Washington, Illinois Building Permit Guide

To get a building permit in Washington, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

In Washington, Illinois, the city’s Planning & Development Department issues building permits at City Hall, 301 Walnut Street, and most permits are issued while you wait.

Authority: City of Washington Planning & DevelopmentOffice: City Hall, 301 Walnut St.Phone: 309-444-1122
Permit office
Planning & DevelopmentCity Hall, 301 Walnut St., Washington, IL 61571
Review
Same visitNew construction up to 48 hours
Permit life
6 monthsRenewable while work continues
New home utilities
$4,732Water and sewer connection, 2025 schedule

Inside the City of Washington in Tazewell County, building permits for all structural improvements come from the city’s Planning & Development Department at City Hall, 301 Walnut Street (Building Division 309-444-1122, weekdays 8 a.m. to 5 p.m.). Most permits are issued during your visit, new construction can take up to 48 hours to review, and permits last six months with an option to renew. A new home also pays a $4,732 water and sewer connection fee at permit.

What requires a building permit in Washington?

The city requires a building permit for all structural improvements to buildings or property inside the city limits, and its Building and Zoning page sorts common projects into two lists. If a project is not on either list, the city asks owners to call the Building & Zoning office.

Permit needed

  • New home or business construction and building additions
  • Water or sewer service work
  • Truss or other structural support work
  • Garages, sheds and carports
  • Porches and decks
  • Fences and streetside driveway approaches
  • Permanent swimming pools
  • Signs and solar panels
  • Satellite dishes in a front or side yard or on the roof
  • Telecommunication towers and radio antennas

No permit

  • Non-structural roofing
  • Siding or guttering
  • Window or door installation
  • Non-structural interior remodeling
  • Swing sets and jungle gyms
  • Patios or walkways at grade, and sport courts
  • Rear-yard satellite dishes (size limits apply)
  • Non-streetside driveway replacement
  • Inflatable or temporary pools, flagpoles and mailboxes

Separate city approvals cover demolition, home occupations, landscaping plans, street cuts, right-of-way work, temporarily exceeding a street load limit, certificates of occupancy, and work on historic landmarks or in historic districts.

What Washington decides and what the state holds

The city adopts its own codes: its Building and Zoning page lists the 2018 International Building, Residential and Mechanical Codes, the current National Electrical Code (the electrical permit form specifies the 2023 edition), the current Illinois Plumbing Code and the 2015 edition of the NFPA 101 Life Safety Code, with copies available to view at City Hall. It also sets its own zoning, subdivision, fence, floodplain and historic preservation rules and its own electrician licensing requirement. The state supplies the plumbing code and plumber licensing, roofing contractor licensing, and the energy and accessibility codes.

Washington building department: who handles permitting

The Planning & Development Department, directed by Planning & Development Director Jon Oliphant, issues building permits and handles new construction inspections, code enforcement, floodplain management, historic preservation, GIS mapping, annexation and Enterprise Zone and TIF administration. The city’s permit forms come from its Building Division. The department staffs the City Council, the Planning and Zoning Commission, the Historic Preservation Commission, the Economic Development Commission and the Building Board of Review.

Short on time to read all of this?

Get a free quote →
Washington permit contacts
DetailInformation
OfficePlanning & Development Department, City Hall, 301 Walnut St., Washington, IL 61571
Building Division309-444-1122
Department director309-444-1135
Fax309-444-9779
HoursMonday to Friday, 8 a.m. to 5 p.m.
Outside city limitsTazewell County Community Development (see the Tazewell County guide)

Washington permit types

Washington uses printable application forms, posted in the department’s forms list and filed at City Hall; most permits are issued on the spot.

Residential permits

  • Additions and accessory buildings. The residential addition and accessory application asks for a site plan and construction plans, the owner, contractor, a licensed electrician and a licensed plumber, the gross square footage of each element (addition, basement, garage, porch, deck, shed, pool), building height, foundation and framing type, and stair rise and run (7 3/4 inches maximum rise, 10 inches minimum run). Staff check lot coverage, floor area ratio, floodplain and setbacks, including 10 feet between structures.
  • Fences. On interior lots, front-yard fences must be ornamental and no taller than 48 inches. A corner lot may have a fence up to 6 feet in the front yard the house does not face, set back at least 10 feet or half that yard’s depth, whichever is greater. Side and rear fences may be 6 feet tall. Fences may go in utility easements at the owner’s risk but never in a surface drainage easement or the 100-year floodplain.
  • Pools. Permanent pools stay 5 feet from rear and side lot lines and need a barrier at least 48 inches tall under the 2018 International Residential Code, with no opening a 4-inch sphere can pass, no more than 2 inches of clearance at the bottom over grass or gravel, and chain link mesh no larger than 1 1/4 inches unless slatted.
  • Solar. Separate roof-mount and ground-mount solar applications are used, and the installer must be a licensed electrician.

Commercial permits

New business construction needs a building permit, with up to 48 hours of review before issue. The department also handles site plan and subdivision plat review, landscaping plan approval, signs (including banners, billboards and portable signs) and wireless towers, and non-residential water and sewer connections are charged by water meter size. The forms list includes a business registration application and a short-term rental certificate of registration.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Zoning. The Planning and Zoning Commission is the hearing body for rezoning and special use petitions and recommends to the City Council; it can grant variations only where the code causes practical difficulty or hardship the owner did not create, and it also hears appeals of the zoning code’s application. It meets the first Wednesday of each month at 6:30 p.m. at Five Points Washington.
  • Home occupations. Home occupations are governed by section 154.301 of the zoning code, and section 154.306 decides whether a home occupation can be approved administratively or must go to the Commission.
  • Historic preservation. Work on a landmark or in a historic district needs a certificate of appropriateness from the Historic Preservation Commission; the city also posts applications to designate a landmark or a district.
  • Right-of-way. Work in the right-of-way needs a $10 right-of-way permit filed with the Code Official at least 24 hours before new construction starts, or as soon as possible for repairs, with a bond where required.
  • Floodplain. The department is the city’s floodplain manager; the addition and accessory application asks whether the lot is in the floodplain, and fences are barred from the 100-year floodplain altogether.
  • Subdivisions. Plats go through site plan and subdivision review, and the subdivision development fee is paid when the final plat is approved.

Washington permit costs and fees

The city’s pages do not post a building permit fee schedule; ask the Building Division at 309-444-1122 for the building permit fee. Its forms and its January 1, 2025 fee schedule print the following charges.

Washington fees on city forms and the 2025 fee schedule
ItemFee
Electrical permit$65; $65 for each additional re-inspection
Right-of-way permit (Ordinance 1587)$10
Utility connection, residential (paid at building permit)$4,732 per dwelling unit ($415 water + $4,317 sewer)
Water connection, non-residential: 3/4 / 1 / 1 1/2 / 2-inch meter$620 / $1,035 / $2,070 / $3,310
Sewer connection, non-residential: 3/4 / 1 / 1 1/2 / 2-inch meter$6,477.50 / $10,795 / $21,590 / $34,544
Subdivision development fee, residential (paid at final plat)$2,285 per dwelling unit
Subdivision development fee, non-residential$6,815 per acre

Rather talk it over?

Call 1-855-478-4290 →

Worked example from the schedule: a new single-family home pays a $4,732 utility connection fee at building permit, plus $65 for its electrical permit. The subdivision development fee rises every January 1 by 3.5% or the rate of inflation, whichever is greater (section 50.53), so the 2025 figures above are the posted baseline; the residential figure splits evenly into $1,142.50 for the water distribution system and $1,142.50 for sanitary sewer collection, and the per-acre figure into $3,407.50 each. In the Enterprise Zone, non-residential connection fees are cut by 50%, but not below the residential rate. A business outside the Enterprise Zone connecting through a 1-inch meter pays $1,035 for water and $10,795 for sewer, $11,830 in all; inside the zone the same connection is halved to $5,915, which is still above the $4,732 residential rate.

Trade permits and who may pull them

Washington requires a current license for any electrician working in the city. An electrician qualifies by submitting a current license from Peoria, Bloomington, Springfield, Decatur, Pekin, Ottawa or Joliet, or from another Illinois testing community once the city verifies it. All electrical work must meet the 2023 National Electrical Code, and roof- or ground-mount solar systems must be installed by a licensed electrician.

  • Electrical: the electrical upgrade application costs $65, and the permit holder must call the city to arrange each required inspection; every additional re-inspection costs another $65, paid before it is done.
  • Plumbing: the city’s forms require a licensed plumber; plumbers are licensed by the Illinois Department of Public Health under the Illinois Plumbing Code. Water and sewer service work needs a building permit.
  • Mechanical: the 2018 International Mechanical Code applies.
  • Roofing: non-structural roofing needs no city permit, but roofing contractors still hold a state license from the Illinois Department of Financial and Professional Regulation.

The city’s pages describe no separate local registration for general contractors; the application simply asks who the contractor is.

Rather not deal with the building department?

Get a free quote →

How to apply for a Washington building permit

1. Confirm the location

Make sure the property is inside the City of Washington; unincorporated land is handled by Tazewell County.

2. Check zoning and history

Ask whether the lot is in a historic district, the floodplain or needs a variance, special use or rezoning first.

3. Fill in the form

Download the matching form: addition or accessory, fence, solar, electrical or right-of-way.

4. Attach plans

Add a site plan with setbacks and easements and, for buildings, construction plans.

5. File at City Hall

Bring the application to the Planning & Development Department, 301 Walnut St., weekdays 8 a.m. to 5 p.m.

6. Pay and start

Most permits are issued during the visit; new construction may take up to 48 hours. The permit runs six months and can be renewed if construction continues.

Review, corrections and what causes delay

Simple permits are usually issued while you wait, and complicated projects such as new construction take up to 48 hours to review. Delays come from projects that need a Planning and Zoning Commission hearing first, from historic district work that needs a certificate of appropriateness, and from electricians whose license the city has not yet accepted. A permit expires after six months, and the city renews it if construction is still under way.

Inspections and occupancy in Washington

The department carries out new construction inspections and issues certificates of occupancy. For electrical work, the permit holder must call the city to arrange each required inspection, and every re-inspection costs $65, paid before it takes place. Call the Building Division at 309-444-1122 to schedule.

Code violations, including zoning, subdivision, building and nuisance cases, can be heard through the administrative adjudication process the City Council created with Ordinance 3524 on March 18, 2024, in which a hearing officer decides cases arising under the City Code.

Illinois building code in Washington

Washington enforces the 2018 International Building, Residential and Mechanical Codes, the current National Electrical Code (2023 on the electrical form), the current Illinois Plumbing Code and the 2015 NFPA 101 Life Safety Code. FEMA’s Community Status Book lists the City of Washington (community 170655, Tazewell County) as participating in the National Flood Insurance Program, with a current flood map dated February 17, 2017, and no Community Rating System class; the city’s Planning & Development Department handles floodplain management.

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Want this handled start to finish?

Get a free quote →

Washington, IL building permit FAQs

How long does a building permit take in Washington?

Most permits are issued during your visit. Complicated projects such as new construction need up to 48 hours of review.

How long is a permit good for?

Six months, with an option to renew if construction is continuing.

Do I need a permit for a new roof, siding or windows?

No, as long as the roofing is non-structural. Siding, guttering and window or door installation need no permit.

Do I need a permit for a shed or deck?

Yes. Garages, sheds, carports, porches and decks all need a building permit; patios and walkways at grade do not.

What does it cost to connect a new house to city water and sewer?

$4,732 per dwelling unit on the January 1, 2025 schedule: $415 for water and $4,317 for sewer, paid at building permit.

Who can do electrical work in Washington?

A licensed electrician holding a current license from Peoria, Bloomington, Springfield, Decatur, Pekin, Ottawa, Joliet or another Illinois testing community the city accepts.

Do I need a permit for a driveway?

A streetside driveway approach needs a permit, and work in the right-of-way needs a $10 right-of-way permit; replacing a driveway away from the street does not.

How tall can my fence be?

6 feet in side and rear yards; front-yard fences on interior lots must be ornamental and no taller than 48 inches.

Washington permit records and official resources

Permit and inspection records for Washington addresses are kept by the Planning & Development Department at City Hall, which processes the city’s building permits and certificates of occupancy; ask the Building Division at 309-444-1122 about a past permit, or call the department’s director line, 309-444-1135, weekdays from 8 a.m. to 5 p.m. Planning and Zoning Commission agendas and approved minutes, which record rezoning, special use and variance decisions, are posted on the Commission’s page, and code enforcement cases decided by the hearing officer are explained on the code enforcement page.

Inspections are where schedules slip.

Get a free quote →

Simplify Washington permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Washington sooner?

Let Alliance prepare, file, and track your Washington permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Washington permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.