Conditional uses need a separate application filed in triplicate, with the owner, architect, engineer and contractor, a description of the site and its zoning district, and, when the Administrator asks, a plat of survey by a qualified person. Where municipal sewer or water is not available, the sewage and water supply plans must be approved by an engineer. Wind energy systems and commercial solar facilities follow the amendment the county posts with its ordinance, which the Zoning Board of Appeals heard on May 15, 2023.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Health approval: septic and geothermal approval from the Health Department, signed before the building permit is issued.
  • Plot plan: every application needs a plot plan, drawn as close to scale as possible, showing the road, lot dimensions, the new building, wells, cisterns, the sewage system, driveway entrance, geothermal lines, all setbacks, the names of abutting owners and a north arrow.
  • Floodplain: the application asks whether the property is in a floodplain; the ordinance keeps Resolutions I and II of March 15, 1974 in effect for all areas in the Flood Plain District.
  • Zoning relief: variances, conditional uses and rezonings go to the Zoning Board of Appeals after notice by certified mail, at least 15 days ahead, to owners within 200 feet in residential areas or within one mile in agricultural areas.

Building in a floodplain

Appendix C of the zoning ordinance is the county’s flood damage prevention ordinance, and the Zoning Administrator is its responsible official. The office processes floodplain development permits, checks that work in a floodway meets the ordinance’s damage-prevention rules, keeps a record of the as-built elevation of each new lowest floor or a floodproofing certificate, inspects development, makes substantial-damage determinations and notifies the state before a watercourse is altered. Base flood elevations come from FEMA’s flood study for the Illinois and Mississippi rivers, Bay Creek, Hardy Creek, Spring Creek and the county’s diversion ditches; where a mapped A zone has no elevation data, the applicant pays for an engineering study. Construction on any stream draining 640 acres or more in an urban area, or in the floodway of a stream draining 6,400 acres or more in a rural area, also needs a permit from the Illinois Department of Natural Resources, Office of Water Resources.

Pike County permit fees

The Zoning Administration fee table is printed on the permit application and posted on the zoning page. Checks are payable to Pike County Zoning. Agricultural buildings and structures pay no fee, but that exemption does not cover residences or penalties.

Rather talk it over?

Call 1-855-478-4290 →
Pike County zoning administration permit fees
ItemFee
Single-family dwelling or addition, under 1,500 sq ft$50
1,501 to 2,000 sq ft$100
2,001 to 2,500 sq ft$150
More than 2,500 sq ft$200
Detached building$0.05 per sq ft
Structures (not buildings) accessory to a house; business or advertising signs$50 each
All other projects$2.50 per $1,000 up to $500,000 ($50 minimum)
$500,001 to $5,000,000$1,250 plus $0.50 per added $1,000
Over $5,000,000$3,450 plus $0.10 per added $1,000
Variation, text amendment, non-conforming use, conditional use$350 each
Zoning map amendment / residential planned unit development$500 / $750
Appeal of an administrative decisionNo fee
Starting construction without a permitTwice the regular fee; $100 for agricultural buildings

Worked examples: a 1,800-square-foot house falls in the 1,501 to 2,000 band and costs $100. A 30-by-40-foot detached garage (1,200 sq ft) costs 1,200 × $0.05 = $60. A $200,000 commercial building costs 200 × $2.50 = $500. Applicants also pay newspaper notice costs for any hearing, and parks or recreation areas owned by a public body or non-profit pay $150 regardless of size. Under the ordinance itself, anyone convicted of violating it forfeits $10 to $200 for each offense, and every day a violation continues counts as a separate offense. The zoning web page prints the top house band as “greater than 1500 square feet”; the fee table on the application reads more than 2,500 square feet.

Trade permits and who may pull them

Pike County does not issue separate electrical, plumbing or mechanical permits, and its pages show no county contractor license or registration. The building application asks for the general contractor’s name, address, phone and email, and the owner or applicant signs it.

  • Plumbing: the form lists the state plumbing inspector (618-656-6680), and a permitted structure is assumed to have no plumbing unless the application says otherwise.
  • Septic installers: the Health Department licenses eligible private sewage installation contractors and pumpers and keeps a contractor list. The licensed installer completes the layout sketch on the septic application and signs it.
  • Well work: the Health Department issues water well permits and approves well abandonment.
  • Livestock facilities: the form refers livestock waste questions to the state agriculture department’s program at 217-785-2427.

Rather not deal with the Pike County building department?

Get a free quote →

Roofing contractors hold state licenses. Inside a municipality with its own zoning, its rules on trade permits and contractors apply.

How to get a Pike County building permit

1. Confirm the lot is under county zoning

Locally zoned cities and villages are outside the county ordinance; call the Zoning Administrator if unsure.

2. Get Health Department approval

For septic or geothermal, get the signed approval before the building permit.

3. Draw the plot plan

Show the road, lot, new building, wells, sewage system, setbacks, abutting owners and north.

4. Complete the application

Mark the use and building type and give the cost and dimensions; leave sections that do not apply blank.

5. Pay and receive approval

Pay by check to Pike County Zoning; no permit is issued until the Administrator approves the application.

6. Post the permit and start within 180 days

Post the permit notice where the public can see it before work starts.

Review, corrections and what causes delay

A plot plan must accompany every application, and a building with a septic system or geothermal unit cannot get its permit until the Health Department has signed off. Projects that need a variance or conditional use wait for a Zoning Board of Appeals hearing and its certified-mail notice period. Substantial changes from the approved plans can lead to denial of occupancy and fines, and work beyond what the permit describes can draw added fees.

Inspections and the use certificate

Under the ordinance, no new or changed building or land may be used until the Zoning Administrator issues a Zoning Compliance and Use Certificate. When the work described on the application is complete, notify the Administrator in writing, by phone or in person; the Administrator inspects the property, records the date of final inspection and approves or denies occupancy and use. The application authorizes zoning staff to enter and photograph the property.

The Administrator may require a certified copy of the approved plans to be kept on site, and a contractor who starts work before the permit is posted is in violation of the ordinance. Septic systems get their own final inspection: the licensed installer must notify the Health Department at least two business days before installation, and a septic permit is void one year after it is issued.

Want this handled start to finish?

Get a free quote →

Illinois building code in Pike County

FEMA’s Community Status Book lists Pike County (community 170551, unincorporated areas) as participating in the National Flood Insurance Program, with its first flood insurance rate map dated January 3, 1986 and the current map August 16, 2018.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Permit search and official resources

All building and use permit applications, and copies of issued permits, are filed and kept in the Zoning Administrator’s office, so ask there first for a past permit or certificate. The County Clerk records and stores the minutes of every county board meeting.

Inspections are where schedules slip.

Get a free quote →

Pike County permit FAQs

Do I need a county permit for a farm building?

Yes, a permit is still required, but buildings for agricultural use pay no fee. Starting one without a permit carries a $100 penalty.

How much is a permit for a new house in Pike County?

$50 under 1,500 square feet, $100 up to 2,000, $150 up to 2,500 and $200 above that.

Do I need a permit to re-roof?

No. The ordinance exempts routine maintenance and repair, including re-roofing, and alterations worth $700 or less.

How long is a Pike County permit good for?

It is void 180 days after issue if construction has not begun.

What happens if I build first and apply later?

The fee doubles. The application has a post-construction box for work already built, and agricultural buildings carry a $100 penalty instead.

Does the county issue permits inside Pittsfield?

The county ordinance excludes locally zoned cities, villages and towns; ask Pittsfield or the village hall about its own permits.

Who approves septic systems?

The Pike County Health Department at 606 W. Adams Street, 217-285-4407, which also permits wells.

Simplify Pike County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Pike County sooner?

Let Alliance prepare, file, and track your Pike County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Pike County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.