In Taylorville, building permits are handled by Building and Zoning Officer Trevor Wagahoft ((217) 824-8713, hbo@taylorville.net), who is also the city’s health and animal control officer. Applications go by email to him or in person to the City Clerk’s office at City Hall, 115 North Main, and no permit is issued until the fee is paid. Living space is charged $25 per 100 square feet, a permit lasts 12 months, and any accessory building over 120 square feet needs one.
What requires a building permit in Taylorville?
Taylorville’s permit forms show the work the city expects to see. The main application is for a building permit and a certificate of occupancy and compliance together, and the city adds shorter forms for remodeling, demolition, solar, signs and portable storage containers.
Building permit
- New houses, garages and commercial buildings
- Additions, basements and unheated non-living space
- Decks and porches
- Accessory buildings larger than 120 square feet
- Fences ($50 flat fee)
- Solar energy systems, ground or building mounted
Other city permits
- Remodeling: siding, windows, doors, roofing and similar work
- Demolition of a building
- Signs, erected by a sign firm licensed with the City Clerk
- Portable storage containers ($25 for 60 days)
- Home occupations
Zoning rules travel with the permit. In the R-1 and R-2 districts a house needs a 25-foot front yard, side yards of at least 5 feet on one side and 12 feet combined, and a rear yard of 20 feet or 20 percent of the lot depth, whichever is greater; corner lots need a front yard on each street. An accessory building must match the house in materials and design, may not cover more than 10 percent of the remaining rear yard without a variance, and must stay 10 feet from the house and out of the front and side setbacks. Fences may be no higher than 6 feet anywhere, 4 feet in front of the house, and 3 feet (or 30 percent solid) near a street intersection.
What Taylorville decides and what the state holds
The city writes its zoning ordinance, building code and health regulations, all of which its application binds the builder to, sets its own permit fees, and licenses sign erectors through the City Clerk. Septic systems and private wells are permitted by the Christian County Health Department, not the city. Statewide rules still apply to plumbing (the Illinois Plumbing Code and state-licensed plumbers) and to roofing contractors, who hold an Illinois license.
Taylorville building department: who handles permitting
The city lists a single officer for building and zoning. Trevor Wagahoft holds the title of Health, Building and Animal Control Officer, and the city directory lists him as Building & Zoning Officer; besides permits he enforces the ordinances on weeds, dangerous buildings, garbage and abandoned vehicles and runs animal control. The City Clerk’s office receives paper applications and keeps contractors’ insurance or bond certificates on file.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Building & Zoning Officer | Trevor Wagahoft, (217) 824-8713, hbo@taylorville.net |
| City Hall and City Clerk | 115 North Main, Taylorville, IL 62568; (217) 824-2101; fax (217) 824-8731 |
| Hours | Monday to Friday, 8 a.m. to 4:30 p.m., except holidays |
| Fire Department (commercial key boxes) | Fire Chief, (217) 824-2295 |
| Water and sewer sign-off (demolition) | Water Superintendent and Street & Sewer Superintendent |
| Septic and wells | Christian County Health Department, 730 North Pawnee Street; 217-824-4113 |
The city’s forms cover work inside Taylorville. For a parcel at or beyond the edge of town, ask the Building and Zoning Officer which body has jurisdiction before you apply.
Taylorville permit types
Every application ends with the same instruction: email the completed form to hbo@taylorville.net or deliver it in person to the City Clerk’s office. The city also posts instructions for paying online.
Residential permits
- Building permit and certificate of occupancy. One form asks for the building type and stories, lot, block and subdivision, dimensions, number of rooms, materials, total cost and the names of the carpenter, mason, sewer builder, plumber and electrician. Attach a legible sketch or blueprint showing property lines and streets.
- Remodeling permit. For siding, windows, doors, roofing or other listed work, with owner and general contractor details; it is good for six months from issue.
- Solar permit. Mark small or large system and ground or building mounted; a solar PV plan must be included, and the city asks for a site plan for final review.
- Portable storage container. $25 for 60 days under Section 10-14-3 of the City Code; every owner and occupant signs, and the officer may extend the period after a disaster, a move or interior repairs.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
Commercial and industrial buildings are charged by floor area. In the C-1 and C-2 districts the checklist asks for a site plan showing boundaries and acreage, vehicle circulation, sidewalks, sewer and water lines, grading, storm drainage, building locations, street profiles, setbacks and outdoor lighting and signs. Setbacks are 15 feet in front, 10 feet at the sides and 20 feet at the rear, where half of an abutting alley can count toward the rear yard. C-1 buildings may rise three stories or 45 feet and C-2 buildings two stories or 30 feet. Since July 5, 2000, every new commercial building must have a key box approved by the Fire Department, and off-street parking and loading follow the city’s schedule.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Variance. If the project breaks a setback or other standard, the Board of Appeals hears a variance; the fee is $150, the officer estimates about 30 days, and you or a representative must attend the meeting.
- Special use. Filed with the Zoning Enforcing Officer and Plan Commission with a $275 check, a sketch, the deed’s legal description and a list of neighboring owners.
- Rezoning. Petitioned to the Mayor and City Council for $275, plus any Christian County Soil and Water Conservation District review and court reporter costs.
- Septic and well. On land without city sewer, the Christian County Health Department must issue a sewage permit before construction, and a well permit before a well is drilled.
- Insurance or bond. Proof must be on file with the City Clerk before excavation, or before heavy equipment crosses a parkway or sidewalk.
Taylorville permit costs and fees
The city posts a three-page fee sheet, which carries no ordinance number or adoption date, and repeats the residential rates on the building permit checklist. No permit is issued until the fees are paid, and no permit is issued to anyone in default to the city.
| Work | Fee |
|---|---|
| Residential living space | $25 per 100 sq ft or part of 100 |
| Basement | $30 for a basement (the sheet does not say whether this is per 100 sq ft; ask the officer) |
| Non-living unheated space | $10 per 100 sq ft or part of 100 |
| Fence | $50 |
| Decks and porches | $10 on the fee sheet; $10 per 100 sq ft on the checklist |
| Commercial or industrial building | $0.15 per sq ft up to 5,000 sq ft; $0.10 per sq ft above 5,000 |
| Demolition / home occupation | $75 / $25 |
| Sign / portable storage container | $20 / $25 |
| Variance (Board of Appeals) / variance appeal | $150 / $150 |
| Appeal of an administrative decision | $175, filed within 20 days |
| Rezoning / special use | $275 each (rezoning plus soil and water district and court reporter costs if needed) |
| Subdivision plats | Sketch $100; preliminary plan $500; minor subdivision $275; final plat $500 plus 3% of public infrastructure cost |
| Initial nonrefundable deposits | Subdivisions $250; annexation petition $100; commercial, industrial, multi-residential or site development projects $350 |
Rather talk it over?
Call 1-855-478-4290 →Worked examples from the sheet: a house with 1,650 square feet of living space is billed as 17 units of 100 square feet, or $425; a 7,000 square foot commercial building is 5,000 × $0.15 plus 2,000 × $0.10, or $950. The appeal fee is refunded only if four members of the Board of Appeals vote to reverse the decision. Two lines on the sheet differ from other city records: the checklist charges decks and porches by the 100 square feet, and the city’s October 2026 building report records demolition permits at $250 rather than the sheet’s $75 and solar permits at $250, a permit the fee sheet does not list, so confirm those amounts with the officer before paying.
Trade permits and who may pull them
Taylorville does not post separate electrical, plumbing or mechanical permit forms; the building permit application lists the plumber, electrician, sewer builder, mason and carpenter on the job, and the contractor accepts responsibility for any damage to sidewalks, gutters, alleys, streets and other city property.
- Plumbing: plumbing follows the Illinois Plumbing Code, and plumbers are licensed by the Illinois Department of Public Health.
- Roofing: roofing contractors hold an Illinois license from the Department of Financial and Professional Regulation; re-roofing appears on the city’s remodeling permit.
- Signs: the firm erecting a sign must be licensed by the City Clerk, and a sign over or able to fall on city property needs a $1,000,000 bond or insurance certificate.
- Septic installers: the Christian County Health Department charges $150 for an installation by a licensed installer and $350 when a homeowner installs the system.
- Electricians: the solar application asks for the electrician’s name and contact details; the city’s pages do not describe a city electrical license.
Rather not deal with the building department?
Get a free quote →How to apply for a Taylorville building permit
Find the lot’s district on the city zoning map and measure the setbacks, easements and corner sight lines.
If the plan breaks a setback, file the variance checklist with $150 and allow about 30 days.
Unsewered lots need Christian County Health Department approval before construction.
Fill in every line of the building permit form and attach a legible sketch or blueprint with property lines and streets.
Email the form to hbo@taylorville.net or bring it to the City Clerk at 115 North Main, then pay the fee; the permit issues only after payment.
Put the contractor’s insurance or bond on file with the City Clerk before digging, and begin work within 90 days.
Review, corrections and what causes delay
The officer checks the location, zoning district and setbacks against the sketch before issuing a permit, so show property lines, streets and any utility easements on the sketch. Owing money to the city also stops a permit. A permit becomes void if work does not start within 90 days and expires after 12 consecutive months, and a demolition permit must be renewed if the work is not finished 30 days after application. For demolition, the contractor must notify the water and sewer superintendents three working days before starting and agree to notify the Illinois Environmental Protection Agency.
Inspections and certificates of occupancy
The checklist describes two site visits by the officer: a follow-up visit after construction starts to confirm the work matches the application, and a final visit when the building is complete and ready for occupancy. If the building fully complies, the officer issues a certificate of occupancy and compliance, the second half of the original application. For demolition, the water superintendent disconnects the service and the sewer superintendent seals and inspects the sewer line. On private systems, a Christian County Health Department sanitarian inspects every septic installation or repair, and the county permit expires six months after approval if construction has not started.
Illinois building code in Taylorville
Taylorville’s application binds builders to the city’s zoning ordinance, building code and health regulations and the setback and minimum floor-area rules recorded for the lot. The forms do not name code editions; the Building and Zoning page links the City Code, published through American Legal, and the officer can say which editions apply. FEMA’s Community Status Book lists Taylorville (community 170038) as participating in the National Flood Insurance Program; its flood map dated June 16, 2011 is marked as having no base flood elevations determined.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Taylorville permit search and official resources
The city posts monthly building reports for each year from 2020 to 2026, listing each permit’s date, address, type, number and fee, which is the quickest way to check whether a permit was issued at an address. For other records, contact the City Clerk at City Hall, 115 North Main, (217) 824-2101. Council agendas and minutes are posted on the city website.
- Taylorville Building & Zoning (forms and reports)
- Building permit application and checklist
- Building permit and zoning fee sheet
- Remodeling permit application
- Solar permit application
- Demolition permit application
- Variance checklist
- Special use checklist and application
- Rezoning application
- Sign erection application
- Portable storage container permit
- 2026 building reports
- City Council minutes
- City Hall contacts
- Christian County Health Department environmental health
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Taylorville building permit FAQs
How much is a building permit for a new house in Taylorville?
$25 per 100 square feet (or part of 100) of living space and $10 per 100 square feet of unheated non-living space, with a separate basement charge; 1,650 square feet of living space is $425.
Does a shed need a permit?
Yes, if it is larger than 120 square feet; it must also match the house and stay 10 feet from it and out of the front and side setbacks.
How tall can a fence be?
Up to 6 feet anywhere on the lot, 4 feet in front of the house and 3 feet near a street intersection; a fence permit costs $50.
How long is a building permit good for?
Twelve consecutive months, but it is void if work has not started within 90 days; a remodeling permit lasts six months.
How do I submit an application?
Email it to hbo@taylorville.net or hand it in at the City Clerk’s office, 115 North Main; the permit is issued after the fee is paid.
Who handles septic systems?
The Christian County Health Department, which requires a permit before construction and charges $150 for a licensed installer or $350 for a homeowner installation.
How long does a variance take?
About 30 days once the checklist is complete, with a $150 fee and attendance at the Board of Appeals meeting.
Simplify Taylorville permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Taylorville sooner?
Let Alliance prepare, file, and track your Taylorville permits while your crew stays on the job.
More Illinois permitting guides
Sangamon County
Read guide →Macon County
Read guide →Champaign County
Read guide →Tazewell County Building Permit Guide
Read guide →Tinley Park Building Permit Guide
Read guide →Troy Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Taylorville permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.