In the City of Markham, building permits are issued by the Building and Housing Department at City Hall, 16313 Kedzie Parkway (708-331-4905, extension 319 for building permits), headed by Building and Housing Director Robert Scharnhorst. Nearly all exterior and interior work needs a permit, and every contractor must hold a $175 annual city registration. Before a home is sold or a rental changes tenants, the city inspects it and issues a certificate of occupancy.
What requires a building permit in Markham?
Markham’s rule is broad: the department requires a permit for all exterior and interior alterations and remodeling, and lists the common jobs that fall under it. Call extension 319 with questions before you start.
Permit required
- Interior and exterior alterations and remodeling, additions and new construction
- Roofs, siding, gutters, downspouts and windows
- Fences, driveways, flatwork (concrete, asphalt, pavers), sheds and garages
- Swimming pools and decks
- Electrical, plumbing, heating, air conditioning and water heaters
- Signs, structural work, parking lots and demolition (listed on the application)
Other city approvals
- Home sales: a point-of-sale inspection and a city transfer stamp
- Rentals: yearly rental registration and an inspection at each tenant change
- Vacant buildings: registration within 30 days under Ordinance 23-0-2350
- Businesses: a city business license
Before any permit is issued, every debt the property owner owes the city, such as a water balance, liens, tickets or board-up and grass-cutting charges, must be paid; the application has a box for each. Work is allowed Monday to Saturday from 7:00 a.m. to 7:00 p.m., and not on Sundays.
What Markham decides and what the state holds
Markham is a city that writes its own building, housing and rental rules into its Code of Ordinances, published by American Legal Publishing; the City Clerk’s Office supplies copies of recently passed ordinances that are not yet codified. The city registers contractors, sets its own inspection and transfer requirements, and requires state licenses where the state licenses a trade, such as plumbers, roofers and fire protection contractors. The forms the city posts do not state which code editions it has adopted, so ask the department which edition your plans must meet.
Markham building department: who handles permitting
The Building and Housing Department handles building permits, housing and rental inspections, code enforcement and a court desk (ext. 324). It aims to keep homes and businesses in line with city ordinances, and its staff take permit questions by phone. Building and Housing Director Robert Scharnhorst leads the department. Unincorporated land near Markham is permitted by the Cook County Department of Building and Zoning, not by the city.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | Building & Housing Department, City Hall, 16313 Kedzie Parkway, Markham, IL 60428 |
| Building permits | 708-331-4905 ext. 319 |
| Housing and code enforcement | 708-331-4905 ext. 321 |
| Rental licensing | 708-331-4905 ext. 314 |
| Transfer stamps and sale inspections | 708-331-4905 ext. 315 |
| Director | Robert Scharnhorst, ext. 242 |
| Fax | 708-331-9250 |
| Hours | Monday to Friday, 9:00 a.m. to 5:00 p.m. |
Markham permit types
Markham uses one Building Permit Application for all work. You tick the occupancy (residential, commercial or industrial, vacant or occupied), the construction type (new construction, addition, alteration, repair or replacement, demolition) and the kind of improvement, then give an estimated cost for each part of the job, including materials and labor. Every application needs a scope of work and a copy of the signed contract, plus drawings, plans and specifications showing the work, and the form lists the general contractor and each trade contractor with their license details.
Residential permits
- Plat of survey: new construction, structural additions, fences, flatwork in concrete, asphalt or pavers, sheds and similar placements need a plat of survey and legal description.
- Homeowner work: owners may do the listed work themselves, except electrical, plumbing, HVAC and roofing. They complete the permit application and a Homeowner’s Agreement and provide the declaration page of their homeowner’s insurance.
- Permit placard: the placard must be visible in a window of the property before any contractor starts work.
Building or remodeling a home here? Alliance handles home building permits, so the crew isn't waiting on the counter.
Commercial permits
The same application covers churches, restaurants, assembly, factory, educational, institutional, group home and day care occupancies, with space for the architect or engineer of record. New businesses need a city business license, and a commercial building that changes hands needs the city’s sale inspection like any home.
For tenant improvements and new commercial builds, Alliance handles commercial permit filing through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Clearing city debts. The department checks the water balance, liens and tickets, board-up and grass charges and the property file before approving the application.
- Contractor registration. Every contractor and subcontractor must be registered before the permit can issue.
- Rentals. The city’s moratorium on new rental licenses for units never registered as rentals ended on September 18, 2025, and the city has posted no later status.
- Watershed permits. MWRD does not list Markham among the municipalities allowed to issue Watershed Management Ordinance permits, so larger site work that falls under that ordinance is permitted by the district.
Not sure this scope needs a permit?
Get a free quote →Markham permit costs and fees
The department fills in the building permit fee and the review and inspection fee on each application; the city’s posted forms do not list the building permit fee scale. Ask extension 319 for the fee on your project. The fees the city does publish are these:
| Item | Fee |
|---|---|
| Contractor registration (each discipline, May 1 to April 30, not prorated) | $175 |
| Electrical contractor / state-licensed plumber registration | No fee |
| Contractor surety bond | $10,000 |
| Point-of-sale inspection | $125 |
| Rental license, single-family or two-unit (May 1 to April 30) | $150 |
| Rental license, three or more units | $200 plus $50 per unit |
| Rental license without a landscaping affidavit | $500 |
| Rental inspection, per unit | $125 |
| Rental re-inspection (2026–27 packet) | Free within 30 days; $75 for the next; $125 after that (the FAQ still shows $50) |
| Missed rental inspection (no-show, per the FAQ) | $100 first, $250 second, $500 third |
| Repairs not made within 30 days / renting without a valid certificate | $750 citation / $750 per unit per fiscal year |
| For-sale sign permit, residential / commercial (6 months) | $30 / $50 |
| Transfer stamp, per property index number | $100 on the current form ($50 in the FAQ) |
| Closing without a transfer stamp | $500 ticket |
| Foreclosure or vacant building registration (every six months) | $500 |
| Extra landscaper vehicle sticker | $5 |
As an example, a contractor who works in Markham as both a general contractor and a roofer registers twice, because each discipline is a separate registration, and pays $350 for the year. Under the 2026–27 rental packet, a six-unit apartment building pays $200 plus $50 for each of its six units, or $500, for the license, and $125 per unit, or $750, for its inspection. Credit card payments for transfer stamps carry a 2.75% fee, and personal checks are not accepted for them.
Trade permits and who may pull them
Electrical, plumbing, mechanical and roofing work goes on the same building permit application, but only registered contractors may do it; homeowners may not do those four trades themselves. All contractors must be licensed and bonded with the city, each assigned contractor is responsible for obtaining a permit for its work, and no work may begin until both the registration and the permit for that job are issued.
Rather talk it over?
Call 1-855-478-4290 →- All contractors: a $10,000 surety bond and an insurance certificate naming the city ($500,000 property damage, $1,000,000 personal injury and $1,000,000 combined single limit), with matching names and addresses on every document.
- Electrical: a current license from a testing municipality in Illinois that gives a written exam on the National Electrical Code; no registration fee.
- Plumbing: IDPH contractor registration (055) and a plumber’s license (058), or a City of Chicago journeyman plumber’s license; no bond and no fee with the 055 registration.
- Mechanical: a license from any Illinois city that administers a written exam.
- Roofing: a state roofing license from the Department of Financial and Professional Regulation.
- Fire alarm, sprinkler and elevator: the state registration or license for that trade; lawn irrigation contractors show IDPH registration (060).
Contractors are responsible for making sure every subcontractor they hire is registered with the city.
How to apply for a Markham building permit
Make sure the water bill, tickets, liens and other charges on the property are paid.
Each contractor and subcontractor files the 2026 registration with bond, insurance and state license copies.
Fill in the Building Permit Application with the PIN, construction type and cost of each trade.
Add the scope of work, the signed contract, drawings and a plat of survey where required.
File at City Hall, 16313 Kedzie Parkway; homeowners add the Homeowner’s Agreement and insurance declaration page.
Collect the permit within 10 business days of approval and post the placard in a window.
Review, corrections and what causes delay
The department reviews the application against the plans, fills in the permit fee and the review and inspection fee, and notifies you when it is approved; the permit must then be picked up within 10 business days. Unpaid city debts, unregistered subcontractors and missing signed contracts hold up approval. The department’s homeowner guidance gives permits a six-month life.
Inspections and certificates in Markham
To schedule an inspection, contact the Building and Housing Department at 708-331-4905; sale inspections are requested on the city’s Inspection Request Form. The permit placard must be visible in a window before any contractor starts work.
Rather not deal with the building department?
Get a free quote →Markham also inspects existing homes:
- Before a sale: every property sold in Markham needs a point-of-sale inspection ($125), proof of ownership, a zero water balance and paid fines. The seller then applies for a city transfer stamp at least 21 business days before closing under Ordinance 23-O-2374; stamps are never issued the same day, and closing without one brings a $500 ticket. The final water reading is good for 30 days. A buyer taking a house as-is signs a notarized affidavit agreeing to fix the listed violations within 60 days, and a buyer through a tax or foreclosure deed has 30 days to apply for the inspection and must book the final water reading once the transfer stamp is issued; in both cases nobody may move in before a certificate of occupancy is issued. A for-sale yard sign needs its own six-month permit and may be no larger than 2 by 4 feet.
- Rentals: every non-owner-occupied house, two-flat or apartment building is licensed each fiscal year (May 1 to April 30) under Chapter 121, vacant or occupied, and penalties apply to applications received after June 1. The packet asks for the recorded deed bearing Cook County and Markham stamps, proof of last year’s property taxes, the lease, IDs, a notarized landscaping affidavit and the Crime Free Lease Addendum signed by the landlord and every tenant over 18 (no digital signatures), and any city debt, including police tickets issued to tenants, must be paid first. Units are inspected yearly or when a tenant moves out; cancel at least 24 hours ahead to avoid no-show penalties, and have certifications for the roof, water heater and furnace and an extermination report ready. Rental licensing questions go to extension 314.
- Basement bedrooms: where an inspector finds a below-grade room that could be slept in, the owner and occupant file a notarized affidavit either promising it will not be used as a bedroom or agreeing to fit hardwired smoke detectors with battery backup inside and outside the room, a carbon monoxide detector within 15 feet and a properly sized egress window. Breaking that promise brings a $750 fine.
- Self-check: the city’s 2026–27 checklist covers items such as 4-inch address numbers front and rear, a sealed driveway, 100-amp electric service, GFCI outlets, handrails on stairs with more than four risers and 36-inch guards.
A property must pass inspection and receive a certificate of occupancy before anyone moves in; for a rental, that also needs a copy of the lease and the required certifications.
Illinois building code in Markham
Markham enforces the building and housing provisions of its own Code of Ordinances through the Building and Housing Department. FEMA’s Community Status Book lists the City of Markham (community 175169) as participating in the National Flood Insurance Program, with its current flood map dated August 19, 2008.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Want this handled start to finish?
Get a free quote →Markham permit search and official resources
To see permit or inspection records for a property, file the city’s Freedom of Information Act request form with the City Clerk at 16313 Kedzie Parkway; the city compiles requests within five working days unless it notifies you otherwise. Copies of recent ordinances that are not yet in the online code also come from the City Clerk’s Office.
- Markham Building and Housing Department
- Building permit application
- Contractor registration application (2026)
- Building and Housing FAQs (sales, rentals, contractors)
- Transfer stamp packet
- Self-inspection checklist, 2026–27
- Inspection request form
- Rental license packet, 2026–27
- Basement sleeping room affidavit
- As-is sale affidavit
- Tax or foreclosure deed affidavit
- For-sale sign permit application
- MWRD authorized municipalities
- Foreclosure and vacant building registration
- Rental moratorium notice (ended September 18, 2025)
- City ordinances
- FOIA request form
- FEMA Community Status Book, Illinois
Inspections are where schedules slip.
Get a free quote →Markham building permit FAQs
Do I need a permit to replace windows or a roof in Markham?
Yes. Roofs, windows, siding, gutters and downspouts are all on the city’s permit list, and roofing must be done by a state-licensed, city-registered roofer.
Can a homeowner do the work?
Yes, except electrical, plumbing, HVAC and roofing. Owners file the permit application, a Homeowner’s Agreement and their insurance declaration page.
How long is a Markham permit valid?
The department’s guidance for homeowners says permits are valid for six months; approved permits must be picked up within 10 business days of the approval notice.
What does contractor registration cost?
$175 per discipline for the May-to-April year, plus a $10,000 bond and insurance; electricians and state-licensed plumbers pay no fee.
What do I need to sell a house in Markham?
A $125 point-of-sale inspection, a zero water balance, paid fines and a city transfer stamp applied for at least 21 business days before closing.
When can construction work be done?
Monday to Saturday, 7:00 a.m. to 7:00 p.m.; no work on Sundays.
Can I get a permit if I owe the city money?
No. All outstanding debt the property owner owes the city must be paid, and every contractor registered, before a permit is issued.
Simplify Markham permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Markham sooner?
Let Alliance prepare, file, and track your Markham permits while your crew stays on the job.
More Illinois permitting guides
Cook County
Read guide →Matteson
Read guide →Maywood
Read guide →Marshall County Building Permit Guide
Read guide →Mason County Building Permit Guide
Read guide →Massac County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Markham permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.