In unincorporated Jo Daviess County, building permits come from the Planning & Development Department, 1 Commercial Drive, Highway Department Building, Suite 1, Hanover (815-591-3810, weekdays 8 a.m. to 4 p.m.), led by Planning & Development Administrator William Meeker. The county enforces the 2021 International codes adopted on January 1, 2025, charges a $75 base fee plus $4 per $1,000 of finished value, and takes about 15 to 20 working days to review a complete packet; a septic permit from the Jo Daviess County Health Department must come first.
What requires a permit in unincorporated Jo Daviess County?
A county permit is needed before any construction or excavation begins, including new houses, accessory buildings, decks, structural changes or repairs, and any work involving electrical wiring, plumbing or life safety codes. The department also issues zoning certificates for dwellings, additions, garages, outbuildings, sheds, decks and patios, and signs, wind turbines, towers, guest accommodations and floodplain development have their own permits.
Permit needed
- New houses and additions
- Accessory buildings of 120 sq ft or more, or any size with wiring or plumbing
- Decks
- Structural changes and repairs
- Electrical, plumbing and life-safety work
- Solar installations (utility interconnect sign-off first)
- Development in a special flood hazard area
No building permit
- Accessory structures under 120 sq ft with no electrical or plumbing
- These still must meet the zoning setbacks
For farm buildings the county posts an Ag Exempt Statement and Affidavit form, and an agricultural building started before its permit is issued carries a $150 penalty. Short-term rentals in the Guest Accommodations program have different requirements from a single-family house, so tell the office early if a home will be rented to guests.
What Jo Daviess County decides and what the state holds
The county adopts its own building code in Title 7 of its code. Since January 1, 2025 it has enforced the 2021 International Building Code (with appendix G), International Residential Code (with appendices A, B, C, D, E, G, J, M and Q), International Mechanical Code and International Fuel Gas Code, and the 2020 National Electrical Code. The state pieces it lists are the 2014 Illinois Plumbing Code, the Illinois energy code (the 2021 IECC as Illinois adopted it) and the 2018 Illinois Accessibility Code.
Jo Daviess County building department: who handles permitting
The Planning & Development Department administers the county building code, zoning ordinance, Guest Accommodations Ordinance, subdivision regulations and telecommunications ordinance. It reviews plans, issues building permits, zoning certificates, occupancy certificates and guest accommodation licenses, inspects buildings under construction, assigns every address in the unincorporated county and helps the Floodplain Officer run the flood ordinance. All property outside a municipality is under county zoning; the cities and villages are not. Before filing, ask the department to confirm that the parcel is unincorporated and to check its zoning.
Short on time to read all of this?
Get a free quote →| Municipality | Who issues building permits |
|---|---|
| Galena (city, pop. 3,210) | City of Galena Building department, which posts its own codes, forms and permit fee schedule |
| Stockton (1,669), East Dubuque (city, 1,457), Warren (1,275), Hanover (824) | Not stated on the county’s pages; ask the village or city hall |
| Elizabeth (695), Scales Mound (419), Apple River (333), Menominee (211), Nora (109) | Not stated on the county’s pages; ask the village hall |
| Unincorporated land | Jo Daviess County Planning & Development |
| Detail | Information |
|---|---|
| Office | Planning & Development, 1 Commercial Drive, Highway Department Building, Suite 1, Hanover, IL 61041 |
| Phone and fax | 815-591-3810; fax 815-591-2728 |
| plan@jodaviesscountyil.gov | |
| Hours | Monday to Friday, 8 a.m. to 4 p.m. |
| Department head | William Meeker, Planning & Development Administrator |
| Septic | Jo Daviess County Health Department, 9483 Route 20 West, Galena, 815-777-0283 |
| County roads | County Highway Department, 815-591-2337 |
Jo Daviess County permit types
The county’s Building Permit Requirements packet, revised December 30, 2024, includes the application. Every building permit needs the completed application with a firm estimate of the finished value, the Residential Building Plan Review Checklist with its plans, two sets of scaled building plans, two copies of a survey or site plan, and the septic permit.
Not sure this scope needs a permit?
Get a free quote →Residential permits
- Site plans. Show road and property-line setbacks: 75 feet from the property line (125 from the centerline) on state highways, 60 (110) on county roads and 50 (80) on township roads, plus side setbacks of 20 feet and rear setbacks of 40 feet in the Agricultural and R-1 districts. Add existing and proposed topography and drainage, erosion control during and after construction, and the area to be cleared on wooded lots.
- Accessory buildings. Total accessory area is capped by district and lot size: under 5,000 square feet of non-farm accessory space on Agricultural lots under 5 acres, 1,950 or 2,400 square feet in R-1 and 1,500 to 2,400 square feet in R-2, attached garages included in the residential districts. Lot coverage by hard surfaces is also limited by district.
- Insulation. Conditioned space gets a post-insulation inspection, and the county posts an insulation compliance certificate.
- Changes. Major structural changes after issue need a structural change request.
- House checklist. The packet’s building checklist calls for GFCI protection wherever water and electricity meet, arc-fault protection under NEC 210.12(A), tamper-resistant receptacles, hard-wired interconnected smoke detectors in each bedroom and outside sleeping areas, carbon monoxide detectors within 15 feet of each bedroom, a passive radon pipe ending 12 inches above the roof, egress windows of at least 5.7 square feet with sills no higher than 44 inches, stair risers up to 7¾ inches and treads of at least 10 inches, handrails on stairs of three or more steps and 36-inch guards on decks and porches more than 30 inches up.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial structures need architecturally stamped plans. Outdoor lighting on new commercial, industrial and residential projects must use full-cutoff fixtures for any light of 2,000 lumens or more, aimed to limit light trespass, and businesses must reduce lighting to security levels within 30 minutes after closing. Building permit fees for projects in the Freeport/Stephenson County Enterprise Zone can be waived by County Board resolution, and an administrative fee may then apply.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. Rezonings, special uses and variances go to the combined Planning Commission and Zoning Board of Appeals, which meets on the fourth Wednesday of each month; the County Board makes the final rezoning decision. A separate Building Code Board of Appeals hears appeals of the building official’s orders and code interpretations ($250).
- Lot shape. Non-farm lots created after the May 12, 2009 ordinance amendment may not exceed a proportional ratio of 1.40, comparing the parcel’s perimeter with that of a 2:1 rectangle of the same area.
- Address. New addresses come from Planning & Development after the road authority signs off on safe access; file the address application with the building permit.
- Driveways. The County Highway Department (county roads), the township road commissioner (township roads) or IDOT’s Dixon office (815-284-5988, state routes) issues driveway and culvert permits.
- Septic. The Health Department issues the septic permit and sends it straight to Planning & Development.
- Private and river reviews. Apple Canyon Lake (815-492-2238) and the Galena Territory (815-777-2000) run their own architectural reviews, and the Upper Mississippi River International Port District requires permits for structures over, under, in or within 40 feet of navigable waters.
Rather talk it over?
Call 1-855-478-4290 →Jo Daviess County permit costs and fees
The department posts its fee schedule as the schedule in force as of December 12, 2024 (the document itself carries a September 2022 revision date). The office tells you the permit fee after review, and no work, excavation included, may start until it is paid.
| Item | Fee |
|---|---|
| Building permit application (base fee) | $75 |
| Building permit | $4 per $1,000 of cost value |
| Flood area development permit | $100 |
| Additional inspection (work not ready or continuing violations) | $50 each |
| Zoning certificate: single-family dwelling | $50 |
| Zoning certificate: addition / garage or outbuilding / shed, deck or patio | $25 / $25 / $10 |
| Zoning certificate: commercial, manufacturing or industrial | $100 ($50 additions and accessory buildings) |
| Guest accommodations zoning certificate | $500 |
| Special use permit | $500 |
| Zoning variance | $175 residential lot; $250 commercial or industrial; administrative variance $125 |
| Guest accommodations license | $400 initial; $325 a year |
| Subdivision | $500 up to 10 acres; $750 for 11 to 20; $20 per acre over 20 |
| Building code or zoning appeal | $250 |
| Work started without a permit | Fees increased 100%; $150 on an agricultural building |
Rather not deal with the Jo Daviess County building department?
Get a free quote →Worked example from the schedule: a new house with a finished value of $200,000 pays the $75 base fee plus 200 × $4 ($800), or $875, and a $50 zoning certificate, for $925 before any floodplain or septic charges. Fees for any action taken to correct a violation are increased by 50%. Temporary uses are free (Type 1), $350 (Type 2) or $25 (Type 3, agri-tourism), and a Land Evaluation and Site Assessment outside a rezoning costs $50. Rezoning from Agricultural to a residential district costs $400 plus $25 an acre for requests of 5 acres or more, and to commercial, manufacturing or industrial $800 plus $50 an acre (on requests of 5 to 40 acres).
Trade permits and who may pull them
Electrical, mechanical and life-safety work is covered by the county building permit and inspected by Planning & Development under the 2020 National Electrical Code and the 2021 mechanical and fuel gas codes. Plumbing is inspected by the state: before covering any plumbing, the installer must contact the Illinois Department of Public Health’s State Plumbing Inspector at 815-987-7870, and the county packet quotes the Illinois Plumbing License Law requirement that plumbing be planned and installed by licensed plumbers.
- Septic contractors: the owner or the septic contractor gets the septic permit from the Health Department.
- Solar installers: the utility’s interconnection sign-off is needed before approval, so solar reviews can take longer.
- Towers and wind: towers pay $25 per foot of height, and commercial wind turbines pay by the foot on a sliding scale.
How to apply for a Jo Daviess County building permit
Ask Planning & Development about the parcel’s zoning and any rezoning, special use or variance needed.
Get the Health Department septic permit and file an address application if the site needs one.
Obtain the driveway or culvert permit from the county, township or IDOT.
Application, plan review checklist, two plan sets and two site plans with setbacks and drainage.
Allow 15 to 20 working days; the office then calls with the fee and payment options.
Start within six months of issue and keep inspections regular.
Review, corrections and what causes delay
Review takes about 15 to 20 working days after a complete packet arrives, longer for solar. Work may not start, even excavation, until the fee is paid, and starting early can bring penalty fees. A permit stays valid only if work starts within six months and inspections continue steadily. No building permit is issued without the septic permit or sign-off.
Want this handled start to finish?
Get a free quote →Inspections and certificates in Jo Daviess County
The owner or contractor calls Planning & Development at 815-591-3810 for every inspection, as early as practical. Call 3 to 4 hours before pouring a footing, once framing is done and before siding starts, 24 hours ahead when rough mechanical and electrical work is complete and before insulating, 24 hours ahead for the post-insulation inspection of any conditioned space, and 24 hours ahead for the final, when electrical, heating and cooling and life-safety items, handrails and guardrails included, are finished. The county issues an occupancy certificate after the final. In a special flood hazard area, an elevation certificate based on the drawings is needed before the building permit and another based on the finished building before the occupancy permit.
Illinois building code in Jo Daviess County
Jo Daviess County enforces the 2021 International codes adopted effective January 1, 2025 in its unincorporated area. FEMA’s Community Status Book lists Jo Daviess County (community 170902, unincorporated areas) as participating in the National Flood Insurance Program, with a current flood map dated December 2, 2015; the county is not in the Community Rating System.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Jo Daviess County building permit FAQs
How much is a building permit in Jo Daviess County?
A $75 base fee plus $4 per $1,000 of the finished value; a $200,000 house pays $875, plus a $50 zoning certificate.
Do I need a permit for a small shed?
Not if it is under 120 square feet and has no electrical or plumbing, but it must still meet the zoning setbacks.
How long does review take?
About 15 to 20 working days after a complete application, and longer for solar projects.
Does the county issue permits in Galena?
No. Galena has its own Building department; the county covers unincorporated land.
Who inspects plumbing?
The Illinois Department of Public Health’s State Plumbing Inspector, who must be called before plumbing is covered.
Do I need a septic permit first?
Yes. The Jo Daviess County Health Department’s septic permit or sign-off must be issued before the building permit.
Inspections are where schedules slip.
Get a free quote →Can I start digging while my permit is under review?
No. No work, excavation included, may start before the permit fee is paid, and early work can bring penalty fees.
Jo Daviess County permit records and official resources
Planning & Development keeps building permits, zoning certificates, occupancy certificates and address records for unincorporated Jo Daviess County; call 815-591-3810 or email plan@jodaviesscountyil.gov. Galena’s permit records stay with the city, and village records with each village that issues permits.
- Jo Daviess County Planning & Development
- Building permit requirements with application (rev. 12-30-2024)
- Planning & Development fee schedule
- Planning Commission and Zoning Board of Appeals
- Zoning FAQ
- City of Galena
- FEMA Community Status Book, Illinois
Simplify Jo Daviess County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Jo Daviess County sooner?
Let Alliance prepare, file, and track your Jo Daviess County permits while your crew stays on the job.
More Illinois permitting guides
Jersey County
Read guide →Jefferson County
Read guide →Kane County
Read guide →Joliet Building Permit Guide
Read guide →Justice Building Permit Guide
Read guide →Kankakee Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Jo Daviess County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.