Skip to main content
Municipal GuideIllinoisNorthbrook · Cook County

Northbrook, Illinois Building Permit Guide

To get a building permit in Northbrook, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Northbrook’s Development and Planning Services Department at Village Hall, 1225 Cedar Lane, issues building and trade permits inside the village; home permits are emailed to the permit desk and priced by floor area.

Authority: Northbrook Development & Planning ServicesFees: FY 2027 Annual Fee OrdinancePhone: 847-664-4050
Authority
Development & Planning Services1225 Cedar Lane, Northbrook
Home additions
$3 per sq ft$280 minimum
Commercial
$600 + 1.4% of value1.2% on projects over $7 million
Inspections
48 hours’ noticePermit desk 847-664-4050

Inside the Village of Northbrook, building permits come from the Development and Planning Services Department at Village Hall, 1225 Cedar Lane (847-664-4050, permits@northbrook.il.us; Village Hall hours 8:30 a.m. to 4:30 p.m. weekdays). Residential applications and drawings are emailed to the permit desk, and fees can be paid online. Under the FY 2027 Annual Fee Ordinance, a home addition or interior alteration costs $3 per square foot of floor area with a $280 minimum, and multi-unit and non-residential work costs a $600 application fee plus 1.4% of construction value.

What requires a building permit in Northbrook?

Northbrook lists the work that does not need a permit and posts a page for each kind of permitted job, from interior walls and structural changes to driveways, patios, fences, sport courts, irrigation, tree removal and a lead-to-copper water service upgrade. An interior alteration permit is needed whenever interior walls or structural elements change.

Permit required (examples)

  • New homes, additions, major renovations and porches
  • Interior and exterior alterations, including roof slope changes or dormers
  • Foundation repair and fire or accident repair
  • Decks, sheds over 80 square feet, gazebos, pergolas and detached garages
  • Fences, driveways, patios, pools, hot tubs and sport courts
  • Site grading, retaining walls, swales and tree removal
  • HVAC, furnaces, electrical work, generators, plumbing, water heaters and sewer repair
  • Solar and other alternative energy; demolition; elevators

No permit needed

  • Residential re-roofing with shingles or shakes
  • Painting, drywall repair and floor coverings
  • Residential siding, soffits and stucco
  • Residential low-voltage wiring (security, cable, phone)
  • Prefabricated sheds up to 80 square feet (zoning still applies)
  • Residential asphalt sealcoating (the contractor still needs a license and affidavit)
  • Like-for-like electrical and plumbing fixture swaps

Construction noise is allowed from 7 a.m. to 7 p.m. on weekdays and 9 a.m. to 5 p.m. on Saturdays, and not at all on Sundays. Work begun without a permit carries a penalty of $100 or up to 50% of the total building permit fee, and a stop work order costs $500 before work may resume.

What Northbrook decides and what the state holds

Northbrook is a home-rule village. It enforces 2018 editions of the model building codes with its own amendments, sets every fee in its Annual Fee Ordinance, licenses most contractors and writes its own zoning, subdivision, inclusionary housing (December 2020) and engineering standards. Its new Zoning Code, Ordinance 2025-55, passed September 9, 2025 and took effect September 22, 2025; among other things it permits attached accessory dwelling units in the R-1 to R-5 single-family districts. Plumbing licenses are a state matter: the village asks for the plumbing contractor’s State of Illinois 055 registration, and the village’s energy code page refers to the Illinois Energy Conservation Code amendments.

Short on time to read all of this?

Get a free quote →

Northbrook building department: who handles permitting

The Development and Planning Services Department reviews plans, issues building and trade permits, and runs the inspection services division; its permit coordinator desk books inspections. Zoning relief and design review go to the Plan Commission, the Zoning Board of Appeals and the Architectural Control Commission named in the Zoning Code. Fire protection systems are permitted separately, with fire plan review fees set in the same ordinance. Questions about whether a project needs a permit at all go to the department at 847-664-4050.

Northbrook permit contacts
DetailInformation
DepartmentDevelopment and Planning Services, Village Hall, 1225 Cedar Lane, Northbrook, IL 60062
Permit desk847-664-4050; permits@northbrook.il.us
Village Hall847-272-5050; Monday to Friday, 8:30 a.m. to 4:30 p.m.
PaymentsVillage online payment portal (credit cards for fees up to $15,000)
Unincorporated landCook County Department of Building and Zoning; Skokie office, 5600 Old Orchard Road, 847-470-3730

The village’s Know Your Neighborhood property tool shows information for an address inside Northbrook; parcels outside the village in unincorporated Cook County are permitted by the county’s Department of Building and Zoning.

Northbrook permit types

Each residential permit type has its own page listing the forms, fee and required inspections. Residential submittals and drawings go to Permits@Northbrook.il.us (the interior alteration page also refers to the village’s Permit Application Portal), and multi-unit residential and non-residential projects have a separate set of pages for additions, alterations, new buildings and elevators.

Residential permits

  • Interior alterations. The package is Application Form 1.1, a building site and utility data worksheet, a water service and meter worksheet, a tree protection agreement and a fire protection letter of understanding, plus the contractor of record and, for plumbing, the plumber’s 055 and a notarized or sealed letter of intent. Drawings should follow the residential plan review checklist.
  • New homes. $3 per square foot of floor area, a $1,000 application deposit, a spot (location) survey approved before rough inspections and a civil engineering as-built before the final engineering inspection. A tear-down and in-fill build also needs a $5,000 cash escrow before the demolition permit.
  • Fences. $60, or $30 for a short run, with a plat of survey marking the fence in red; fences need no inspections.
  • Sewers and water. The village runs a 50/50 overhead sanitary sewer and private drainage cost share program, and properties in the Mission Brook Sanitary District file that district’s sewer application.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Since the Village Board amended the Annual Fee Ordinance on April 28, 2026, multi-unit residential and non-residential permits use one formula for applications filed on or after July 1, 2026: a $600 application fee plus 1.4% of construction value for projects up to $7 million, or plus 1.2% of construction value for projects above $7 million. Applications filed earlier keep the old schedule, and active permits need no action unless new permits are filed. Commercial submittals also go by email to the permit desk, and fees can be paid by credit card or e-check. Separate commercial permit types cover new buildings, additions, interior and exterior alterations, interior demolition (not needed when an interior alteration permit is filed), parking lot resurfacing and re-striping, signs, telecommunications antennas, commercial water service repairs, mechanical, electrical (including low voltage), plumbing and generators. Application deposits are $1,000 for a new building, $750 for an addition and $100 for an interior alteration. Fire protection permits start at $70 or $10 per 1,000 square feet, with sprinkler, standpipe, fire pump and alarm reviews priced by size. Elevator plan review is $105 and new elevator inspections $220.

What comes before the building permit

  • Zoning. Check the new Zoning Code (in force since September 22, 2025) for setbacks and uses; zoning relief goes to the review bodies the Code names: the Plan Commission, the Zoning Board of Appeals and the Architectural Control Commission.
  • Floodplain. Work in a mapped flood area needs a floodplain development permit under the Zoning Code, which sets the flood protection elevation at the base flood elevation plus 1 foot; lowest floors, basements and building equipment must be at or above it.
  • Stormwater and engineering. Grading and drainage follow the village’s engineering standards, and development disturbing more than half an acre can also need an MWRD Watershed Management Ordinance permit.
  • Right-of-way. Work in the village right-of-way costs $180 plus a $1,000 frontage deposit.

Northbrook permit costs and fees

All fees come from the FY 2027 Annual Fee Ordinance, marked effective July 31, 2026, Chapter 6 (Section 6-9 unless noted); the contractors page gives July 1, 2026 as the start of the new multi-unit and non-residential rates.

Rather talk it over?

Call 1-855-478-4290 →
Northbrook building fees (FY 2027 Annual Fee Ordinance)
WorkFee
New single-unit residence$3 per sq ft of floor area; $1,000 application deposit
Addition or interior alteration$3 per sq ft; $280 minimum; deposit $250 addition, $100 interior
Multi-unit and non-residential$600 + 1.4% of construction value (1.2% when value exceeds $7 million)
Application deposit, basement finishing or detached garage$100 each
Fence$30 under 60 feet; $60 otherwise
Deck; shed; patio or drivewayFrom $70 each
Detached garage; pool or spa$300; $750
Generator; solar$150; $250
Plumbing; water heater; lawn sprinkler$70 minimum; $50; $75
Mechanical; furnace swap; new furnace or AC; boiler$70 minimum; $50; $100; $400
Electrical; service change; panel$70 minimum; $70 for one meter ($30 each extra); $200 one panel
Demolition$750 house; $100 garage or interior; $5,000 tear-down escrow
Re-inspection; after-hours inspection$75 per discipline; $150
Expired permit renewal; change of contractor$250 a month; $250 penalty
Vacant building$200 registration; $500 compliance inspection

Worked examples from the ordinance: a 500-square-foot interior alteration is 500 × $3, or $1,500 in permit and inspection fees, with a $100 application deposit; a $500,000 commercial alteration is $600 plus 1.4% of $500,000, or $7,600. The fence page still quotes the $30 rate for runs under 40 feet; the adopted ordinance says under 60 feet.

Trade permits and who may pull them

Northbrook licenses contractors for one year from the application date. General contractors pay $100, and so do homeowners acting as general contractor on a house they do not live in. Electrical contractors pay $70 and submit their electrician’s registration. Sewer, pavement and sealcoat contractors pay $70; sealcoaters also sign an affidavit agreeing not to use coal tar products. Plumbing contractors pay nothing but submit their State of Illinois 055 registration, and landscapers using mowers, trimmers or blowers need a free annual landscape contractor business license. No village license is required for HVAC, fire protection, fence or sign contractors.

Rather not deal with the building department?

Get a free quote →
  • Plumbing: state-licensed plumbers only (the Illinois Department of Public Health licenses plumbers); a plumbing or water service contractor change needs a new sealed or notarized letter of intent from the person named on the 055.
  • Electrical: registration is required by village code section 6-95.
  • Roofing: re-roofing a house needs no village permit, but roofers still hold the state license from the Illinois Department of Financial and Professional Regulation.
  • Change of contractor: file the change form before the new contractor starts, or pay a $250 penalty per contractor.

How to apply for a Northbrook building permit

1. Check the no-permit list

Confirm the job is not on the village’s exempt list and read its permit type page.

2. Check zoning

Confirm setbacks and uses under the 2025 Zoning Code and whether a board must act first.

3. License the contractors

Each contractor that needs a license files the village application before work.

4. Assemble the package

Forms, worksheets, tree protection agreement and drawings per the residential plan review checklist.

5. Email the permit desk

Send everything to Permits@Northbrook.il.us and answer review comments.

6. Pay online

Pay through the village portal and keep stamped plans on site.

Review, corrections and what causes delay

The village posts a list of common residential plan submission mistakes to read before submitting. Permit revisions need the revision form with three copies of the revised drawings and cost at least $70 per discipline. Issued permits are valid for 18 months; after that an extension is needed, and renewing an expired permit costs $250 a month. Insulation changes must be reported before or at the rough framing inspection.

Inspections and certificates in Northbrook

Call the Permit Coordinator Desk at 847-664-4050 at least 48 hours ahead, with the property address. A re-inspection fee applies to every failed inspection and to any inspection not cancelled at least four hours ahead. The village’s list of common failures includes no approved stamped plans on site, blocked access, work not ready, ungrounded footing rebar, badly bored or notched framing, wrong insulation, missing draft stopping and fire blocking, and inspections called out of order. New homes, multi-family and commercial buildings need an approved spot survey before rough inspections.

A certificate of occupancy follows the final inspections. A temporary certificate costs $250 a month, and for a single-family home it needs a cash deposit or letter of credit of at least $3,000 plus a $100 administration fee. Appeals of a code official’s decision cost $250. Vacant buildings must be registered ($200) and pass a $500 compliance inspection.

Want this handled start to finish?

Get a free quote →

Illinois building code in Northbrook

Northbrook enforces 2018 editions of the building codes with village amendments through Development and Planning Services. FEMA’s Community Status Book lists the Village of Northbrook (community 170132) as participating in the National Flood Insurance Program, with flood maps effective September 18, 2013, and in the Community Rating System at class 6, a 20% discount for policies in mapped flood zones.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Northbrook building permit FAQs

Do I need a permit to re-roof my house in Northbrook?

No. Residential re-roofing with shingles or shakes, siding, soffits and stucco need no permit; roof slope changes and dormers do.

How much is a permit for an addition?

$3 per square foot of floor area with a $280 minimum, plus a $250 application deposit.

What do commercial permits cost?

For applications from July 1, 2026, a $600 application fee plus 1.4% of construction value, or 1.2% of value on projects over $7 million.

Does a shed need a permit?

Not a prefabricated shed of 80 square feet or less, though zoning still applies; larger sheds start at $70.

Does my HVAC contractor need a village license?

No. HVAC, fire protection, fence and sign contractors are exempt; general, electrical, sewer, pavement and sealcoat contractors are licensed.

How long is a permit good for?

18 months from issue; unfinished work then needs an extension, and an expired permit costs $250 a month to renew.

Can I build an accessory dwelling unit?

The 2025 Zoning Code permits attached accessory dwelling units in the R-1 to R-5 single-family districts.

Northbrook permit search and official resources

Under the Zoning Code, certificates of occupancy and floodplain records are kept in the Office of the Village Manager as public records open to inspection under the Illinois Freedom of Information Act. Copies follow the Annual Fee Ordinance: the first 50 black-and-white pages are free. The village also posts its current list of licensed contractors.

Inspections are where schedules slip.

Get a free quote →

Simplify Northbrook permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Northbrook sooner?

Let Alliance prepare, file, and track your Northbrook permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Northbrook permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.