In the Village of Round Lake Beach, building permits come from the Building Department of the Building, Economic & Community Development Department at Village Hall, 1937 N. Municipal Way (847-546-2351). Residential applications go to ResidentialPermitting@RoundLakeBeachIL.gov or the front desk, and simple jobs such as roofs, siding and furnace or air conditioner replacements can be filed through the BS&A online portal for approval in 24 to 48 hours. Most residential permits carry a flat fee of $25 to $80 that already includes the inspections, and every contractor must register with the village each year.
What requires a building permit in Round Lake Beach?
The village publishes a separate residential application, with its own review checklist and inspection list, for each kind of project that needs a permit. If your project is on this list, it needs a permit:
Residential permits
- New single-family homes and foundations
- Additions, rehabs and remodels, with or without plumbing
- Decks, patios, porches and sidewalks
- Accessory structures and new detached garages
- Fences and retaining walls
- Driveways
- Roofs and siding
- Furnace and air conditioner replacement
- Electrical, plumbing, generators and solar panels
- Pools, spas and hot tubs
- Accessibility ramps and demolition
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Other village permits
- Commercial building permits and signs
- An occupancy permit before any home is sold
- Rental certification for residential rentals
- Business licenses and temporary outdoor dining
The village’s pages do not publish a list of work that is exempt from a permit, so call the department before starting anything not covered above.
What Round Lake Beach decides and what the state holds
The Building Department enforces the International Building Code and the village’s own ordinances, which are published in the Village Code. The village’s own application rules add local detail: fences may not carry any electrical device, farm-type and portable fencing such as snow fence or chicken wire is banned, and fence posts and deck piers must go at least 42 inches deep. Plumbing must be done by an Illinois-licensed plumber, and roof permits need a copy of the roofer’s Illinois license.
Round Lake Beach building department: who handles permitting
The Building, Economic & Community Development Department handles building permits, inspections, code enforcement, rental certification, business licensing and zoning. Permits are approved and released by the village’s building official, and commercial applications are signed off by the Director of Inspections. Planning questions go to the Village Planner, a planning consultant reached through the zoning page. Round Lake Beach is a separate village from Round Lake; addresses outside Round Lake Beach are permitted by their own village or, if unincorporated, by Lake County.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Village Hall | 1937 N. Municipal Way, Round Lake Beach, IL 60073 |
| Phone | 847-546-2351 |
| Permit e-mail | ResidentialPermitting@RoundLakeBeachIL.gov |
| Hours | Monday to Friday, 8 a.m. to 5 p.m.; first Saturday of the month, 9 a.m. to noon; closed holidays |
| Online portal | BS&A Online, linked from the Building Permits page |
Round Lake Beach permit types
Each residential form doubles as a review guideline: it lists what to show on the drawings, what the plan reviewer and zoning staff check and which inspections follow. The village recommends filling in the form and attaching it even when applying through the portal. Homeowners and contractors both sign, and when a contractor applies, the village still needs the owner’s signature on the application or a signed contract.
Residential permits
- Decks: at least 5 feet from the rear and side lot lines and never in an easement, with piers at least 42 inches deep and 14 inches across. Decks less than 48 inches high need a weed barrier covered with 2 inches of gravel, guardrails start at 30 inches above grade, and decks in a floodplain must meet the stormwater management ordinance. Stairs are at least 36 inches wide on at least three stringers no more than 18 inches apart, with risers of up to 7¾ inches, treads of at least 10 inches, a light at the top landing and frost-protected landings; the ledger is at least a 2-by-8, flashed along its full length.
- Fences: up to 48 inches in front and corner side yards and 72 inches in rear and side yards, finished side out, on or inside the property line; fences across drainage easements sit 2 to 3 inches above grade. Wood fences need posts at least 3 inches across and 2-by-3-inch crosspieces; chain-link fences need 9- or 11-gauge wire with the protective edge at the bottom; posts are no more than 10 feet apart.
- Remodels and additions with plumbing: stamped drawings by a licensed architect or engineer for structural changes, a letter of intent from the state-licensed plumber, insulation values, a plumbing diagram, an electrical layout with a panel schedule, and interconnected, hard-wired smoke and carbon monoxide alarms.
- Roofs: a copy of the Illinois roofer’s license, and a note on whether the house has solar panels.
- New homes: meet with planning and zoning first to confirm the approved use of a vacant lot.
Commercial permits
Commercial work uses the commercial building permit application, which splits the job into up to four scopes of work, each with its own estimated cost and contractor, plus a list of all subcontractors and the signage guidelines for sign work. Commercial applications, plans and contractor lists go to the department by e-mail. Reviews take about 10 to 15 business days depending on complexity, and the fee is calculated after review from the number of reviews and the square footage.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Zoning rules are in Title 9 of the Village Code, with the Lake Overlay and Orchard Lane Overlay districts and the 2025 village and zoning map; home occupations have their own guidelines.
- Hearings. Rezonings, special uses, planned unit developments, zoning and sign variations and code amendments go to the Planning and Zoning Commission, which recommends to the Village Board. The commission, which serves as both the plan commission and the zoning board of appeals, has seven members appointed by the Mayor and Board of Trustees to five-year terms and meets at 7 p.m. on the first Thursday of each month in the council chambers at Village Hall; the village posts a sign-up form for speakers at public hearings.
- Stormwater. Work in a floodplain must meet the village’s stormwater management ordinance.
- Utilities. Call J.U.L.I.E. at 811 before any digging.
Round Lake Beach permit costs and fees
The Building Permits page lists a flat fee for each residential permit, and the cost of the required inspections is included in it. Extra charges apply only for cancellations, missed inspections and re-inspections.
| Project | Fee |
|---|---|
| Fence or retaining wall | $25 |
| Deck; patio, porch or sidewalk | $50 |
| Roof, siding, electrical, plumbing, generator, solar panel or foundation | $50 each |
| Furnace or air conditioner replacement | $50 each |
| Accessory structure | $50; $70 with a concrete foundation |
| Driveway / new detached garage | $80 / $80 |
| Demolition | $50 garage; $100 house |
| Pool / spa or hot tub | $75 above ground, $300 in-ground / $75 |
| Rehab, addition or remodel | $200 without plumbing; $275 with plumbing; $300 with underground plumbing |
| Re-inspection / cancellation within 24 hours | $30 / $25 |
| Missed inspection / work without inspections | $100 per occurrence |
| Work without a permit | $250 |
| 90-day extension / replacement permit card | $10 / $5 |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the list: a new deck costs $50, including its pier, framing and final inspections; if the work runs past 90 days, a one-time $10 extension adds another 90. A new single-family home is priced separately. The village’s single-family information packet, posted in 2023, lists a $2,500 permit fee (with $250 of it, the plan review, due at submittal), $4,710 in water and sewer fees, a $3,000 public way restoration bond and a $2,000 seed and sod bond, a Lake County Public Works fee of $3,540 per unit and impact fees payable to the village, park, library, school and fire districts; confirm the current amounts with the department. Payment is due after the review is approved and can be made online with the property address or permit number; bonds and contractor registration fees cannot yet be paid online, so ask the department how to pay them.
Trade permits and who may pull them
All contractors working in the village must register with Round Lake Beach, and every registration expires on April 30. Registration needs:
- A $50 registration fee, except for plumbing and fire alarm contractors.
- A certificate of insurance and a $10,000 bond, again except for plumbers and fire alarm contractors.
- A copy of the license for every contractor who holds a trade license, such as the plumber’s and the roofer’s Illinois licenses.
Every application lists the contractor for each trade, and the village checks that each one is currently registered before it issues the permit. A contractor who is not in good standing with the village is refused, and one that repeatedly misses inspections can be banned from working in the village. Applications also let the owner mark the work as owner-completed (“None/DIY” on the commercial form), but plumbing still requires an Illinois-licensed plumber.
Rather not deal with the building department?
Get a free quote →How to apply for a Round Lake Beach building permit
Download the residential or commercial form for your project from the Building Permits page.
Fill in the form, mark the details on a current plat of survey and attach drawings.
Make sure every contractor on the job is registered for the year ending April 30.
E-mail the packet or bring it to Village Hall; use the BS&A portal for roofs, siding, HVAC and sewer repairs.
Once the review is approved, pay the fee (online payment is available) and the building official releases the permit.
Book each inspection at least 48 business hours ahead and finish within 90 days.
Review, corrections and what causes delay
Residential reviews take about 7 to 10 business days and commercial reviews 10 to 15; over-the-counter permits take 24 to 48 hours when complete. Plans with missing information are rejected. A permit can also be denied when the application is incomplete, the drawings do not meet village codes, the property has open invoices, liens or code violations, or a contractor is not in good standing; the village says it works with applicants to resolve these issues.
Inspections and certificates in Round Lake Beach
The applicant, not the village, schedules every inspection, by calling 847-546-2351 or by e-mail with at least 48 business hours of notice. Inspections are booked into three windows: 7:30 to 9:30 a.m., 9:30 to 11:15 a.m. or 12:15 to 3 p.m. Be ready at the start of the window, because inspectors cannot wait while work is finished and a late start is charged as a re-inspection. E-mail requests should be marked urgent, with the property address and “Inspection request” in the subject and the address, inspection type and preferred date and window in the body.
- Decks: piers before concrete is poured, rough framing and final.
- Fences: post holes before concrete, then final.
- Roofs: a pre-roof inspection of the ice and water shield and drip edge, then final; a second pre-roof visit is charged.
- Remodels with plumbing: underground plumbing and electric, footings, foundation, insulation, fire stopping, rough electric, framing, plumbing and mechanical, then finals.
Carrying on without the required inspection at the scheduled stage can mean the village orders the work taken apart. Permits last 90 days from issue. Before any home is sold, the owner needs a village occupancy permit: apply online at least two weeks before closing, pay $60 and the village carries out an exterior-only inspection and transfers the water and sewer account.
Illinois building code in Round Lake Beach
Round Lake Beach enforces the International Building Code and the codes adopted in its Village Code. FEMA’s Community Status Book lists the Village of Round Lake Beach (community 170389) as participating in the National Flood Insurance Program, with a current flood map dated October 5, 2023; the village is not in the Community Rating System.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Round Lake Beach building permit FAQs
How much is a building permit in Round Lake Beach?
Most residential permits are a flat $25 to $80, including inspections; remodels run $200 to $300 and in-ground pools $300.
How tall can my fence be?
48 inches in front and corner side yards and 72 inches in rear and side yards.
How long is a permit valid?
90 days, with one automatic 90-day extension for $10; a second extension needs special approval.
Do contractors have to register?
Yes. Registrations expire every April 30 and need a $50 fee, insurance and a $10,000 bond; plumbers and fire alarm contractors are exempt from the fee and bond.
How do I schedule an inspection?
Call 847-546-2351 or e-mail at least 48 business hours ahead and pick one of the three daily windows.
Do I need anything from the village to sell my house?
Yes, a $60 occupancy permit with an exterior inspection; start at least two weeks before closing.
Round Lake Beach permit search and official resources
For the status of a permit, call the department at 847-546-2351 or e-mail the residential permitting address; payments online need the property address or permit number. Copies of past permits, plans and other village records are requested through the NextRequest public records portal linked as “FOIA Request” on the village website, under the Illinois Freedom of Information Act.
Inspections are where schedules slip.
Get a free quote →- Building permits, fees and inspections
- Building, Economic and Community Development
- Residential deck application
- Residential fence application
- New single-family dwelling information packet
- Commercial building permit application
- Zoning and land use
- Planning and Zoning Commission
- Occupancy permits for property sales
- FEMA Community Status Book, Illinois
Simplify Round Lake Beach permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Round Lake Beach sooner?
Let Alliance prepare, file, and track your Round Lake Beach permits while your crew stays on the job.
More Illinois permitting guides
Lake County
Read guide →Vernon Hills
Read guide →Wauconda
Read guide →Sangamon County Building Permit Guide
Read guide →Schaumburg Building Permit Guide
Read guide →Schiller Park Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Round Lake Beach permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.