The county says it plainly: Montgomery County does not issue building permits. What it requires is a Structural Improvement Permit, a notice of building construction filed with the Supervisor of Assessments at 1 Courthouse Square, Room 201, Hillsboro (217-532-9595), before any house, garage, barn, shed or commercial building goes up; it is used for assessment and new 911 addresses, and building without it can bring a fine of up to $500 a day. New septic systems and wells need permits from the Montgomery County Health Department, solar farms need a County Board permit, and the cities and villages set their own building rules.
What requires a county permit or notice in Montgomery County?
Montgomery County’s permit picture is short, and each item comes from a different county office:
County filing needed
- Any building construction or improvement, including houses, garages, barns, sheds, storage units and commercial buildings: Structural Improvement Permit notice
- New and renovated private sewage disposal systems: Health Department permit
- Drilling a new water well or sealing an abandoned well: Health Department permit
- Solar farms and solar gardens in unincorporated areas: County Board development permit
- Land divisions under the county Subdivision Ordinance and the Plat Act
Not issued by the county
- Building permits (the county does not issue them)
- County electrical, plumbing or mechanical permits
- Plan review or building inspections for houses
The Structural Improvement Permit form words its scope this way: “All persons shall be required to provide notice of building construction/improvements to real property in Montgomery County,” a term that includes but is not limited to houses, garages, barns, sheds, storage units of any kind and commercial buildings. It says failing to file the notification before construction is an offense punishable by a fine of up to $500 for each day work proceeds, with each day after the structure is finished counted as a separate offense. Its acknowledgement adds that all other city, township, subdivision and state ordinances must still be followed.
What Montgomery County decides and what the state holds
The County Board sets the notice requirement, the subdivision, solar and wind ordinances and the Health Department’s private sewage disposal ordinance. Septic systems are permitted under the Illinois Department of Public Health’s private sewage disposal program together with the county ordinance, and new wells and well sealing are permitted and inspected by the Health Department. Plumbers are licensed by the Illinois Department of Public Health and roofing contractors by the state.
Short on time to read all of this?
Get a free quote →Montgomery County building department: who handles permitting
The Supervisor of Assessments takes Structural Improvement Permit notices, assigns a notification number and, for new structures, starts the new 911 address. The Health Department’s Environmental Health staff permit, evaluate, approve and inspect septic systems and permit wells. The County Board issues solar farm and garden permits after a public hearing, with the County Coordinator’s office answering questions. The GIS office, whose technician is also the county’s Plat Act officer, keeps the parcel map; use it to see whether a property lies inside a city or village.
| Office | Contact |
|---|---|
| Supervisor of Assessments (Structural Improvement Permit) | 1 Courthouse Square, Room 201, Hillsboro, IL 62049; 217-532-9595; assessor@montgomerycountyil.gov |
| Health Department, Environmental Health (septic, wells) | 11191 Illinois Route 185, Hillsboro, IL 62049; 217-532-2001; satellite office 1357 E. Union Ave., Litchfield, 217-324-3430 |
| County Engineer / Highway Department | 11159 IL Route 185, Hillsboro; 217-532-6109; engineer@montgomerycountyil.gov |
| GIS office and Plat Act officer | #1 Old Courthouse Square, Room 305, Hillsboro; 217-532-9580 |
| County Coordinator (solar and wind questions) | 217-532-9577 |
| Municipality | Where to ask about building permits |
|---|---|
| Litchfield (city, pop. 6,598), Hillsboro (city, 6,184), Nokomis (city, 2,133) | City hall; the county issues no building permits there |
| Witt (770), Coffeen (627) (cities) | City hall; the county issues no building permits there |
| Raymond, Taylor Springs, Farmersville, Schram City, Irving, Coalton, Fillmore, Waggoner, Butler, Ohlman, Walshville, Wenonah (villages) | The village clerk; the county issues no building permits there |
| Panama (205 here, 120 in Bond County), Donnellson (145 here, 7 in Bond County), Harvel (117 here, 54 in Christian County) | The village clerk; the county issues no building permits there |
| Unincorporated land | No building permit; Structural Improvement Permit notice plus Health Department septic and well permits |
Montgomery County permit types
Not sure this scope needs a permit?
Get a free quote →Residential permits
- Structural Improvement Permit (notice). A one-page form: tick either “improvement to an existing structure only” or “new structure that will require a new 911 address”, mark whether a septic permit is needed, give the property number, owner, type of construction (commercial, home, outbuilding or other), estimated start date and cost estimate, list the structure details (size, bathrooms, basement, central air, garage, porches), name the road for a new address, and attach a photo of where the driveway will be. The form can be mailed, e-mailed or completed by phone.
- Private sewage disposal permit. Issued to the owner and the licensed septic installer before construction of any new or renovated system; installers register with the Health Department on its private sewage contractor registration form.
- Well permits. Required for drilling a new water well and for sealing an abandoned one; staff visit the site to inspect.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial buildings file the same Structural Improvement Permit notice. Solar farms and solar gardens in unincorporated areas need a development permit from the County Board under the solar ordinance adopted April 10, 2018 and last revised March 10, 2026; ground-mounted developments covering more than 5 acres count as solar farms. The ordinance requires a detailed site plan, UL-listed components and an interconnection agreement with the utility, limits arrays to 30 feet in height, and sets farm setbacks of 50 feet from property lines and public road rights-of-way and 150 feet from homes (neighbors may sign a waiver). The ordinance covers unincorporated areas other than those around municipal limits governed by municipal ordinance. Food businesses need a Health Department food permit.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building
- Address and driveway. New structures get a new 911 address through the notice, which asks for the road name and a driveway photo.
- Septic site. Tick the septic box on the notice and apply to the Health Department before construction.
- Plats. Land divisions follow the county Subdivision Ordinance, with the GIS technician acting as Plat Act officer.
- Flood maps. FEMA lists unincorporated Montgomery County in the flood insurance program on an emergency-program basis with a 1981 flood hazard boundary map.
Rather talk it over?
Call 1-855-478-4290 →Montgomery County permit fees
The Structural Improvement Permit form and its instructions show no filing fee, and the Health Department’s posted septic application shows none either; ask Environmental Health for current septic and well permit charges. The fees the county does publish are in its solar ordinance:
| Item | Fee |
|---|---|
| Structural Improvement Permit notice | No fee shown on the form |
| Building without filing the notice | Fine up to $500 per day |
| Solar farm or garden application | $5,000 per MW of nameplate capacity, up to $125,000, non-refundable |
| County costs above the solar application fee | Billed to the applicant, due within 15 days |
| Solar permit extension (up to two years) | $250 per MW |
| Solar development without approval | $1,000 first violation, $500 per additional month |
| Water test for a new well | No lab fee |
Worked example. A 4 MW solar garden pays 4 × $5,000 = $20,000 when it applies; a 30 MW solar farm would reach the $125,000 cap (30 × $5,000 = $150,000, capped). A permit that has not started construction within five years lapses unless the County Board grants an extension, which for the 4 MW project costs 4 × $250 = $1,000.
Trade permits and who may pull them
Montgomery County runs no electrical, plumbing or mechanical permit program and lists no county contractor registration for builders. The one county trade rule on its pages is for septic work: the private sewage disposal permit is issued to both the owner and a licensed septic installer, and installers file a private sewage contractor registration application with the Health Department. Plumbing in Illinois follows the state plumbing code and is done by plumbers licensed through the Illinois Department of Public Health, and roofing contractors need a state license. Litchfield, Hillsboro and the other municipalities set their own electrical and contractor rules; ask city hall.
Rather not deal with the Montgomery County building department?
Get a free quote →How to file in Montgomery County
Use the county GIS map; city and village parcels follow that municipality’s permit rules.
For a rural site, apply to the Health Department before construction; the septic permit goes to the owner and a licensed installer.
Fill in the form, tick the septic box if needed, and attach a driveway photo for a new address.
Return it to the Supervisor of Assessments by mail, e-mail or in person, or complete it by phone.
The office assigns it once the notice is processed.
City, township, subdivision and state ordinances still apply.
Review, corrections and what causes delay
There is no plan review for the notice itself, but the septic permit must be issued before the system is built, and Environmental Health staff evaluate and approve each system. Solar projects take longest: the County Board must hold a public hearing within 60 days, after notice published in a newspaper at least once a week for two weeks and mailed by the applicant to affected owners, and must decide within 30 days of the hearing. Unpaid application fees stop any decision.
Inspections in Montgomery County
With no county building permit, the county’s pages describe no building-code inspections of houses or other buildings. Its inspections are environmental: Health Department personnel evaluate, approve and inspect private sewage disposal systems, and they visit well drilling and well sealing sites. Free water test kits are available for private wells, with no lab fee when a new well is tested, when an infant lives in the home or for medical reasons. For solar developments, the County Board may require a final site inspection before the facility may operate, and an emergency contact must be posted at the access point. Inside the cities and villages, inspections follow the municipality’s own program.
Building codes and flood maps in Montgomery County
Because the county issues no building permits, its pages show no county building-code review for unincorporated areas; its posted ordinances cover subdivisions, solar, wind, fireworks, animal control and responsible bidding. Each city and village decides its own codes. FEMA’s Community Status Book lists Montgomery County (community 170992, unincorporated areas) as a participating community that joined on February 3, 2000 under the emergency program, with a flood hazard boundary map dated January 9, 1981 and no flood insurance rate map listed.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Montgomery County permit FAQs
Does Montgomery County issue building permits?
No. The county says it does not issue building permits; it requires a Structural Improvement Permit notice for assessment purposes.
Is there a fee for the Structural Improvement Permit?
No fee is shown on the form, but building without filing it can bring a fine of up to $500 a day.
How do I get a new 911 address?
Tick “new structure” on the Structural Improvement Permit, name the road and attach a photo of the driveway location.
Who issues septic permits?
The Montgomery County Health Department in Hillsboro (217-532-2001), to the owner and a licensed septic installer, before construction.
Do I need a permit to drill or seal a well?
Yes. The Health Department issues permits for new wells and for sealing abandoned wells and inspects the sites.
How much is a solar farm permit?
$5,000 per megawatt of nameplate capacity, up to $125,000, paid by certified check before the application is processed.
What about building in Litchfield or Hillsboro?
Not the county, which issues no building permits anywhere; ask the city hall about its own rules. The county’s notice form applies to “building construction/improvements to real property in Montgomery County” and names no exception for cities or villages, so ask the Supervisor of Assessments whether you must also file it.
Montgomery County permit records and official resources
Structural Improvement Permit notices are held by the Supervisor of Assessments, septic and well records by the Health Department, and plats by the GIS office. For other records, the county’s Freedom of Information Officer can be reached at 217-532-9551, and County Board agendas and minutes are posted online.
Inspections are where schedules slip.
Get a free quote →- Supervisor of Assessments and permit FAQ
- Structural Improvement Permit form
- Structural Improvement Permit instructions
- Health Department environmental health: septic and wells
- Private sewage disposal permit application
- Montgomery County Health Department
- County ordinances
- Solar farm and solar garden ordinance
- County Engineer
- GIS office and parcel map
- County Board agendas and minutes
- FOIA and public filings
- FEMA Community Status Book, Illinois
Simplify Montgomery County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Montgomery County sooner?
Let Alliance prepare, file, and track your Montgomery County permits while your crew stays on the job.
More Illinois permitting guides
Macoupin County
Read guide →Taylorville
Read guide →Bond County
Read guide →Morgan County Building Permit Guide
Read guide →Morris Building Permit Guide
Read guide →Morton Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Montgomery County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.