On unincorporated land in Washington County, the county’s Zoning Administrator issues the building permit for every new structure, addition or alteration, and the county stresses that agricultural buildings need one too. The office is in the old jail building at 125 W. St. Louis St., Nashville (618-327-4800 ext. 345, weekdays 8 a.m. to 4 p.m.) and takes applications online. The fee is $100 for a structure of 150 square feet or more, nothing for smaller ones or for agriculturally exempt farm buildings, and towns with their own zoning issue their own permits.
What requires a permit in unincorporated Washington County?
The county’s Revised Zoning Ordinance, adopted May 12, 2009, applies everywhere in the county except inside municipalities that have adopted their own zoning. Under Section 3-2, no lot may be created, no land developed, no new use or structure established, and no existing structure enlarged, altered, relocated or reconstructed until the Zoning Administrator issues an initial certificate of zoning compliance, the document the county’s pages call a building permit.
Permit with a fee
- Houses, garages and other structures of 150 square feet or more ($100)
- New houses and mobile homes in the Agricultural District, including homes for farm workers
- Additions to houses in the Agricultural District above the Attachment B threshold
- Telecommunication towers, priced per vertical foot
- Wind and solar farms, priced per megawatt
Permit, but no fee
- Structures under 150 square feet
- Buildings used solely for agriculture, with a Certificate of Agricultural Exemption
The county’s two official statements on farm buildings read differently. Section 4-13 of the 2009 ordinance says the county will not impose regulations or require permits for buildings used solely for agriculture, apart from the district’s setbacks, and that to claim this exemption the owner must prove ownership of at least 40 acres and complete a Certificate of Agricultural Exemption at the Zoning Office. The zoning page now states that all construction in the county, agricultural buildings included, requires a building permit, and the fee schedule charges nothing for ag-exempt buildings. In practice, a farm building goes through the Zoning Office either way, at no fee. If the land or building stops being used solely for agriculture, the rest of the ordinance applies.
What the county decides and what the state holds
The county board sets zoning districts, lot sizes, permit fees and the wind, solar and energy-storage rules; it revised all three energy ordinances on July 14, 2026. The farm exemption is the ordinance’s own Section 4-13, and private sewage systems are built under the state Private Sewage Disposal Licensing Act and code, Illinois EPA rules and the county’s own private sewage ordinance. Plumbing follows the Illinois Plumbing Code with state-licensed plumbers, and roofers hold a state license.
Short on time to read all of this?
Get a free quote →Washington County building department: who handles permitting
The Zoning Administrator, Krystal Althoff, runs the county zoning office, reviews applications for initial and final certificates of zoning compliance, inspects sites and forwards special uses, variances, appeals and rezonings to the Zoning Board of Appeals. The office also tells the 911 office and the Supervisor of Assessments about every new building.
| Office | Contact |
|---|---|
| Zoning (building permits, zoning) | Old jail building, 125 W. St. Louis St., Nashville, IL 62263; 618-327-4800 ext. 345; Monday to Friday, 8 a.m. to 4 p.m. |
| Health Department (private sewage) | 177 S. Washington St., Nashville; 618-327-3644, fax 618-327-4229; Monday to Friday, 8 a.m. to 4 p.m. |
| 911 / Addressing Office | P.O. Box 214, Nashville; 618-327-4800 ext. 360; Monday to Friday, 8 a.m. to 4 p.m. |
| Highway Department | 1243 W. Adams St., Nashville; 618-327-4800 ext. 350, garage 618-327-3842 |
Cities and villages in Washington County
The county lists 13 cities and villages: Nashville (population 3,011), Okawville (1,343), Irvington (566), Hoyleton (502), Ashley (449), Addieville (256), Richview (232), Oakdale (197), Radom (183), Du Bois (180), New Minden (166), Venedy (125) and the Washington County part of Wamac (116); seven residents of Centralia also live in the county. The 911 office tells new builders to get a building permit from either the city or village or from county zoning, and the county ordinance does not reach inside any municipality that has adopted its own zoning, so start with the town hall for a lot inside a town. Nashville also handles subdivision review for land within 1½ miles of its limits, according to the county’s parcel-division flyer.
Washington County permit types
An application for an initial certificate of zoning compliance gives the applicant and owner, a short description of the project, its location and relationship to neighboring lots, the site’s area and dimensions, the structure’s height and setbacks, the number and size of any dwelling units, parking and access, and existing or proposed utilities; for a mobile home, documents showing its age and photos of its condition. The Zoning Administrator decides which items a project needs.
Residential permits
- Lot size first: the three common districts require 40 acres in the Agricultural District, 2 acres in R-1 Rural Residential and 1 acre in R-2 Urban Residential. A smaller lot split from farmland usually has to be rezoned before a house can be permitted, unless it is a homesite that has existed since 1980, a lot created before zoning in 1980, or the builder is agriculturally exempt.
- One dwelling per lot: outside multi-family complexes, mobile home parks and farm residences, only one dwelling may sit on a lot, so a mobile home cannot generally be added to a lot that already has a house.
- Accessory buildings: up to 15 feet tall in residential districts and 25 feet in other districts, with no height limit in the Agricultural District; none in a front yard, and at least 7 feet from side and rear lot lines in residential and neighborhood business districts, or 25 feet in the Agricultural District.
Not sure this scope needs a permit?
Get a free quote →Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial buildings use the same certificate of zoning compliance and must fit their district. Special uses go to a public hearing before the Zoning Board of Appeals. Utility-scale projects carry their own rules: commercial solar, wind and energy storage systems under the ordinances revised July 14, 2026, with filing fees of $5,000 per megawatt (up to $250,000, unused amounts refunded) and permit fees of $7,250 per megawatt. The zoning page posted hearing dates in April, May and June 2026 for the Gatehouse Energy Storage special use application.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning and lot size: confirm the district and minimum lot size; a rezoning means an application, a Zoning Board of Appeals meeting (usually the fourth Thursday of the month) and County Board approval, costing about $150 and taking up to 8 weeks.
- Sewage: where public sewer is within 300 feet of a house, or 1,000 feet of a commercial site, subdivision or multi-family building, the building must connect; otherwise the Health Department must issue a private sewage permit, and the Zoning Administrator will not issue a certificate until that requirement is met.
- Address: an Address Application, handed out with the building permit, goes back to the Zoning Office or 911 office with the parcel’s tax number and a site drawing.
- Flood areas: FEMA lists unincorporated Washington County as not participating in the National Flood Insurance Program.
Washington County permit costs and fees
Fees are set by County Board resolution in two attachments to the zoning ordinance, paid to the County Treasurer’s Office and not refundable:
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Structure of 150 sq ft or more | $100 |
| Structure under 150 sq ft | $0 |
| Agricultural building (ag exempt) | $0 |
| Zoning certificate of compliance | $100 |
| Special use permit | $100 filing plus $50 publication |
| Zoning map amendment (rezoning) | $100 filing plus $50 publication |
| Appeal | $100 filing plus $50 publication |
| Variance | $100 filing plus $50 publication |
| Late filing | $100 |
| Wireless cell tower | $25 per vertical foot |
| Commercial and agricultural towers | $0.06 per vertical foot, minimum $50 |
| Wind and solar farm filing | $5,000 per megawatt up to $250,000; unused amount refunded |
| Wind and solar farm permit | $7,250 per megawatt |
For a typical rural house the county charge is therefore a flat $100, whatever the house costs; a 10-by-12-foot garden shed (120 square feet) pays nothing, and a 12-by-16-foot shed (192 square feet) pays $100. A rezoning to make a small lot buildable adds the $150 filing and publication fees. Violating the ordinance is a Class B misdemeanor with a fine of $20 to $500, each day a separate offense, and the fee schedule also lists a $100 late-filing fee.
Trade permits and who may pull them
Washington County issues no separate electrical, plumbing or mechanical permits and publishes no contractor license or registration for unincorporated land; the zoning certificate is the only county building permit. The trade rules that do apply come from the state and the Health Department:
- Private sewage: each system needs a Health Department permit and must be designed, built, run and maintained under the state Private Sewage Disposal Licensing Act and code, Illinois EPA regulations and the county’s private sewage and land subdivision ordinances.
- Plumbing: plumbing work follows the Illinois Plumbing Code and is done by plumbers licensed by the state.
- Roofing: roofing contractors carry a state license.
Inside Nashville, Okawville and the other towns, trade permits and any contractor registration are set by each city or village.
Rather not deal with the Washington County building department?
Get a free quote →How to get a building permit in Washington County
Confirm the land is outside any town with its own zoning and find its district and minimum lot size.
Rezone a lot that is too small for its district, or claim the agricultural exemption if you own 40 acres or more and the building is for farming.
Connect to public sewer where it is within reach, or get a private sewage permit from the Health Department.
Submit the application through the county’s online portal or at the zoning office with the site details the Administrator asks for.
Pay the fee at the County Treasurer’s Office and return the Address Application to the zoning or 911 office.
Finish within the one-year life of the certificate, then ask for the inspection that leads to the final certificate of zoning compliance.
Review, corrections and what causes delay
The county’s parcel-division flyer points to lot size as the usual reason a project needs extra steps: a parcel split below its district minimum needs a rezoning that can take up to 8 weeks, and the county does not regulate the land division itself, only the building that follows. Subdivision rules come into play when a parcel of 5 acres or less is divided from a larger one; inside a town, or within 1½ miles of Nashville, the town or city handles that side. The Administrator may grant a small administrative variance of 5% or less to the 40-acre agricultural minimum, but only after certified-mail notice to every adjoining owner, and a written objection within 15 days stops it.
Inspections in Washington County
The county’s inspection is a zoning inspection at the end of the job. Under Section 3-3, no new or altered structure or use may be used, occupied or put into operation until a final certificate of zoning compliance is issued, and the Administrator issues it only after inspecting and finding the work matches the approved plan. Failing to get the final certificate is a separate violation. The initial certificate lasts one year and can be renewed for further one-year periods on a written request while the work is being finished in good faith. Private sewage systems are inspected under the Health Department’s permit.
The posted zoning ordinance adopts no building code, and the county’s pages describe no footing, framing or electrical inspections for rural houses; the state note below explains the statewide structural minimums.
Building rules in Washington County
Washington County regulates rural building through its Revised Zoning Ordinance (May 12, 2009) and the wind, commercial solar and energy storage ordinances revised July 14, 2026; its posted zoning ordinance does not adopt a building code for unincorporated land. FEMA’s Community Status Book lists Washington County (community 170997, unincorporated areas) among communities not participating in the National Flood Insurance Program, with flood hazard areas first identified on December 26, 1980.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Washington County permit records and official resources
The Zoning Administrator keeps the county’s records of the district map, certificates of zoning compliance, special use permits, variances, appeals and amendments, and every application related to them. County Board and committee agendas and minutes are posted on the county website.
- Zoning office (online applications, ordinances)
- Revised Zoning Ordinance with fee attachments
- Parcel division in Washington County
- Zoning Board of Appeals meetings and notices
- Wind ordinance (revised July 14, 2026)
- Energy storage systems ordinance (revised July 14, 2026)
- 911 / Addressing Office
- Health Department
- Highway Department
- County Board agendas and minutes
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Washington County permit FAQs
Do farm buildings need a permit in Washington County?
The zoning page says all construction, agricultural buildings included, needs a permit, while the 2009 ordinance exempts buildings used solely for farming once the owner files a Certificate of Agricultural Exemption (40 acres or more). Either way the farm building goes through the Zoning Office, and there is no fee.
How much is a county building permit?
$100 for any structure of 150 square feet or more; structures under 150 square feet and ag-exempt buildings are free.
What is the minimum lot size for a house?
40 acres in the Agricultural District, 2 acres in R-1 Rural Residential and 1 acre in R-2 Urban Residential; smaller farm splits usually need rezoning.
How long does a rezoning take?
Up to about 8 weeks, with a Zoning Board of Appeals meeting and County Board approval, for about $150.
Can I apply online?
Yes. The zoning page links an online application portal; the office at 125 W. St. Louis St. also takes applications.
How do I get an address for a new house?
Fill in the Address Application you receive with the building permit and return it, with a site drawing and the tax number, to the Zoning Office or the 911 office.
Who issues permits in Nashville or Okawville?
The city or village, where it has its own zoning; the county ordinance does not apply inside those limits.
Is unincorporated Washington County in the flood insurance program?
No. FEMA lists the county’s unincorporated areas as not participating in the National Flood Insurance Program.
Simplify Washington County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Washington County sooner?
Let Alliance prepare, file, and track your Washington County permits while your crew stays on the job.
More Illinois permitting guides
Clinton County
Read guide →Perry County
Read guide →Jefferson County
Read guide →Waterloo Building Permit Guide
Read guide →Wauconda Building Permit Guide
Read guide →Waukegan Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Washington County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.