Inside East St. Louis, permits come from the Department of Regulatory Affairs at City Hall, 301 River Park Drive, directed by DeJuan Byrd (618-482-6722). The city requires a permit for a long list of jobs, from new structures and roofs to fences, siding, sheds and driveways; contractors register with the city ($160 for a general contractor, $110 for most trades), and a 100 to 200 amp electrical service permit costs $110.
What requires a building permit in East St. Louis?
East St. Louis publishes its own list of projects that need a city building permit and says the list is not complete. It reaches well beyond new buildings: fences, siding, sheds, roofing tear-offs, replacement doors and windows where the opening size changes, sewer repairs and even low-voltage alarm and phone wiring are on it.
Structures and exteriors
- New structures and any structural change
- Shoring and foundation repairs
- Decks and stairs; concrete, asphalt or paver driveways, sidewalks, patios and stoops
- Roofing, re-roofing or tear-off
- Siding
- Doors and windows where the opening size changes
- Fences and sheds
- Pools, spas and hot tubs
- Signs, banners and tents
- Demolitions
Systems and site work
- Extensive interior remodeling
- New electric service or added devices needing new lines
- Low-voltage alarms and phone wiring
- Heating and air conditioning systems
- Plumbing, including water heaters
- Sewer repairs and cleanouts
- Fire sprinklers
- Grading changes, retaining walls and other landscaping that changes the topography
The permit list exists so that each project meets the building codes the city adopted to protect residents’ health, safety and welfare. The city does not publish a list of exempt work. Anyone unsure whether a job needs a permit can call City Hall at 618-482-6600 between 8:30 a.m. and 4:30 p.m., Monday to Friday.
What East St. Louis decides and what the state holds
The city chooses its own codes. Its building codes page lists the 2024 International Building Code for both commercial and residential buildings, the 2024 International Fire, Mechanical and residential Energy Conservation Codes, the 2014 National Electrical Code, ASME A17.1 (2000) for elevators and NFPA 101 (2003) for life safety, with the 2009 energy code as adopted by the state for commercial and industrial buildings. Plumbing follows the State of Illinois Plumbing Code and accessibility the Illinois Accessibility Code. The city’s licensing page adds that the state requires every building other than a detached one- or two-family dwelling on its own lot to be designed, and its plans sealed, by an Illinois-licensed architect, structural engineer or professional engineer.
Short on time to read all of this?
Get a free quote →East St. Louis building department: who handles permitting
The Department of Regulatory Affairs issues building, electrical and demolition permits, registers contractors, issues business licenses, inspects construction and land development, issues certificates of occupancy, and keeps the vacant building register and the 2022 parcel-based zoning map. DeJuan Byrd is the Director of Regulatory Affairs, and the residential demolition form is approved by the Director. The department’s Code Enforcement Division handles property maintenance complaints through the city’s administrative adjudication court.
Regulatory Affairs works only inside the city limits. Land outside them is unincorporated St. Clair County, permitted by the county Building & Zoning Department (see our St. Clair County guide).
| Office | Contact |
|---|---|
| Department of Regulatory Affairs (Director) | City Hall, 301 River Park Drive, East St. Louis, IL 62201; 618-482-6722 |
| License and permit coordinator (permits, inspection requests, contractor registration) | 618-482-6826 |
| Permit questions | City Hall, 618-482-6600; Monday to Friday, 8:30 a.m. to 4:30 p.m. |
| Code Enforcement Division | 618-482-6791 |
| City Clerk (FOIA) | City Hall, 301 River Park Drive |
East St. Louis permit types
Regulatory Affairs posts its own forms: an electrical permit application, a residential demolition application, a contractor’s registration application, a request for variance and the vacant building registration. For a general building permit application, contact Regulatory Affairs at 618-482-6826.
Residential permits
- Building. New homes, additions, renovations and alterations follow the city’s inspection sequence from footing to final; a detached one- or two-family house on its own lot does not need sealed design-professional plans under the state rule the city cites.
- Electrical by the owner. Electrical permits can go to residential property owners who show they can do the work to the city and national codes; the city’s license rule exempts single-family homeowners working on their own residence.
- Demolition. The residential form covers buildings of fewer than four units. Utilities must be capped and removed with written verification from each utility, the sanitary sewer sealed with a concrete plug, the basement floor broken up, neighbors told 48 hours ahead, and the lot cleared, filled and left clean and safe within 30 days of the permit, then re-vegetated if not redeveloped. If the site will be used for anything other than housing, the commercial application applies.
- Vacant buildings. Owners of vacant houses must register them with Regulatory Affairs and submit a plan to improve the property; fines run from $100 to $500 a day.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
Commercial, industrial and other buildings that are not detached one- or two-family homes need plans sealed by an Illinois-licensed architect or engineer. The city inspects the full site as well as the building: grading and landscaping, on-site and off-site utility work, water and sewer lines and taps, and driveways and parking lots, including striping where it applies. Every business in the city also needs an annual business license, bought by December 31 each year, and vacant commercial buildings fall under the same registration ordinance as houses.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning. The city’s 2022 parcel-based zoning map shows each property’s district.
- Variances. A request for variance records the denied permit application, any appeal, the published notice and notice to adjacent owners, and goes to a hearing before the board.
- Contractor registration. Contractors file the city’s registration application, with insurance, bond and workers’ compensation papers.
- Floodplain. FEMA’s Community Status Book lists the City of East St. Louis (community 170626) as participating in the National Flood Insurance Program, with a current flood map dated November 5, 2003.
East St. Louis permit costs and fees
The city site does not post a building permit fee schedule; ask Regulatory Affairs (618-482-6826) for the fee on a building permit. The fees printed on the city’s own forms are below, and every form says fees must be paid before the permit is issued and work starts.
| Item | Fee |
|---|---|
| Contractor registration: general | $160 |
| Contractor registration: demolition | $120 |
| Contractor registration: electrical, plumbing, HVAC, stationary engineer or specialty | $110 each |
| Electrical: residential meter base / commercial meter base | $110 / $220 |
| Electrical service 100–200 amps | $110 |
| Electrical service 400–1,200 amps | $200 |
| Electrical service over 1,200 amps | $315 |
| Electrical wiring, 400–800 sq ft | $110 |
| Electrical wiring, 800–1,200 sq ft | $215 |
| Meter base installation or inspection up to 200 amps | $110 each |
| Third failed inspection for the same violation | The inspection fee is paid again |
| Unregistered vacant building | Fines of $100 to $500 a day |
| Electrical code violations | Up to $500, each day a separate offence |
Rather talk it over?
Call 1-855-478-4290 →Contractor registration also requires a certificate of liability insurance, a $10,000 performance or surety bond and workers’ compensation cover, all at the time of registration. For a demolition the city itself requests, the contractor must also hold a $5,000 surety bond on file, a bid bond and a performance bond equal to the bid.
Trade permits and who may pull them
East St. Louis requires electricians to be licensed: apart from single-family homeowners working on their own residence, every electrician working in the city must be licensed, and the electrical permit form asks for the contractor’s city license number and its expiration date.
- Electrical: permits cover new or upgraded services and wiring, and the form asks whether the utility company has been notified. Fees run from $110 for a house service to $315 for services over 1,200 amps.
- Plumbing: the state requires plumbers to be licensed (by the Illinois Department of Public Health), the city follows the 2024 State of Illinois Plumbing Code, and plumbing contractors also register with the city for $110. Water heaters and sewer repairs or cleanouts need a permit.
- Roofing: the state requires roofers to be licensed, and every re-roof or tear-off needs a city permit.
- HVAC and specialty trades: register with the city for $110; heating and air conditioning systems need a permit.
- Fire sprinklers: listed among the projects that need a permit.
The registration form asks for the firm’s principals and their certificates, years in business, where the company is licensed, whether a contractor’s or demolition license has ever been revoked, lawsuits in the last 18 months, and references from customers served in the past two years.
How to apply for an East St. Louis building permit
Land outside the limits is unincorporated St. Clair County.
Find the district on the 2022 parcel-based zoning map and seek a variance first if the project does not fit.
File the contractor’s registration with insurance, bond and workers’ compensation papers.
Have an Illinois architect or engineer seal plans for anything other than a detached one- or two-family home.
Submit the application to Regulatory Affairs at City Hall and pay before any work starts.
Phone 618-482-6826 at each stage, allowing 24 hours.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
The city does not publish plan review times. Have the pieces the forms ask for ready before applying: the contractor’s city registration or license number, insurance and bond papers, sealed plans where the state requires them, and any variance already granted, since a variance request needs a hearing with published notice and notice to adjacent owners. A demolition permit also depends on written verification from each utility that its service has been capped and removed. Questions about whether a project needs a permit at all go to City Hall at 618-482-6600.
Inspections and certificates in East St. Louis
Inspections are requested by phone at 618-482-6826, allowing 24 hours; give the address, the name and type of inspection and the permit number, and call only when the work is finished. New buildings, additions, renovations and alterations are inspected at the footing (bottom of trench, before concrete), foundation (before backfill), slab (before concrete), electrical and plumbing rough-ins, framing (after the roughs pass and before insulation), insulation (before drywall), final electric, and the final building, electrical, HVAC and plumbing inspections. Site work, utility work on and off the site, water and sewer taps and driveways and parking lots are inspected too.
If an inspection fails, the city asks you not to call for a re-inspection until the problems are fixed. A second failure for the same violation brings a violation notice, and the next inspection then takes place three business days after the request; if the third inspection fails, the fee must be paid again. All new construction must pass the city’s inspections before Regulatory Affairs issues a certificate of occupancy.
Illinois building code in East St. Louis
East St. Louis lists the 2024 International Building Code for commercial and residential construction, the 2024 International Fire, Mechanical and residential Energy Conservation Codes, the 2014 National Electrical Code, the 2024 State of Illinois Plumbing Code, the 2009 energy code as adopted by the state for commercial and industrial buildings, ASME A17.1 (2000) for elevators, NFPA 101 (2003) and the 1997 Illinois Accessibility Code. The city’s City Code page links to its code of ordinances on an outside code library.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Want this handled start to finish?
Get a free quote →East St. Louis building permit FAQs
Do I need a permit for a fence, shed or new roof in East St. Louis?
Yes. Fences, sheds, roofing, re-roofs and tear-offs, and siding are all on the city’s list of projects that need a building permit.
How much does contractor registration cost?
$160 for a general contractor, $120 for demolition, and $110 for electrical, plumbing, HVAC, stationary engineer and specialty contractors, with insurance, a $10,000 bond and workers’ compensation.
Can a homeowner do their own electrical work?
Single-family homeowners working on their own residence are exempt from the city’s licensing requirement for electricians, and owners who show they can do the work to code can get a permit.
How do I schedule an inspection?
Call 618-482-6826 with the address, inspection type and permit number, and allow 24 hours.
What happens if I fail an inspection twice?
You receive a violation notice and the next inspection is three business days after you ask; a third failure means paying the fee again.
Do I have to register a vacant building?
Yes. Owners of vacant houses and commercial buildings must register with Regulatory Affairs and file an improvement plan, or face fines of $100 to $500 a day.
Who issues the certificate of occupancy?
The Department of Regulatory Affairs, after all new construction passes the city’s inspections.
East St. Louis permit records and official resources
Requests to see or copy city records, including permit files, go in writing to the City Clerk, who serves as the city’s Freedom of Information Act officer. Use the city’s FOIA request form or your own letter giving your name, address and phone number, a detailed description of the records and whether the request is for commercial use, and deliver it in person at City Hall or by mail to 301 River Park Drive; the Clerk’s office also takes requests by email.
Inspections are where schedules slip.
Get a free quote →- East St. Louis Department of Regulatory Affairs
- Projects that require a building permit
- Building codes in force
- Required inspections and inspection requests
- Licenses required (electricians, design professionals)
- Regulatory Affairs forms
- Electrical permit application and fees
- Contractor’s registration application
- Residential demolition permit application
- Request for variance
- Vacant building registration
- Parcel-based zoning map, 2022
- Code Enforcement Division
- Freedom of Information Act requests
- FEMA Community Status Book, Illinois
- Illinois Department of Public Health plumbing
Simplify East St. Louis permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in East St. Louis sooner?
Let Alliance prepare, file, and track your East St. Louis permits while your crew stays on the job.
More Illinois permitting guides
St. Clair County
Read guide →Fairview Heights
Read guide →O'Fallon
Read guide →Edgar County Building Permit Guide
Read guide →Edwardsville Building Permit Guide
Read guide →Effingham Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about East St. Louis permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.