Morton Grove, Illinois Building Permit Guide

To get a building permit in Morton Grove, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Morton Grove’s Building and Inspectional Services, part of the Department of Community and Economic Development at Village Hall, 6101 Capulina Avenue, issues building and trade permits inside the village.

Authority: Morton Grove Building & Inspectional ServicesFiling: Village Hall or BS&A onlinePhone: 847-470-5214
Authority
Building & Inspectional Services6101 Capulina Avenue, Morton Grove
Plan review
Up to 15 business daysUsually less for small jobs
Contractors
$110 village license$10,000 bond and $1 million insurance
Inspections
1 business day notice2 days for engineering and fire

Inside the Village of Morton Grove, building permits come from Building and Inspectional Services, part of the Department of Community and Economic Development at Village Hall, 6101 Capulina Avenue (847-470-5214, Monday to Friday 8:30 a.m. to 5:00 p.m.). Most applications are dropped off or mailed to Village Hall, while generator, electrical, fence, flatwork, HVAC, sewer repair, solar and water heater permits can be filed online through BS&A. Plan review typically takes no more than 15 business days, and every contractor needs a $110 village license before a permit is issued.

What requires a building permit in Morton Grove?

Morton Grove publishes its own permit list. On it, opening or disturbing any wall or drywall, adding a receptacle or light fixture, and changing the grade of a lot all need permits.

Permit required

  • New buildings and additions
  • New or replacement detached garages, sheds, fences, gazebos and pergolas
  • Disturbance of any wall or drywall
  • Signs, including a change of box sign panels
  • Pools, ponds and spas 2 feet deep or more
  • Electrical service changes, new circuits, receptacles and light fixtures
  • New or replacement furnaces, boilers, air conditioners and water heaters
  • Moving plumbing fixtures; sewer and water line repairs; cleanouts, flood control valves and overhead sewers
  • Grade changes and flatwork such as patios, driveways and sidewalks

No permit

  • Normal maintenance of electrical, plumbing and mechanical systems
  • Power rodding sewer lines
  • Replacement windows and doors in existing openings
  • Pools, ponds and spas less than 2 feet deep
  • Temporary signs, which still need prior village authorization

A new or replacement detached garage or accessory structure of 400 square feet or more needs a drainage plan with the application. Loud construction is limited to 7:00 a.m. to 6:00 p.m. on weekdays and 8:00 a.m. to 6:00 p.m. on Saturdays, with no work on Sundays and seven listed holidays except emergencies under a village permit; homeowners doing their own projects may work from 7:00 a.m. to 8:00 p.m. Monday to Saturday and 9:00 a.m. to 8:00 p.m. on Sundays and holidays.

What Morton Grove decides and what the state holds

The village adopts its own codes with local amendments: the 2018 International Building, Existing Building, Residential, Fuel Gas, Mechanical, Property Maintenance and Fire codes, the NFPA 101 Life Safety Code and the 2011 National Electrical Code. It also writes its own zoning and development rules in the Unified Development Code (Title 12), its sign rules (Chapter 10-10) and its own fee section. Two items on the code list come from the state: the Illinois Plumbing Code (2014 edition, with village amendments) and the 2024 International Energy Conservation Code as adopted by Illinois. Since June 1, 2026 the state People Over Parking Act limits off-street parking requirements in mapped parts of the village.

Short on time to read all of this?

Get a free quote →

Morton Grove building department: who handles permitting

Building and Inspectional Services takes permit applications, reviews plans, schedules inspections and enforces the property maintenance code; the village sanitarian, who inspects food businesses, works through the same office. The Fire Department’s Fire Prevention Division reviews and inspects fire and life safety work. Zoning, variations and design review are handled by the Department of Community and Economic Development, which staffs the Zoning Board of Appeals, Plan Commission and Appearance Commission.

Morton Grove permit contacts
DetailInformation
Building & Inspectional ServicesVillage Hall, 6101 Capulina Avenue, Morton Grove, IL 60053; 847-470-5214; building@mortongroveil.org
HoursMonday to Friday, 8:30 a.m. to 5:00 p.m. (Village Hall 847-965-4100)
Zoning Administrator847-663-3062; commdev@mortongroveil.org
Fire Prevention847-470-5244 (inspections 847-470-5226)
Public Works (utilities, J.U.L.I.E.)847-470-5235
Unincorporated landCook County Department of Building and Zoning; Skokie satellite office, 5600 Old Orchard Road, 847-470-3730

Morton Grove permit types

The village posts separate applications for accessory structures, buildings, decks, demolition, detached garages, electrical work, fences, flatwork, heating and air conditioning, parking lots and site improvements, plumbing, right-of-way work, signs, temporary signs and swimming pools, plus a basement build-out supplement and overhead sewer requirements. Until all permit types move to BS&A online in 2027, most are filed on paper.

Residential permits

  • New homes and additions. The building application asks for four copies each of the plat of survey, plot plan, construction plans and landscape and tree preservation plans, with approvals from building, electrical, plumbing, zoning and engineering.
  • Fences. The fence application asks for the construction cost, height, running length, percent transparency and material, three plats of survey marking the fence, and the signed job proposal; it can also be filed online.
  • Basements, sewers and flood control. Basement build-outs use a supplement, and overhead sewers, cleanouts and flood control valves need permits under the village’s overhead sewer requirements.
  • Online applications. Backup generators, new electrical work, fences, new flatwork, furnace and AC replacement, HVAC alterations, private sewer repairs, solar panels and water heaters can be applied for through BS&A.

Commercial permits

Commercial, industrial and multi-family projects need the same four plan sets plus approvals from health, public works, appearance, community development, engineering, the sanitary district, police crime prevention and fire prevention. Work must match the Appearance Certificate; any change in material, style, design or color goes back to the Appearance Commission. Fire sprinklers, fire alarms and storage tanks need Public Works, electrical and fire prevention approval. A business moving in needs a Business Compliance Certificate, which confirms zoning.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning. Check the district on the interactive zoning map. Variations go to the Zoning Board of Appeals after mailed notice to neighbors and a sign on the property; map and text amendments, special uses, PUDs, subdivisions and vacations have their own applications.
  • Stormwater. The village can require stormwater management under Unified Development Code section 12-10-4 even when MWRD does not, may ask for an MWRD letter of determination, and will not issue a certificate of occupancy until any MWRD Watershed Management Ordinance permit is closed out.
  • State roads. Work in the right-of-way of Golf Road, Dempster Street, Oakton Street, Harlem Avenue, Waukegan Road or Caldwell Avenue needs an IDOT permit from District 1 in Schaumburg (847-705-4401); village streets need a village right-of-way permit.
  • Demolition. Removing a building, a detached garage or a structural element such as a roof or bearing wall also needs a Cook County demolition permit, which the county says usually issues within 3 to 7 business days; utilities must be capped at the mains and the site enclosed by a 6-foot chain link fence.

Morton Grove permit costs and fees

Building permit fees are set by Section 1-11-4 of the Village Code, and staff calculate them from the plans when the permit is granted; the application’s fee page lists building, structural engineering, electrical, plumbing, elevator, certificate of occupancy, construction water, street and parkway openings, water and sewer taps, water meter, plan review and private tree removal lines. The building permits page states these related charges:

Morton Grove charges stated on village pages
ItemFee
Third-party plan review or consulting engineeringVillage cost plus the greater of $100 per review or 10%
Third-party inspectionsVillage cost plus the greater of $100 per inspection or 10%
Deposit, permits needing architectural plans$500 each
Deposit, permits needing engineering plansGreater of $500 or the village’s cost estimate
Right-of-way depositGreater of $750 or the village’s cost estimate
Right-of-way repair110% of village time and materials
Contractor’s license$110 for 12 months
Covered building registration (structural integrity program)$110 a year
Real estate transfer stamp$3 per $1,000 of price; $25 exempt; $100 to expedite

Rather talk it over?

Call 1-855-478-4290 →

The transfer stamp page gives its own example: a $200,900 sale needs a $603 stamp. Elevator and escalator owners are invoiced for the village’s semiannual inspections. Ask Building and Inspectional Services for the Section 1-11-4 amount for your project; the fee is due, with contractor registration complete, before the permit is released.

Trade permits and who may pull them

All contractors and subcontractors must be licensed with the village before any permit is issued. The license costs $110, runs 12 months from issue and can be applied for on paper or online (staff invoice the fee for payment through Illinois ePAY). Every application must include a copy of the signed job proposal with the scope of work.

  • General, excavation, demolition, concrete, masonry and sewer contractors: a numbered $10,000 bond with the village’s indemnity wording and a $1,000,000 liability certificate naming the village as additional insured (ISO form GC2026 or equivalent).
  • Electrical contractors: bond, insurance and a copy of the electrical license.
  • HVAC contractors: bond and insurance.
  • Roofing contractors: bond, insurance and a copy of the state roofing license issued by the Illinois Department of Financial and Professional Regulation.
  • Plumbing and sewer contractors: the Illinois Department of Public Health license or registration and a copy of the plumber’s license with photo ID.
  • Fire alarm and sprinkler contractors: certification or registration from the Office of the State Fire Marshal.

The web page exempts landscapers and painters from licensing, while the license form still lists landscaping contractors with a bond and insurance; ask the department which rule it applies.

Rather not deal with the building department?

Get a free quote →

How to apply for a Morton Grove building permit

1. Check zoning

Look up the district and call the Zoning Administrator if a variation or appearance review may be needed.

2. License the contractors

Each contractor files the license application with bond, insurance and the signed job proposal.

3. Pick the right application

Use BS&A online for the listed simple jobs; download the matching paper form for everything else.

4. Assemble the plans

Plat of survey, site plan and construction plans in the number of sets the form lists, plus a drainage plan for large garages.

5. Drop off or mail

Deliver the package to Building and Inspectional Services at 6101 Capulina Avenue.

6. Answer comments and pay

Respond to review comments, then pay the fees so the permit can be issued.

Review, corrections and what causes delay

Plan review usually takes no more than 15 business days, less for smaller jobs, and the village’s procedural control rule gives departments and commissions 14 calendar days to comment once a valid application is logged, with extensions for full-commission review or missing documents. At the end of review the village either approves the permit, subject to contractor registration and fees, or sends comments. Revised plans need a point-by-point response and revision clouds marking every change. A complete first submittal is the fastest route.

Inspections and certificates in Morton Grove

Schedule building inspections at least one business day (24 hours) ahead with Building and Inspectional Services at 847-470-5214 or building@mortongroveil.org; engineering and Fire Prevention Bureau inspections need two business days. The permit holder’s authorized agent must be present. Depending on the job, inspections cover concrete and asphalt pre-pours, footings, foundation drain tile, sewer and water service, grade elevations, electric service, rough framing, electrical, plumbing and mechanical, insulation, garage floors, parking lots, final building and trades, landscaping and appearance, fire prevention, elevators and the certificate of occupancy. Call J.U.L.I.E. and Public Works at least 48 hours before digging.

Ordinance 26-13, passed June 23, 2026, created a structural integrity program for multi-family buildings with 10 or more units or three or more stories, whether rented or owner-occupied. Owners register each covered building every year ($110, first due December 31, 2026). A licensed Illinois architect or engineer must inspect the building at 30 years of age and every 10 years after; buildings with a certificate of occupancy dated on or before December 31, 1997 need their first report by July 1, 2027.

Illinois building code in Morton Grove

Morton Grove enforces the codes on its Building and Construction Codes page with local amendments, through Building and Inspectional Services and the Fire Prevention Division. FEMA’s Community Status Book lists the Village of Morton Grove (community 170128) as participating in the National Flood Insurance Program, with flood maps effective August 19, 2008.

Want this handled start to finish?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Morton Grove building permit FAQs

Do I need a permit to replace windows in Morton Grove?

No, not for replacement windows and doors in existing openings. New openings, wall or drywall work and additions do need permits.

Can I apply for a Morton Grove permit online?

Only for generators, new electrical work, fences, new flatwork, furnace and AC replacement, HVAC alterations, private sewer repairs, solar and water heaters; other permits go to Village Hall until BS&A covers them in 2027.

How long does plan review take?

Typically no more than 15 business days, and less for smaller projects.

Does my contractor need a village license?

Yes. Most contractors and subcontractors need a $110 village license with a $10,000 bond and $1 million of insurance before a permit is issued; plumbers and fire alarm and sprinkler contractors show their state credentials instead.

Do I need a Cook County permit to tear down a garage?

Yes. Demolishing a building, a detached garage or a structural element also needs a Cook County demolition permit.

What are construction hours in Morton Grove?

7:00 a.m. to 6:00 p.m. on weekdays and 8:00 a.m. to 6:00 p.m. on Saturdays; loud work is barred on Sundays and listed holidays.

How much is the transfer stamp when I sell?

$3 per $1,000 of the sale price, so a $200,900 sale costs $603; apply between two weeks and two business days before the stamp is needed.

Morton Grove permit search and official resources

To see past permits, plans or inspection records, file a Freedom of Information Act request with the village’s FOIA Officer online, by mail, in person at Village Hall, by email or by fax to 847-965-4162; the village answers within five business days for non-commercial requests, and the first 50 black-and-white pages are free ($0.15 a page after). Ordinances, minutes and the code book are available without a request.

Inspections are where schedules slip.

Get a free quote →

Simplify Morton Grove permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Morton Grove sooner?

Let Alliance prepare, file, and track your Morton Grove permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Morton Grove permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.