Inside Morton, permits come from the Village of Morton Zoning and Code Enforcement Department at Village Hall, 120 N. Main Street (309-266-5361). Forms can be returned in person, by mail or by email, and some permits can be filed on the village’s online portal. Building permits are priced by valuation, starting at $35, with flat $50 permits for decks, fences, sheds and patios. Electricians need a village certification; general and HVAC contractors need no local license.
What requires a building permit in Morton?
Morton publishes both a list of projects that need a permit and a list that do not. Replacing an existing fence, patio, pergola, play structure, deck, gazebo or storage building needs a permit, and so does adding on to one.
Permit needed
- New buildings and additions, residential or commercial
- Decks, patios, pergolas, gazebos, play structures and storage buildings
- Detached garages (only one garage per dwelling unit is allowed)
- Fences, driveways, approaches, curbs and parking-lot paving
- Foundation repair that needs excavation outside the building
- Egress windows, structural changes, demolition and murals
- Electrical work over $1,000 or any service change
- Plumbing that adds fixtures or moves one any distance
- Permanent pools, solar systems, natural gas generators and signs
No permit
- Replacing windows, doors or siding
- Replacing or repairing roof shingles
- Repairs to a fence, storage building, pergola or deck
- Replacing a sidewalk on private property
- HVAC repairs or replacements
- Non-structural interior walls, such as finishing a basement
- Resetting plumbing fixtures in the same place
Temporary pools need no permit at all when they are on or above ground, have non-metal, molded or inflatable walls, a factory ground-fault cord, at least 22.5 feet of clearance from overhead wires, sit in the rear yard and meet the fence rule in section 10-5-3 (L) of the code. A temporary pool without a factory ground-fault cord, or with metal parts, needs only a $100 electrical permit.
What Morton decides and what the state holds
The village adopts its own codes and amendments, including local electrical rules (Type S fuses where there is no breaker panel, no aluminum wire of No. 10 or smaller, and the service overcurrent device within 8 feet of the meter), and its own design values: a 40-inch frost depth, 20 psf ground snow load and 107 mph wind speed. Its 2026 code sheet notes that under Public Act 103-0510 any stricter structural provision of the 2024 IBC or IRC controls over the 2021 text. The state supplies the plumbing code and plumber licensing, roofing contractor licensing, and the energy and accessibility codes.
Short on time to read all of this?
Get a free quote →Morton building department: who handles permitting
The Zoning and Code Enforcement Department, part of Planning & Community Development, issues Morton’s permits. Its head, Zoning & Code Enforcement Officer Zack Davis, administers the zoning ordinance, supports the Plan Commission and Zoning Board of Appeals, enforces the building codes, reviews plats and computes development fees. Land outside the village is permitted by Tazewell County Community Development (see the Tazewell County guide).
| Detail | Information |
|---|---|
| Office | Zoning & Code Enforcement Department, Village Hall, 120 N. Main St., Morton, IL 61550 |
| Phone | 309-266-5361 (Zoning & Code Enforcement Officer ext. 2239) |
| Fax | 309-266-5508 |
| zoning@morton-il.gov | |
| Outside village limits | Tazewell County Community Development |
Morton permit types
Each project on the village’s list has its own fillable form or guideline brochure with a permit form attached. Forms can be returned in person, by mail or by email; the permit is emailed back once the application and required information are reviewed, with payment instructions if the fee was not paid up front. Zoning, accessory building, electrical and plumbing permits can also be filed on the village’s online portal, linked from its Electronic Permit Applications page.
Residential permits
- New homes (R-1 and R-2). One full set of scaled plans (at least 11 by 17 inches, 1/4 inch to the foot) with foundation and floor plans, all four elevations and wall sections; a site plan showing the house, drive, walks, patios, decks, gas meter and air conditioner (no closer than 12 feet to a side line); a grading plan with silt fence and a stabilized construction entrance; a natural gas service application; and a REScheck report. Electrical and plumbing permits are taken out at the same time.
- Additions. A separate residential addition application is used, with the natural gas service application attached.
- Accessory structures. Decks, fences, gazebos, patios, pergolas, play structures and storage buildings each have a guideline brochure with the permit form; the fee list sets $50 for decks, fences, gazebos, patios, pergolas and storage buildings.
- Natural gas generators. The village’s gas generator form comes first, to see whether the gas service must be upgraded; after the upgrade is paid, a licensed electrician takes out the electrical permit.
Building or remodeling a home here? Alliance handles residential permit expediting, so the crew isn't waiting on the counter.
Commercial permits
Commercial and R-3/R-4 projects use their own new construction application, need a $300 site plan review for new construction outside the R-1 and R-2 districts, and pay fire plan review fees. A business that is newly established at a location, has changed ownership or has never held one needs a village Zoning Permit, applied for on the village’s form and reviewed before a representative calls back, and commercial projects may qualify for Enterprise Zone benefits.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit applications through issuance. More on this: commercial building permits explained.
What comes before the building permit
- One Stop Shop. A free meeting with Public Works (stormwater, gas, wastewater and water), the Fire Department and Zoning, booked through the Zoning & Code Enforcement Officer.
- Zoning approvals. Variances, special uses and zoning amendments are public-hearing items ($175 each), filed on the village’s variance or zoning amendment petition; the department staffs the Plan Commission and the Zoning Board of Appeals. Home occupations need a permit under section 10-13-4.
- Lot lines and utilities. The village does not survey lots; lot dimensions are on the Tazewell County GIS viewer or available from the department, and every dig starts with a JULIE locate.
- Subdivision fees. Lots in Trails at Timber Oaks and Wolf Crossing carry utility infrastructure and North Main improvement fees at building permit.
Morton permit costs and fees
Fees come from the village’s permit fee list; building permits not on the flat-fee list are priced by valuation, and electrical fees come from the electrical permit form updated in June 2026.
| Item | Fee |
|---|---|
| Building permit, valuation up to $1,000 / $1,000.01 to $5,000 | $35 / $50 |
| Valuation $5,000.01 to $50,000 | $50 plus $3.50 per $1,000 over $5,000 |
| Valuation $50,000.01 to $100,000 | $207.50 plus $2.50 per $1,000 over $50,000 |
| Valuation $100,000.01 to $500,000 | $332.50 plus $2.00 per $1,000 over $100,000 |
| Valuation over $500,000 | $1,132.50 plus $1.50 per $1,000 over $500,000 |
| Accessory structure (deck, fence, gazebo, patio, pergola, storage building) | $50 |
| Above-ground pool / in-ground pool | $50 / $200 |
| Roof- or ground-mount solar | $150 plus $100 electrical |
| Sign | $50 ($25 in the Enterprise Zone) |
| Sanitary or storm sewer tap | $50 |
| Site plan review, new construction outside R-1 and R-2 | $300 |
| Electrical: single-family home / duplex per unit / addition or remodel | $400 / $400 / $200 |
| Electrical: service change, generator, hot tub, temporary pool | $100 each |
| Electrical: permanent pool | $200 |
| Life safety plan review; fire alarm plan review | $275; $275 |
| Sprinkler or standpipe plan review | $275 (1 to 199 heads) / $400 (200 or more) |
| Variance, special use or zoning amendment | $175 |
| Plats | $150 plus $15 per lot on the final plat |
| Excavation | $300 or $60 per square yard, whichever is greater |
Rather talk it over?
Call 1-855-478-4290 →Worked examples from the schedule: a $25,000 project pays $50 plus 20 × $3.50, or $120. A new house valued at $300,000 pays $332.50 plus 200 × $2.00, or $732.50, for the building permit and $400 for the electrical permit. Commercial electrical permits run from $100 to $500 by job value, plus $2 per $1,000 above $20,001.
Trade permits and who may pull them
Morton spells out its contractor rules. General, HVAC and excavating contractors need no local registration or license; roofing contractors must hold an Illinois roofing license and plumbing contractors an Illinois plumbing license; electrical contractors need a village Electrical Contractor Certification and sewer contractors a village Sewer Contractor Certification, each $100 for the calendar year.
- Electrical: certification requires a current electrical contractor license from Peoria, Bloomington, Springfield, Decatur, Pekin, Ottawa, Joliet or another Illinois testing community the village verifies; it runs January 1 to December 31 and is not prorated. A property owner doing all the work on their own residence needs no certification but still needs the permit for a service change or work worth $1,000 or more. Electrical permits last up to 18 months or until the final inspection, are not assignable, and follow the 2023 National Electrical Code (the department page still lists the 2021 edition).
- Plumbing: an owner may do plumbing on their own property in a residential district; all commercial plumbing must be done by an Illinois-licensed plumber under the Illinois Plumbing Code. Plumbing permits also last up to 18 months. Plumbers are licensed by the Illinois Department of Public Health.
- Gas: the village supplies natural gas, so new homes and generators file its gas service application; for a generator, any work on customer-owned gas piping needs a plumbing contractor.
Rather not deal with the building department?
Get a free quote →How to apply for a Morton building permit
Make sure the property is inside the village; unincorporated land goes to Tazewell County.
Book the free One Stop Shop meeting at 309-266-5361, ext. 2239, to hear from Public Works, Fire and Zoning together.
Choose the form or brochure for the project on the Permits and Licenses page, or file online for zoning, accessory, electrical or plumbing permits.
Add the site plan, construction plans, grading plan and REScheck the form lists.
Return everything in person at 120 N. Main St., by mail or by email to the department.
The permit is emailed to you, with payment instructions if the fee is still due.
Review, corrections and what causes delay
The village does not publish a review time; the permit is issued once the form and every required document have been received and reviewed. Its One Stop Shop flyer warns that applicants are responsible for preparing complete, accurate applications, site plans and documents, and that missing items may delay approval. Projects needing a variance, special use or rezoning wait for a hearing, and new commercial sites need the site plan review first.
Inspections and occupancy in Morton
Inspection requirements, fees and scheduling are set when each permit is issued; for a new home the village provides the list of required inspections and the inspectors’ contacts. For new homes, every inspection must be requested from the right inspector with at least 48 hours’ notice, and the permit holder is responsible for arranging electrical inspections.
A new home’s certificate of occupancy requires the water meter correctly installed, all exterior work and site grading finished, the gas meter and service in place (with the riser not enclosed by pavement), and passed final building, plumbing and electrical inspections; a blower door test must be performed before the final certificate is issued. Projects that went through site plan review also need any required water meter bypass and backflow devices installed and tested.
Illinois building code in Morton
Morton’s 2026 adopted code sheet lists the 2021 International Building, Residential, Existing Building, Mechanical and Fuel Gas Codes, the 2024 International Fire Code, the 2021 Life Safety Code, the 2023 National Electrical Code, the 2024 Illinois Energy Conservation Code with Capital Development Board amendments, the 2021 International Property Maintenance Code, and the state plumbing and accessibility codes. FEMA’s Community Status Book lists the Village of Morton (community 170652) as participating in the National Flood Insurance Program, with a current flood map dated July 21, 2026, and no Community Rating System class.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Morton building permit FAQs
How much is a building permit in Morton?
It depends on valuation: $35 up to $1,000, $50 to $5,000, then $50 plus $3.50 per $1,000 over $5,000, with lower rates on larger projects. Decks, fences, sheds and patios are a flat $50.
Do I need a permit to replace my roof, windows or siding?
No. Replacing shingles, windows, doors or siding needs no permit in Morton.
Do I need a permit to finish my basement?
No building permit if the new walls are non-structural, but electrical or plumbing permits may still be needed.
Can I do my own electrical or plumbing work?
Yes, on your own residence. Owners need no electrician certification, but a permit is required for service changes or electrical work of $1,000 or more, and for plumbing that adds or moves fixtures.
Does a contractor need a Morton license?
Only electricians and sewer contractors, who need a $100 village certification. General, HVAC and excavating contractors need none; roofers and plumbers need state licenses.
Do I need a permit to replace a fence or deck?
Yes. Replacing or adding on to a fence, deck, patio, pergola, gazebo, play structure or storage building needs a permit ($50 for most of them); repairs and maintenance do not.
Can I build a second garage?
No. The code allows one garage per dwelling unit, attached or detached, though an existing garage may be enlarged if setbacks are met.
What does a pool permit cost?
$200 plus a $200 electrical permit for an in-ground pool; above-ground permanent pools pay a $50 pool permit plus the $200 electrical fee.
Morton permit records and official resources
Permit and inspection records are village records. Requests to inspect or copy them go through the village’s online FOIA portal or by email to the Village Administrator; police records are handled separately at the Police Department, 375 W. Birchwood.
Inspections are where schedules slip.
Get a free quote →- Morton permits and licenses
- Electronic permit applications
- Planning & Community Development
- Residential R-1/R-2 new construction application (2026)
- Electrical permit form and adopted codes (2026)
- Electrical contractor certification application
- One Stop Shop guide
- Freedom of Information Act requests
- FEMA Community Status Book, Illinois
- Illinois Department of Public Health plumbing
Simplify Morton permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Morton sooner?
Let Alliance prepare, file, and track your Morton permits while your crew stays on the job.
More Illinois permitting guides
Tazewell County
Read guide →Pekin
Read guide →Washington
Read guide →Morton Grove Building Permit Guide
Read guide →Moultrie County Building Permit Guide
Read guide →Mount Prospect Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Morton permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.