Inside Fairview Heights, building and trade permits come from the Department of Land Use and Development at City Hall, 10025 Bunkum Road (618-489-2060), directed by Dallas Alley. Fees are set in Section 7-1-3 of the city code: a residential permit has a $50 minimum and a commercial one $100, with square-foot formulas for new buildings, and every home or rental needs a current occupancy permit backed by a passed inspection.
What requires a building permit in Fairview Heights?
The department’s rule is short: building permits must be obtained before making improvements or alterations to a property, and the department handles building, electrical, plumbing, mechanical, sign and occupancy permits for homes and businesses. The city code requires an electrical permit before any new wiring is installed or existing wiring altered, and no sign may be erected, altered or moved without a sign permit.
Permit needed
- New buildings, additions, remodels and alterations
- Storage buildings of 200 sq ft or more
- Detached garages
- Pools more than 24 inches deep
- New or altered electrical wiring
- Plumbing and mechanical work
- Demolition and moving a structure
- Signs, including temporary signs
No permit
- Fences (height and placement rules still apply)
- Changing the copy on an approved sign
- Painting, cleaning and repairing a sign without structural change
Accessory structures must stand at least 10 feet from the house, 5 feet from a side lot line, 7.5 feet from the rear lot line, 25 feet from a side lot line along a street and 60 feet from the front lot line. They may be no taller than the house or 25 feet, whichever is less, and a lot may have no more than two unless a special use permit allows more. Fences on residential lots may be up to 8 feet in side and rear yards and 4 feet in a required front yard; anything taller needs an area or bulk variance from the Zoning Board of Appeals.
What Fairview Heights decides and what the state holds
Fairview Heights adopts its own codes in Chapter 7 of its code: the 2021 International Building, Residential, Existing Building, Mechanical and Fuel Gas Codes, with city supplements to the building codes, and the 2011 National Electrical Code; the department’s page also lists the 2021 fire and energy codes. Plumbing follows the Illinois State Plumbing Code, which the city adopts with its periodic revisions, and accessibility follows the Illinois Accessibility Code. Construction documents must be prepared, signed and sealed by a design professional registered in Illinois.
Fairview Heights building department: who handles permitting
The Department of Land Use and Development issues building, sign and occupancy permits, runs the building, electrical, plumbing, property maintenance and occupancy inspections, and handles planning, zoning and code enforcement. Its director, Dallas Alley, administers the building code under Section 7-1-1 and issues floodplain development permits under the Flood Plain Code, and no permit is issued until every fee is paid. Stormwater plans are reviewed by the City Engineer, and fire district permits are separate: the building application tells applicants to call the fire district at 618-233-2121.
Short on time to read all of this?
Get a free quote →The department works only inside the city limits. Land outside them is unincorporated St. Clair County, permitted by the county Building & Zoning Department (see our St. Clair County guide).
| Detail | Information |
|---|---|
| Office | Department of Land Use and Development, City Hall, 10025 Bunkum Road, Fairview Heights, IL 62208 |
| Phone | 618-489-2060 (inspections and occupancy scheduling) |
| Fax | 618-489-2067 (on the building application) |
| City Hall | 618-489-2000; Monday to Friday, 9 a.m. to 4:30 p.m. |
| Online | MyGov portal (apply for a permit or report a violation) |
Fairview Heights permit types
The city offers two building forms. The full Application for Plan Examination and Building Permit covers building, electrical, mechanical and plumbing work and lists every contractor and license number, from excavation and concrete to roofing, sprinklers and fire alarms; the simplified version asks for the type of improvement, the proposed use, and the building, electrical, plumbing and other costs. Both forms print the city’s construction hours: 7 a.m. to 9 p.m. from September through May and 6:30 a.m. to 9 p.m. from June through August.
Residential permits
- New homes and remodels. At least three sets of construction documents and a scaled site plan with lot-line distances, street grades and finished grades; for minor work the Building Official may waive the three-set rule.
- Accessory buildings and pools. Sheds of 200 square feet or more, detached garages and pools over 24 inches deep, placed within the setbacks above.
- Electrical by the owner. An owner living in, or about to live in, the dwelling may wire it personally only after describing their qualifications and having them approved by the Electrical Inspector.
- Occupancy. Every rental and owner-occupied property must hold an updated occupancy permit, renewed whenever the tenancy changes.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Commercial projects follow the same document rules, with sealed engineering details for structural, mechanical, plumbing and electrical work and a stormwater management plan under Ordinance 840-95, prepared by an Illinois professional engineer and reviewed by the City Engineer. Sites without public sewer must show the private sewage system on the site plan. Plan review for commercial new construction, additions and alterations valued over $25,000 costs $150, and annual inspections are $250.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning certification. $25 with a building permit or $50 on its own.
- Planning Commission. An 11-member advisory board that recommends to the City Council on special use permits, plats, rezonings and text amendments; it meets on the second Tuesday, and items must reach Land Use and Development at least a month ahead.
- Zoning Board of Appeals. Seven members hear area-bulk variances and appeals of zoning decisions.
- Floodplain. No development may start in the floodplain without a development permit from the Director, and the city’s freeboard standard is 3 feet above the base flood elevation.
- Erosion control and driveways. The code’s fee table lists an erosion and sedimentation control permit, with no separate fee when it is included in a building permit; driveways need their own permit.
Fairview Heights permit costs and fees
Building fees are in the table of fees in Section 7-1-3 of the city code (Supplement 100, February 2025), and development review fees in Section 14-14-19 (Supplement 103, August 2026). Every permit fee includes the initial inspections, fees are paid before the permit is issued, and a job that cannot be measured by square feet pays the minimum.
| Item | Fee |
|---|---|
| Minimum permit: residential / commercial (building, electric, plumbing, mechanical) | $50 / $100 |
| New house, finished living space | sq ft x 74 x 0.69 x 0.005 |
| New house, unfinished space or garage | sq ft x 61 x 0.20 x 0.005 |
| Residential remodel | sq ft x 74 x 0.69 x 0.005 |
| New commercial building or remodel | sq ft x 74 x Appendix A multiplier x 0.0062 |
| Commercial plan review (work over $25,000) | $150 |
| Demolition: residential / commercial | $75 / $150 |
| Each extra inspection after a failure | $50 |
| Electrician certificate of registration | $35 |
| Occupancy permit: new / change / re-issue within 12 months | $50 / $20 / $10 |
| Zoning certification with / without a building permit | $25 / $50 |
| Area-bulk variance / appeal or interpretation | $350 / $200 |
| Special use or rezoning | $350 plus $25 per acre above one |
| Sign permit | $100 plus 25 cents per sq ft (electric permit separate) |
| Erosion and sedimentation control permit | $50 plus $50 per acre or fraction over 1 acre (none if included in a building permit) |
| Driveway permit | $35 plus $2 per lineal foot of culvert |
| Building code appeal | $100 |
Rather talk it over?
Call 1-855-478-4290 →Worked example from Section 7-1-3: a new house with 2,000 square feet of finished living space and a 500-square-foot garage pays 2,000 x 74 x 0.69 x 0.005 = $510.60 plus 500 x 61 x 0.20 x 0.005 = $30.50, or $541.10 for the building permit. The older full building application, revised in 2019, still asks for a $100 review fee with three sets of drawings; the code table is the adopted schedule. Building, electrical, mechanical, plumbing or pool work started before the permit is issued pays double fees.
Trade permits and who may pull them
Fairview Heights issues electrical, plumbing and mechanical permits itself, each with a $50 residential or $100 commercial minimum, and its inspectors check that work before it is covered.
- Electrical: applicants say whether they are a qualified electrical contractor or electrician, electricians pay $35 for a city certificate of registration, and no permit goes to anyone the Electrical Inspector judges unqualified. New or remodeled wiring may not be connected to power until it passes final inspection and receives a certificate of approval.
- Plumbing: the city enforces the Illinois State Plumbing Code through its Plumbing Inspector, and plumbers must meet the Illinois Plumbing License Law (licenses come from the Illinois Department of Public Health).
- Mechanical and fuel gas: the 2021 International Mechanical and Fuel Gas Codes apply.
- Fire protection: sprinkler and fire alarm contractors are listed on the full application, and fire district permits are separate.
The full application asks for a license number for each contractor on the job. Permits are not transferable.
Rather not deal with the building department?
Get a free quote →How to apply for a Fairview Heights building permit
Land outside the limits is unincorporated St. Clair County.
Use the zoning map and minimum district regulations, and call 618-489-2060 if unsure whether a permit is needed.
Variances go to the Zoning Board of Appeals, special uses and rezonings to the Planning Commission and City Council.
Three sets of sealed construction documents, a scaled site plan and, where required, a stormwater plan.
Use the full or simplified application at City Hall, or start the application through the MyGov portal.
Pay the fees, keep the stamped approved plans on site and call for inspections.
Review, corrections and what causes delay
The city does not publish a review time. One of the three approved sets comes back to the applicant and must stay on site for the Building Official. For floodplain work, the Director may not issue the development permit until every other federal, state and local permit has been obtained. Construction must begin within six months of issue, and the full application says permits are valid for two years. A decision of the code official can be appealed to the Board of Appeals within 20 days, with a $100 fee.
Inspections and certificates in Fairview Heights
Inspection requests must be called in at least 24 hours ahead, and inspections are made Monday to Friday only, never on weekends or holidays. The applicant is responsible for telling the department when each stage is ready. Electrical work is inspected at any temporary service, at rough-in before covering, at the permanent service and after construction before occupancy. Each extra inspection needed because work failed costs $50 until it passes.
No new building may be occupied until it has passed every inspection and received a certificate of occupancy from Land Use and Development. For existing homes and rentals, Section 15-1-19 bars anyone from occupying a property until the city has issued an occupancy permit. The owner or manager schedules a property maintenance inspection at 618-489-2060; once it passes, within the last 12 months, the occupancy application and fee are filed at City Hall and the permit is issued. Changes to the permit for a rental may need the landlord’s approval. Sign permits lapse if the sign is not finished within six months, and temporary signs may be permitted once a quarter for 10 days.
Illinois building code in Fairview Heights
The city code adopts the 2021 International Building, Residential, Existing Building, Mechanical and Fuel Gas Codes, the 2011 National Electrical Code and the Illinois State Plumbing Code; the department’s permits page also lists the 2021 fire and energy codes and the 2014 Illinois Plumbing Code, while the full building application, last revised in 2019, still prints the 2012 codes. The Flood Plain Code in Chapter 18 (Ordinance 1906-21A, November 17, 2021) requires a development permit for any floodplain work, posted in plain view during construction, and sets freeboard at 3 feet above the base flood elevation.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Fairview Heights building permit FAQs
How much is a building permit in Fairview Heights?
At least $50 for residential work and $100 for commercial; new houses and remodels use the square-foot formulas in Section 7-1-3, so 2,000 finished square feet plus a 500-square-foot garage comes to $541.10.
Do I need a permit for a fence?
No, but fences may be no taller than 8 feet in side and rear yards or 4 feet in a front yard on residential lots without a variance.
Do I need a permit for a shed?
Yes for storage buildings of 200 square feet or more, detached garages and pools deeper than 24 inches.
Do I need an occupancy permit when I move?
Yes. Every rental and owner-occupied property needs a current occupancy permit after a passed property maintenance inspection; a new permit costs $50.
Can I do my own electrical work?
Only in a dwelling you live in or will live in, and only after the Electrical Inspector approves your qualifications.
How far ahead must I call for an inspection?
At least 24 hours; inspections run Monday to Friday.
What are the construction hours?
7 a.m. to 9 p.m. from September through May and 6:30 a.m. to 9 p.m. from June through August.
Fairview Heights permit records and official resources
The MyGov collaborator portal shows code cases, permits and project updates for registered users. Other city records are requested through the City Clerk’s Office (618-489-2000) on the city FOIA request form; police records use a separate form. Most requests are answered within five business days, or 21 business days for a commercial request; the first 50 pages are free and later pages cost 15 cents each, and records can also be viewed in the office.
Inspections are where schedules slip.
Get a free quote →- Fairview Heights building, occupancy and sign permits
- Building inspections, accessory structures and fences
- Full building permit application
- Simplified building permit application
- Accessory structure basic requirements
- Residential occupancy permit application
- Property maintenance inspection guide
- Planning and Zoning, commissions and forms
- City code of ordinances (fees in Sections 7-1-3 and 14-14-19)
- MyGov permit portal
- Freedom of Information Act requests
- Illinois Department of Public Health plumbing
Simplify Fairview Heights permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Fairview Heights sooner?
Let Alliance prepare, file, and track your Fairview Heights permits while your crew stays on the job.
More Illinois permitting guides
St. Clair County
Read guide →O'Fallon
Read guide →Shiloh
Read guide →Fayette County Building Permit Guide
Read guide →Ford County Building Permit Guide
Read guide →Fox Lake Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Fairview Heights permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.