In Morris, permits come from the Building & Zoning Office in City Hall, 700 N. Division Street (815-942-1855), headed by the Building & Zoning Officer. The city requires a permit for every new house, addition, deck, fence, shed, gazebo, porch, sign, commercial remodel and demolition, and it will not issue one unless every contractor on the job is registered with the city; registration costs $200 a year for a general contractor and $100 for other trades. Land outside the city limits is permitted by the Grundy County Land Use Department.
What requires a building permit in Morris?
The Building & Zoning Office publishes its own list, and it is broad: a permit is required for every new residence, building addition, deck, fence, shed, gazebo, porch and sign, for commercial remodeling and for the demolition of any building. The office asks owners to check with the Zoning Officer before starting any construction they are unsure about.
Permit required
- New houses and new industrial or commercial buildings
- Additions
- Decks and porches
- Fences
- Sheds and gazebos
- Signs
- Commercial remodeling
- Demolition of any building
- Electrical work (separate electrical permit form)
Extra review
- Site plan review for new development under Article XXVII
- Planning and Zoning Commission for rezonings and variances
- Floodplain and elevation noted on new-home permits
- Fire Marshal inspections for new occupancies
Work on an existing home is filed on the city’s remodeling application, and jobs without a dedicated form go on the miscellaneous permit application with a site plan and an estimated value.
What Morris decides and what the state holds
Morris adopts its building, zoning and subdivision rules by ordinance in its Code of Ordinances, which the city publishes on Municode. The Building & Zoning Officer enforces them, and the city’s site plan checklist states that steel and post-frame buildings are not allowed in city limits. What the city does not control is the licensing of plumbers and roofers: those are state licenses, and the city’s contractor registration form asks for both license numbers. Plumbing work follows the Illinois Plumbing Code.
Morris building department: who handles permitting
All building, electrical, sign and demolition permits for property inside the city come from the Building & Zoning Office, which the city places in City Hall and which is headed by Bill Martin, the Building & Zoning Officer. The office also registers contractors and receives site plan review applications. Fire safety in new and existing buildings is the City Fire Marshal’s office, and water and sewer connections run through the Water Department.
Short on time to read all of this?
Get a free quote →| Office | Handles | Contact |
|---|---|---|
| Building & Zoning Office | Building, electrical, sign and demolition permits; contractor registration; site plan review; zoning questions | City Hall, 700 N. Division Street, Morris, IL 60450; 815-942-1855; fax 815-941-5236 |
| City Hall general line | Clerk’s office (8:00 a.m. to 4:30 p.m., Monday to Friday), Fire Marshal ext. 8 | (815) 942-0103 |
| Water Department | Water service, meters, taps | 700 N. Division Street; (815) 942-4026 |
| Public Works | Sidewalks, streets, sewer issues | 815-942-5063 |
| Grundy County Land Use Department | Unincorporated Grundy County outside Morris | 1320 Union Street, Morris; 815-941-3120 |
Morris is the Grundy County seat, with about 14,670 residents by the Census Bureau’s 2025 estimate. The county’s Land Use Department is also in Morris, at 1320 Union Street, so owners near the city edge should confirm on the city’s 2026 zoning map which side of the line a parcel falls on: inside the limits the city issues the permit, outside it the county does, under the county’s own plan review and contractor rules.
Morris permit types and forms
Morris works from printable application forms posted in the Building & Zoning document center, and each one is filed with the Building & Zoning Office at City Hall.
Residential permits
- New construction, residential. Lists every contractor on the house, from architect, excavator and foundation to plumbing, electrical, roofing, HVAC and sewer and water, plus square footage of living area, garage, basement and lot, and the number of bedrooms, bathrooms, garages and stories. The office records setbacks, floodplain status and elevation before signing the permit.
- Remodeling permit. For work on an existing home.
- Miscellaneous permit. Type of construction, a site plan, the estimated value and the contractor or owner doing the work.
- Electrical permit. Service size (60, 100 or 200 amps), the electrical contractor and the estimated value; the city records the Commonwealth Edison notification on it.
- Demolition permit. Requires the owner’s consent and shut-off information for the water tap, sewer tap, electric and gas before the building comes down.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Industrial and commercial buildings use the separate new construction industrial/commercial application, and signs have their own sign permit application. New development also goes through site plan review: the application goes to the Building & Zoning Officer with two sets of the site plan, drawn at 1 inch to 20 feet for sites under 2 acres and 1 inch to 40 feet for larger ones, and a signed Professional Service Reimbursement Agreement.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Site plan contents. Article XXVII asks for topography at two-foot contours extending 20 feet past the site, water bodies, wetlands, streams and floodplains, building floor area, height and elevations (industrial buildings also give their volume in cubic feet), a grading, drainage, stormwater and erosion control plan consistent with the subdivision regulations, utility plans, a landscape plan with every existing tree over 6 inches in caliper and new trees drawn at 75% of mature size, and lighting plans with fixture types and heights.
- Zoning approvals. The Planning and Zoning Commission hears rezonings and variances and sends a recommendation to the City Council, which acts by ordinance; the city also has a Zoning Board of Appeals and a Development Review Committee.
- Utility locates. Public Works reminds anyone digging to call JULIE at 811 first.
Morris permit costs and fees
The city’s permit forms leave the fee line blank for the office to fill in, and its pages do not post a building permit fee schedule, so get the amount from the Building & Zoning Office (815-942-1855) before filing. The fees the city does publish are for contractor registration, and they apply to every contractor working inside the city limits.
| Item | Fee |
|---|---|
| Registration, general contractor (per year) | $200 |
| Registration, all other contractors (per year) | $100 |
| Registration from November 1 through March 30 | Half price |
| Surety bond, general contractor | $20,000 |
| Surety bond, electrical, plumbing, HVAC and all other contractors | $10,000 |
| Liability insurance, bodily injury / property damage | $300,000 / $100,000 |
| Business auto insurance, bodily injury / property damage | $300,000 / $50,000 |
Registrations run to April 30 and must be renewed on May 1, so a contractor registering in December pays $100 (general) or $50 (other trades) for a registration that still expires the following April 30. Developers also sign the Professional Service Reimbursement Agreement: the city bills them for the reasonable cost of the engineering, planning, legal and other consultants it uses to review a project, invoices are due within 30 days, and the obligation stands even if the project never receives a final occupancy permit.
Rather talk it over?
Call 1-855-478-4290 →Trade permits and who may pull them
Morris issues its own electrical permits and ties every trade to its registration rule: the new-home application states in capitals that all contractors must be licensed with the City of Morris or the permit will not be issued, and the contractor form says every contractor wishing to do business within the corporate limits must register with the Building & Zoning Officer.
- Electrical: a separate electrical permit form, with the service size and the electrical contractor named; electrical contractors post a $10,000 bond.
- Plumbing: plumbers are licensed by the Illinois Department of Public Health and register with the city; the registration form asks for the state license number and expiry, and plumbing contractors post a $10,000 bond.
- Roofing: roofers hold a state license from the Illinois Department of Financial and Professional Regulation, and the city records that license number on the registration.
- HVAC: registered with the city with a $10,000 bond.
- General contractors: $200 a year with a $20,000 bond, proof of liability, auto and workers’ compensation insurance naming the City of Morris as certificate holder.
The miscellaneous permit form has a line for “contractor/owner”, so an owner can be named on small jobs, but the city’s pages do not spell out a homeowner exemption for trade work; ask the Building & Zoning Officer before doing your own electrical or plumbing.
How to apply for a Morris building permit
Use the 2026 zoning map to confirm the parcel is inside the city and see its district.
Ask whether the project needs a permit, a variance or site plan review before you draw plans.
Every contractor files the registration form with insurance certificates and a surety bond.
New residential, remodeling, miscellaneous, electrical, sign, demolition or new industrial/commercial.
Include a site plan with dimensions and setbacks; development projects add the Article XXVII site plan set.
Deliver the application to the Building & Zoning Office, 700 N. Division Street, and pay the fee the office sets.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
Contractor registration is the first thing to clear in Morris: a new-home permit will not issue while any contractor on the list lacks a current city registration, and a registration is suspended if its insurance certificate or surety bond lapses until a renewal is mailed or faxed in. Site plan reviews start only when the application, the signed reimbursement form and both plan sets are in, and larger projects wait on the city’s consultants, whose costs the developer pays. Variances and rezonings add a Planning and Zoning Commission hearing and a City Council vote; the council meets on the first and third Mondays of each month at 6:00 p.m.
Inspections in Morris
Inspections are arranged with the Building & Zoning Office at 815-942-1855. Before a new-home permit is signed, the office records the front, side and rear setbacks, whether the lot is in a floodplain and the planned elevation. Electrical work is inspected under its own permit, and the office logs a Commonwealth Edison notification on that permit.
Demolitions start only after the water tap, sewer tap, electric and gas have been shut off and the dates recorded on the permit. For new buildings, the City Fire Marshal’s office carries out fire and life-safety inspections of new and existing occupancies, from houses to commercial projects; unsafe or dangerous conditions are reported to that office at 815-942-0103, ext. 8. A final occupancy permit closes out new construction, and for development projects the city’s consultant review costs remain payable whether or not that occupancy permit is granted.
Illinois building code in Morris
Morris enforces the building and zoning codes adopted in its Code of Ordinances. FEMA’s Community Status Book lists the City of Morris (community 170263) as participating in the National Flood Insurance Program, with flood maps effective August 2, 2012, and the city’s new-home permit records a floodplain check for every lot. The city’s data center page lists Ordinances 4690, 4691 and 4692, dated August 18, 2025, as its agreements with the developer of the proposed Morris Technology Park data center campus on about 340 industrially zoned acres between Route 6 and Gun Club Road.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Want this handled start to finish?
Get a free quote →Morris permit search and official resources
Copies of permits, plans and inspection records are requested from the city’s FOIA Officer at City Hall, 700 N. Division Street, using the city’s Request for Public Records form. The form lets you choose to inspect records at City Hall or receive copies, and by filing it you agree to pay the copying and certification fees in advance unless the FOIA Officer grants a public-interest waiver.
- City of Morris Building & Zoning Office
- New construction residential permit application
- Remodeling permit application
- Miscellaneous permit application
- Electrical permit form
- Demolition permit application
- New construction industrial/commercial application
- Site plan review application
- Professional Service Reimbursement Agreement
- Contractor registration form, fees and bonds
- Morris Comprehensive Plan (2024)
- Planning and Zoning Commission and council agendas
- Morris Technology Park (data center) documents
- City of Morris FOIA request form
- Grundy County Land Use Department
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Morris building permit FAQs
Do I need a permit for a fence or shed in Morris?
Yes. The city requires permits for fences, sheds, gazebos, decks, porches and signs as well as new homes and additions.
Does my contractor have to register with the city?
Yes. Every contractor working inside Morris registers with the Building & Zoning Officer; the fee is $200 a year for a general contractor and $100 for other contractors.
When do contractor registrations expire?
On April 30 each year; they are renewed on May 1, and registrations bought from November 1 through March 30 cost half price.
What bond does a contractor need?
A $20,000 surety bond for a general contractor and $10,000 for electrical, plumbing, HVAC and all other contractors.
Can I build a post-frame or steel building in Morris?
The city’s site plan checklist states that steel and post-frame buildings are not allowed in city limits.
Where do I apply?
At the Building & Zoning Office in City Hall, 700 N. Division Street, on the city’s printed forms; call 815-942-1855 with questions.
How is a zoning variance approved in Morris?
The Planning and Zoning Commission holds the hearing and recommends; the City Council then grants or denies the variance by ordinance at one of its meetings on the first and third Mondays.
Who permits land just outside Morris?
The Grundy County Land Use Department at 1320 Union Street (815-941-3120) handles unincorporated Grundy County.
Simplify Morris permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Morris sooner?
Let Alliance prepare, file, and track your Morris permits while your crew stays on the job.
More Illinois permitting guides
Grundy County
Read guide →Minooka
Read guide →LaSalle County
Read guide →Morton Grove Building Permit Guide
Read guide →Mount Prospect Building Permit Guide
Read guide →Mount Vernon Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Morris permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.