Skip to main content
Municipal GuideIllinoisMundelein · Lake County

Mundelein, Illinois Building Permit Guide

To get a building permit in Mundelein, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Mundelein’s Building Department issues every building permit in the village through its BS&A online system, with flat fees for most home projects and a $25 application fee on every permit.

Authority: Village of Mundelein Building DepartmentFiling: BS&A online portalPhone: 847-949-3283
Authority
Building Department300 Plaza Circle, Mundelein
Typical fee
$75–$125 flatPlus $25 application fee
Review time
10 business days or lessSmall permits aimed at 5 days
Contractors
Village registrationValid 12 months

In the Village of Mundelein, the Building Department at 300 Plaza Circle (847-949-3283) issues all building permits and reviews all building plans, under Building Director George Sellas. Residents and registered contractors apply online through the village’s BS&A system. Most home projects carry a flat fee of $75 or $125, remodeling is charged at $2 per square foot, and a $25 permit application fee is added to every application under Ordinance 26-04-35. Approval typically takes 10 business days or less.

What requires a building permit in Mundelein?

The village’s Homeowner Project Guide, last updated July 14, 2026, sets out a permit and a fee for nearly every exterior and interior project a homeowner is likely to take on. Even a fence replacement or a new water heater needs one, while a handful of maintenance jobs do not.

Permit needed

  • Fences and dog runs, including replacing 50% or more of an existing fence
  • Decks, porches, patios and service walks
  • New and replacement driveways
  • Detached garages, garage demolition, sheds and other accessory structures
  • Roofing, siding, soffit and fascia
  • Replacement windows and exterior doors, and the door between the garage and the house
  • Water heaters, central air conditioners and permanent generators
  • Electrical service changes
  • Remodeling, basement finishing and additions
  • Pools holding more than 2 feet of water or larger than 250 square feet, hot tubs and spas
  • Underground lawn sprinklers and sanitary or storm sewer repairs

No permit

  • Repairing less than 50% of an existing fence
  • Seal coating a driveway
  • Gutters and downspouts, unless they drain to underground basins
  • Window air conditioning units

What Mundelein decides and what the state holds

Mundelein is a home-rule village that writes its own construction rules. Its project guide lists the codes used for all construction: the 2024 International Building, Residential, Mechanical, Fire and Property Maintenance Codes, mostly with local amendments; the 2023 National Electrical Code with local amendments; and the 2024 International Energy Conservation Code with the State of Illinois amendments. The local amendments are in Title 16, Building and Construction, of the Municipal Code. Plumbing follows the 2014 Illinois State Plumbing Code and accessibility the 2018 Illinois Accessibility Code; the Building Department also recommends new code adoptions to the Village Board as national and state standards change.

Short on time to read all of this?

Get a free quote →

Mundelein building department: who handles permitting

The Building Department issues all building permits in the village, reviews all plans, performs building, electrical, fire, plumbing and property maintenance inspections, assigns street addresses and issues certificates of occupancy. Its staff includes the Building Director, a Deputy Building Commissioner, an administrative assistant, six full-time inspectors and two part-time inspectors. It also coordinates annual fire inspections of every building in the village except one- and two-family homes, runs the state-required elevator inspection program through third-party inspectors, and provides a 24-hour on-call inspector for Mundelein and Hawthorn Woods. Zoning, planning and development approvals sit with the separate Community Development Department in the same building. Property outside the village limits is permitted by Lake County.

Mundelein permit contacts
DetailInformation
Building Department300 Plaza Circle, Mundelein, IL 60060
Phone and e-mailCustomer Service 847-949-3283; building@mundelein.org
Department headGeorge Sellas, Building Director
HoursMonday to Friday, 8 a.m. to 5 p.m.
Community Development (zoning)847-949-3282
Village Hall847-949-3200

Mundelein permit types

Permit applications, business and contractor registrations and landlord registrations all run through the village’s BS&A online system. Residents applying for themselves or on a contractor’s behalf use the residents’ application; contractors first create a BS&A account and request the required WEBPIN through the village’s online form. Anyone applying in person fills in the paper application printed in the Homeowner Project Guide and hands it in with the required documents. Nearly every residential permit needs an electronic copy of the plat of survey showing the work, and structural projects also need an electronic set of drawings.

Residential permits

  • Decks and porches. Unroofed decks go in the rear yard only, at least 3 feet from the side lot line and 5 feet from the rear, never over an easement; a deck more than 4 feet above grade must be designed by a licensed architect or engineer. Piers go 42 inches below grade, decks over 30 inches high need a 36-inch guardrail, and decks over 2 feet high need diagonal bracing at each post. A roofed deck counts as a porch, and an unenclosed porch may project 6 feet into a front, corner-side or rear yard.
  • Sheds and garages. A shed may be up to 144 square feet and 15 feet tall, sits in the rear or interior side yard 3 feet from the side line and 5 feet from the rear and corner-side lines, and must be anchored. A detached garage may be up to 676 square feet and 15 feet high, 3 feet from side lines, 5 feet from the rear line and 10 feet from the house; its electrical trench is inspected.
  • Fences. Up to 6 feet behind the front building line and along interior side and rear lines, but only 3-foot open fences in front of the house and 4-foot open fences along a corner side yard; an 8-foot fence is allowed where a lot backs onto a county or state highway, a tollway or a nonresidential use. Posts face inward, and fences in drainage easements keep 3 inches of clearance.
  • Driveways. No wider than 20 feet unless the garage is wider, one curb cut per lot, and work in the parkway needs the village’s right-of-way indemnification form signed by the owner.
  • Pools and spas. A barrier at least 4 feet high must be in place before filling, 5 feet from buried wiring and 10 feet from overhead lines, and a certificate of occupancy is required for the pool; a spa with a locking safety cover may not need a barrier.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial work follows the 2024 International Building Code and 2024 International Fire Code as the village amended them, and once open, every building other than a one- or two-family home is on the annual fire inspection schedule the department coordinates. Larger projects go through the development approval process: a concept plan presented to the Board of Trustees, entitlement applications with a public hearing at the Planning and Zoning Commission or the Community and Economic Development Committee where needed, a Board decision, and then permit applications, building plans and engineering for review. Businesses also need a village business registration, which includes a zoning and occupancy check, and the department encourages pre-design and pre-construction meetings for large or complex projects.

What comes before the building permit

  • Zoning. The Zoning Ordinance (Title 20 of the Municipal Code, amended by Ordinance O-26-06-55) and the 2026 zoning map set uses and setbacks; setbacks for additions vary by subdivision, so call Community Development when designing one.
  • Planning documents. The Comprehensive Plan, adopted in February 2021 and amended in February 2026, and the April 2021 Residential Design Guidelines guide larger projects.
  • Floodplain. In the floodplain a basement may not be finished, and a room addition must be raised to the flood protection elevation.
  • Utilities and the right-of-way. Call J.U.L.I.E. at 811 before digging, and expect an escrow deposit for sewer work in the right-of-way.

Mundelein permit costs and fees

All permit fees are set in Chapter 3.80 of the Municipal Code, and the Homeowner Project Guide notes that newer amendments may not yet appear there. The project guide’s figures for common residential work are below. Every application also carries a $25 permit application fee, added automatically under Ordinance 26-04-35.

Rather talk it over?

Call 1-855-478-4290 →
Mundelein residential permit fees (Homeowner Project Guide, July 14, 2026)
ProjectFee
Permit application fee (every permit)$25
Fence or dog run$75
Deck or porch$125
Service walk / patio$75 / $125
Driveway: new / resurface$125 / $75
Detached garage (with electrical) / garage demolition$125 / $75
Shed: no electrical / with electrical$75 / $125
Roofing, siding, water heater, sewer repair, lawn sprinkler$75 each
Replacement windows and doors / new openings$75 / $125
Air conditioner: replacement / new; generator$75 / $125 per unit; $125
Electrical service$125
Remodeling or basement finishing$2.00 per sq ft of floor area
Additions$3.00 per sq ft added
Pool: permanent / storable$125 / $75 per year

Worked example from these figures: finishing a 600-square-foot basement costs 600 × $2.00 = $1,200, plus the $25 application fee, for $1,225. A shed with electrical costs $125 plus $25, or $150. Online and card payments through BS&A carry a 3% convenience fee; checks and cash paid at Village Hall do not. Sewer repairs in the right-of-way also need a refundable escrow deposit, and the Building Department lists an impact fee schedule among the documents it provides for new development.

Trade permits and who may pull them

Contractors must register with the village before they work, and a registration lasts 12 months from its approval date, whenever the project starts. Each trade hands in its credentials electronically:

Rather not deal with the building department?

Get a free quote →
  • Electricians: a registered electrical contractor does the work and provides an electrical registration from an Illinois municipality plus a certificate of liability insurance. Work follows the 2023 National Electrical Code as the village amended it; service panels need a main disconnect and two forms of grounding.
  • Plumbers: Ordinance 08-07-37 requires an Illinois-licensed and bonded plumbing contractor for plumbing work. The plumber provides the state contractor’s registration and license and a notarized letter of intent; anyone installing a backflow device also shows a CCCDI card.
  • Irrigation and alarm contractors: a state irrigation registration, or a state private alarm license for low-voltage alarm work.
  • Homeowners: may do their own electrical, plumbing and carpentry work on their own home after signing the village’s electrical, plumbing or construction waiver, and must live in the house for six months after the work is approved. The plumbing waiver applies only to the owner’s primary residence.

How to apply for a Mundelein building permit

1. Confirm the village handles it

Check that the property is inside Mundelein; unincorporated addresses go to Lake County.

2. Read the project guide

Find your project in the Homeowner Project Guide for its fee, setbacks and drawings.

3. Set up access

Contractors register with the village, create a BS&A account and request a WEBPIN; residents can apply directly.

4. Upload the documents

Attach the plat of survey, drawings and any trade credentials or homeowner waiver.

5. Pay the fees

Pay online (3% card fee) or by check or cash at Village Hall.

6. Build and book inspections

Follow the inspection list issued with the permit, giving 48 hours’ notice for each visit.

Review, corrections and what causes delay

Approval and processing typically take 10 business days or less, and the department aims to approve minor permits in 5 days or less; the size and complexity of the project set the pace. A missing plat of survey, drawings that lack joist, beam and pier details, an unregistered contractor or a plumber without a notarized letter of intent are the usual reasons a file waits. A permit expires one year after issue, or after six months if work has not started.

Inspections and certificates in Mundelein

A list of required inspections comes with each permit. Book them by contacting the Building Department at 847-949-3283 with at least 48 hours’ notice. Project-specific checks in the guide include:

  • Fences in easements: a posthole inspection before posts go into a utility or drainage easement.
  • Detached garages: the electrical trench to the garage.
  • Lawn sprinklers: the RPZ backflow device must be tested and approved for the final inspection, and retested every year by a certified contractor.
  • Pools: the barrier must be in place before the pool is filled, and the pool needs a certificate of occupancy.
  • Remodels and additions: extra smoke detectors may be required in the new space or the existing house; ask an inspector about your project.

Want this handled start to finish?

Get a free quote →

The Building Department issues certificates of occupancy, and its inspectors also handle property maintenance complaints, which go to the village’s administrative adjudication hearings. Landlords must register rental properties every year under Ordinance 09-12-77.

Illinois building code in Mundelein

Mundelein enforces the 2024 International Codes and the 2023 National Electrical Code with the local amendments in Title 16 of its Municipal Code. FEMA’s Community Status Book lists the Village of Mundelein (community 170382) as participating in the National Flood Insurance Program, with a current flood map dated February 17, 2016; the village is not in the Community Rating System.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Mundelein building permit FAQs

How much is a building permit in Mundelein?

Most home projects are a flat $75 or $125, remodeling is $2 per square foot and additions $3 per square foot, and every application adds a $25 fee.

Do I need a permit for a fence in Mundelein?

Yes, $75 for a new or replacement fence; repairing less than 50% of an existing fence needs no permit.

How big can a shed be?

Up to 144 square feet and 15 feet tall, in the rear or interior side yard and outside every easement.

Can I do my own electrical or plumbing work?

Yes, on your own home after signing the village waiver, as long as you live there for six months after the work is approved.

Do contractors have to register?

Yes. Registration is required, runs through BS&A and is valid for 12 months from approval.

How long does a permit take?

Typically 10 business days or less; the department aims to issue smaller permits in 5 days or less.

Is there a fee for paying online?

Yes, BS&A adds 3% to online and card payments; checks and cash at Village Hall avoid it.

Inspections are where schedules slip.

Get a free quote →

Mundelein permit search and official resources

Questions about an open permit go to Building Department customer service at 847-949-3283 or building@mundelein.org, and the permit holder pays any balance through the BS&A system. Requests for older permit files and plans go through the village’s NextRequest Freedom of Information Act portal: non-commercial requests are answered within 5 business days and commercial requests within 21, electronic records are free unless the request is voluminous, and paper copies cost $0.15 a page after the first 50 black-and-white pages.

Simplify Mundelein permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Mundelein sooner?