Jefferson County, Illinois Building Permit Guide

To get a building permit in Jefferson County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Jefferson County has no countywide zoning or building department; on rural land its rules cover floodplain development, septic and well inspections, road rights-of-way and commercial solar farms.

Authority: Jefferson County Board (no county building department)Serves: Unincorporated Jefferson CountyPhone: 618.244.8000
County zoning
Chapter 8 onlyBoard statement filed April 26, 2022
Floodplain
Base flood + 1 footFlood protection elevation, Ordinance 2010-01
Septic and wells
Health Department618.244.7134, Mt. Vernon
Courthouse
100 South 10th StreetMt. Vernon; 8 a.m. to 4 p.m.

Jefferson County, with Mt. Vernon as its seat, does not run a building department, and the County Board’s own statement says the county has no zoning beyond Chapter 8 of the county code. On unincorporated land, the county approvals a project can need are a floodplain development permit (buildings protected to one foot above the base flood), Health Department inspection of septic systems and private wells, County Engineer permits for work in county rights-of-way, and a special use and building permit for commercial solar farms. Inside Mount Vernon and the villages, each municipality runs its own permits, and the county code points owners within 1½ miles of a town to that municipality.

What requires a permit in unincorporated Jefferson County?

The County Board answered the zoning question in writing in 2022: refer to Chapter 8 of the county code, and the county has no other zoning. There is no county building code or general building permit for houses, garages or barns on rural land. The county rules that do apply are tied to particular situations:

County approval needed

  • Any development in a mapped floodplain (development permit from the Flood Plain Administrator)
  • Septic systems and private water supplies (Health Department)
  • Utility work, overweight or oversize loads on county highways (County Engineer)
  • Commercial solar farms (special use permit, then a building permit)
  • Subdividing land (county Subdivision Code)
  • Large-scale livestock operations and food businesses (Chapter 8)

No county permit

  • Houses, additions and remodels outside the floodplain
  • Garages, sheds and farm buildings outside the floodplain
  • County electrical, plumbing or mechanical permits

Two rules reach further than owners might assume. First, the floodplain ordinance defines development broadly, covering buildings and repairs but also fences, walls, grading, filling, paving, utilities and stored materials, so even a fence or driveway in a mapped flood area needs a development permit; its building protection rules start at a new building or addition worth more than $1,000 or larger than 70 square feet. Second, the county code tells owners within 1½ miles of a town’s limits to check with that municipality.

What Jefferson County decides and what the state holds

Jefferson County is a non-home-rule county, and its County Board adopts the floodplain, subdivision, nuisance and business ordinances in its code, including Ordinance 2023-05-02 on commercial solar farms, approved May 22, 2023. Sewage is regulated by the Jefferson County Health Department and the Illinois Environmental Protection Agency, as the county code page notes. The plumbing code and plumber licensing belong to the Illinois Department of Public Health, and roofing contractors are licensed by the Illinois Department of Financial and Professional Regulation.

Short on time to read all of this?

Get a free quote →

Jefferson County building department: who handles permitting

With no zoning or building office, the county’s permit roles are spread across a few departments, all in Mt. Vernon. The floodplain ordinance names a Jefferson County Flood Plain Administrator to process development permits and inspect floodplain projects; ask the County Board office at the courthouse to be put in touch.

Jefferson County offices for building projects
OfficeHandlesContact
County Board officeZoning statement, county code, solar special use permits, floodplain administrationJefferson County Courthouse, 100 South 10th Street, Mt. Vernon, IL 62864; 618.244.8000; Monday to Friday 8:00 a.m. to 4:00 p.m.
Jefferson County Health DepartmentOn-site sewage disposal and private water supply inspections4102 South Water Tower Place, Mt. Vernon; 618.244.7134; Monday to Thursday 7:30 a.m. to 4:30 p.m.
Highway Department (County Engineer)Utility permits in county right-of-way; overload, oversize and load-limit permits618.244.8031; permits by fax 618.242.3392 or countyengineer@jeffil.us
AssessorGIS mapping and property tax recordsCourthouse, 100 South 10th Street; 618.244.8000

Cities and villages in Jefferson County

Mount Vernon (14,187 residents) issues its own building, demolition, sign and electrical permits and handles zoning, conditional uses and variances through its Engineering and Inspections Administration at 1100 Main Street, (618) 242-6830, open Monday to Friday 8 a.m. to 5 p.m.; the city requires electrical contractors to be licensed and permitted, and its building permit fee follows project cost, starting at $7.50 for the first $1,000 under the table on its Building Permits page. The villages of Ina (1,612), Bluford (607), Woodlawn (611), Dix (456), Waltonville (406), Bonnie (365) and Belle Rive (307), and the city of Nason (198), each set their own rules inside their limits; a sliver of Centralia’s boundary also touches the county. Ask the city or village hall before building inside, or within 1½ miles of, any of them.

Jefferson County permit types

Because the county issues no general building permit, the approvals are organized by subject rather than by building type.

Residential permits

  • Floodplain development permit. Required before any development in the floodplain. The application includes a scaled site drawing with property lines, existing grades and any cut or fill, the location and size of all buildings and additions, the lowest floor elevation (including any basement), and the project cost estimated by a licensed engineer or architect or in a signed contractor’s estimate.
  • Building protection in the floodplain. Applies to new buildings and additions worth more than $1,000 or larger than 70 square feet, to improvements that add more than 20% of floor area or equal 50% of market value, to repairs of substantially damaged buildings, to manufactured homes placed on a site, and to travel trailers or RVs kept on a site more than 180 days a year.
  • Septic and well. The Health Department’s Environmental Health Division inspects on-site sewage disposal systems and private water supplies; contact it before designing a system for a new home.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial solar farms follow Ordinance 2023-05-02. A developer first obtains a special use permit from the County Board, then a Commercial Solar Energy Building Permit, which the county issues once the Board finds the special use conditions met; the developer must deliver a written Notice to Proceed before construction, and the term construction includes site work such as grubbing, grading, excavation and road work. A Solar Road Use Agreement governs use of county roads. On August 24, 2026 the County Board amended the ordinance’s definition of a responsible bidder. Large-scale livestock operations and food service businesses are regulated under the Chapter 8 business code.

What comes before the building permit

  • Municipal check. Within 1½ miles of a town’s limits, ask that municipality first, as the county code advises.
  • Flood map. Check the parcel on the county GIS before designing; floodways along creeks such as Casey Fork, Bishop Creek and Brickyard Creek carry extra limits.
  • Subdivisions. Land the County Highway Committee finds unsuitable because of flooding, poor drainage, rough topography or bad soils may not be subdivided unless the subdivider presents an acceptable fix.
  • Road access and utilities. Utility installations in county right-of-way need the County Engineer’s utility permit; the Highway Department maintains 194 miles of county highways and 44 bridges, while 16 township highway commissioners control another 907 miles of road and 160 bridges, and the department advises them.

Jefferson County permit costs and fees

Jefferson County charges no building permit fee for rural houses or outbuildings because it has no general building permit. Its posted ordinance pages and permit forms do not list amounts for floodplain development permits, and the Health Department does not post a septic fee schedule, so ask each office for the current charge when you apply.

Rather talk it over?

Call 1-855-478-4290 →
Where Jefferson County charges come from
ApprovalWho sets and collects it
Floodplain development permitCounty Board, through the Flood Plain Administrator
Septic system and private wellJefferson County Health Department
Utility, overload, oversize and 90-day load-limit permitsCounty Engineer (Highway Department)
Commercial solar special use and building permitsCounty Board under Ordinance 2023-05-02
Building permits inside Mount Vernon and the villagesEach municipality

On a floodplain site, the elevation rule can cost more than any fee. The flood protection elevation is the base flood elevation plus one foot, and a protected building must be elevated, or where the ordinance allows floodproofed, to that level, including any basement, which can mean fill, walls with flood openings or an elevated foundation. Where no base flood elevation has been mapped and no other data exist, the ordinance requires the applicant to pay for an engineering study to set one.

Trade permits and who may pull them

The county issues no electrical, plumbing or mechanical permits on unincorporated land and its code shows no county contractor license or registration. What still applies:

  • Plumbing: plumbing work follows the Illinois Plumbing Code, and plumbers are licensed by the Illinois Department of Public Health.
  • Septic: the Health Department and the Illinois EPA regulate sewage; the Health Department inspects on-site sewage disposal systems.
  • Roofing: roofing contractors hold a state license from the Illinois Department of Financial and Professional Regulation.
  • Floodplain certifications: floodproofed or elevated designs in the floodplain must be certified by a licensed professional engineer or architect where the ordinance calls for it.
  • Electrical in Mount Vernon: inside the city, electrical contractors must be licensed by the city and pull a permit.

Contractors working inside other villages should ask each village whether it licenses or registers trades.

Rather not deal with the Jefferson County building department?

Get a free quote →

How to get the approvals a Jefferson County project needs

1. Confirm the jurisdiction

Use the county GIS and property tax inquiry to confirm the parcel is unincorporated and how close it is to a town.

2. Check the flood map

If any part of the site is in a mapped floodplain, plan for a development permit and a lowest floor at the flood protection elevation.

3. Contact the Health Department

Arrange the septic and well review with Environmental Health at 618.244.7134.

4. Line up road permits

Send utility or heavy-load permits to the County Engineer by fax or email.

5. File the floodplain application

Submit drawings, grades, building locations, lowest floor elevation and a cost estimate to the Flood Plain Administrator through the courthouse.

6. Build to the approval

Keep the as-built elevation records; the Administrator inspects floodplain projects.

Review, corrections and what causes delay

The floodplain ordinance sets the main review steps for a rural project. The Administrator compares the site elevation with the base flood elevation: land shown by survey data to have been above the current base flood elevation, and not filled since the site’s first flood map, is outside the ordinance, while land below it and hydraulically connected is covered even if the map does not show it. Work in a floodway, filling, and changes to a watercourse carry stricter tests: the Administrator must notify the Illinois Department of Natural Resources Office of Water Resources and neighboring communities before a watercourse is altered or relocated, and other state and federal permits must be in hand. Commercial solar projects add a County Board special use hearing before any building permit.

Inspections in Jefferson County

There are no county building inspections for houses or farm buildings outside the floodplain. Inside the floodplain, the Flood Plain Administrator inspects development projects, keeps a record of the as-built lowest floor elevation (including basement) or the floodproofing certificate for each protected building, and makes substantial damage determinations after floods. The Health Department’s Environmental Health Division inspects on-site sewage systems and private water supplies, open Monday through Thursday.

For commercial solar farms, the Notice to Proceed comes before any site work, and the special use permit conditions set during the County Board’s review govern construction. Inside Mount Vernon, city inspectors check permitted building and electrical work.

Illinois building code in Jefferson County

Jefferson County has not adopted a building code for unincorporated land; its code covers floodplains, subdivisions, nuisances including dangerous buildings, and business uses. FEMA’s Community Status Book lists unincorporated Jefferson County (community 170305) as participating in the National Flood Insurance Program, with flood maps effective September 17, 2010. Data centers have drawn attention in 2026: after residents raised a possible data center near Dix at the May 18 meeting, the County Board approved a data center resolution on July 27, 2026.

Want this handled start to finish?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Jefferson County permit search and official resources

Floodplain permit files and elevation records are public records the ordinance requires the county to keep for inspection, along with flood maps and copies of state and federal permits. Ask at the courthouse (618.244.8000) or send a written Freedom of Information Act request; septic and well records are held by the Health Department, and parcel data are available through the county’s GIS and property tax inquiry sites.

Inspections are where schedules slip.

Get a free quote →

Jefferson County building permit FAQs

Does Jefferson County require a building permit for a house?

Not on unincorporated land outside the floodplain; the county has no building code or general building permit, though septic and well rules still apply.

Does the county have zoning?

The County Board’s 2022 statement says the county has no zoning other than Chapter 8 of the county code.

What if my lot is in a floodplain?

You need a development permit from the Flood Plain Administrator, and protected buildings must be elevated or floodproofed to one foot above the base flood elevation.

Who handles septic systems?

The Jefferson County Health Department, 4102 South Water Tower Place, Mt. Vernon (618.244.7134), with the Illinois EPA.

Who issues permits in Mount Vernon?

The city’s Engineering and Inspections Administration at 1100 Main Street, (618) 242-6830.

How do I get a permit for work in a county road right-of-way?

Send the utility permit to the County Engineer by fax (618.242.3392) or email.

Can I build a commercial solar farm?

Only with a County Board special use permit and a Commercial Solar Energy Building Permit under Ordinance 2023-05-02.

Simplify Jefferson County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Jefferson County sooner?

Let Alliance prepare, file, and track your Jefferson County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Jefferson County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.