In Belleville, any improvement to private property inside the city limits needs a permit from the Health, Housing & Building Department at 2300 W. Main St., Building M, Suite M113 (618-233-6817), led by Director Scott Tyler. Applications can be emailed to building@belleville.net, and staff reply with the approval and the permit cost, which varies with the size and scope of the job; electrical permits start at $75.
What requires a building permit in Belleville?
Belleville’s rule is broad: any improvement to private property within the corporate limits needs the appropriate permit from Health, Housing & Building. The building permit application covers the demolition, erection, moving or alteration of buildings and the use of buildings and premises under the city’s building and zoning ordinances, and separate applications cover electrical, plumbing and mechanical work, dumpsters and home occupations. The department’s pages publish no list of work that is exempt.
Permit or approval needed
- New buildings, additions and alterations
- Demolition and moving a building
- Electrical service upgrades, wiring and appliances
- Plumbing fixtures and repiping
- Furnaces and other gas, oil or solid-fuel equipment
- Dumpsters
- Home occupations
- Moving into a home (occupancy permit)
Separate city approvals
- Commercial occupancy for a new or changed business
- Design review in the three local historic districts
- Variances and special uses (Zoning Board of Appeals)
- Rental unit registration and inspection
Two code rules stand out on roofs and walls: the Building Commissioner’s memo says the city requires an ice barrier and drip edge on roofs under the residential and building codes, and a vapor retarder on exterior walls under the 2006 International Residential Code.
What Belleville decides and what the state holds
Belleville picks its own codes. Its department page lists the 2006 International Building, Residential and Property Maintenance Codes, an International Energy Conservation Code, the 2014 National Electrical Code, the 2015 International Fire Code with city amendments and the 2006 National Fuel Gas Code. Plumbing follows the current Illinois State Plumbing Code, and the city lists current ADA standards for accessibility. The building permit application requires plans prepared and sealed by an Illinois-licensed architect or engineer for all public-use buildings, including commercial, industrial and institutional ones.
Belleville building department: who handles permitting
The Health, Housing & Building Department issues building, electrical, plumbing and mechanical permits, inspects construction, licenses electrical contractors, registers building contractors and runs the residential occupancy and rental inspection programs. Scott Tyler is the Director of Health, Housing & Building, and the building permit application is issued by the office of the Zoning Enforcement Officer and Building Commissioner. Zoning, site plan review, subdivision plats, annexation and commercial occupancy permits belong to the Economic Development, Planning & Zoning Department, which works with Health, Housing & Building on development cases.
Short on time to read all of this?
Get a free quote →The department works only inside the city. Land outside Belleville’s limits is unincorporated St. Clair County, where the county Building & Zoning Department issues permits (see our St. Clair County guide).
| Office | Contact |
|---|---|
| Health, Housing & Building (permits, inspections, occupancy) | 2300 W. Main St., Building M, Suite M113, Belleville, IL 62226; 618-233-6817 (option 1 for housing inspections); fax 618-233-8152; building@belleville.net; Monday to Friday, 8 a.m. to 5 p.m. |
| Zoning verification before a building permit | 618-233-6810, ext. 1251 |
| Economic Development, Planning & Zoning (commercial occupancy, site plans) | 618-233-6810, ext. 1250; edpz@belleville.net |
| City Clerk (records, FOIA) | City Hall, 101 South Illinois Street; 618-233-6810 |
Belleville permit types
The building permit application asks for the owner and applicant, the parcel number, subdivision and lot, the zoning district, the existing and proposed use, the lot and building size, the type of construction, the estimated total cost including labor, the subcontractors for electrical, plumbing, HVAC and roofing work, and any architect or engineer with an Illinois license number. A site plan drawn to scale must show the lot, every existing and proposed building, driveway and parking area, and the front, side and rear yards.
Residential permits
- Building. New homes, additions, garages, decks and alterations use the building permit application; the form asks whether the street has a sewer and whether a garage is attached.
- Electrical. A service upgrade or rewiring starts at $75; an owner may take out the permit only for a single-family home they live in, doing the work personally and promising to live there at least two years.
- Plumbing. Fixtures cost $8 each and repiping $15; the permit goes to a licensed, bonded plumber, to an owner-occupant of a single-family home or duplex, or to a tenant who will live there at least six months.
- Mechanical. Furnaces and other gas, oil and solid-fuel burners are permitted by the city’s gas, oil and solid fuel burner inspector, with fees by unit type and BTU input.
- Occupancy. Anyone moving into a Belleville home needs a Residential Certificate of Occupancy, issued after a city housing inspection of the electrical, plumbing and structural elements.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
Since May 1, 2008, every business opening in commercial space needs a Commercial Occupancy Permit for a new business, new ownership, a temporary or seasonal use, an expansion or a move within the city. The application, with a site plan, costs $100, and the Fire and Building Departments inspect the space before the permit and any business license are issued; zoning verification and the Treasurer’s sign-off are also required. Technical work found during those inspections must be done by a City of Belleville licensed contractor, food businesses also need the St. Clair County Health Department, and a fire inspection follows every year. Building improvements need their own building permit, and commercial plans must be sealed by an Illinois architect or engineer.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning check. Both the building and mechanical forms tell applicants to verify zoning, and any variance, before starting; a zoning classification request form is online.
- Zoning Board of Appeals. Variances and special uses go to the board, which meets at 7 p.m. on the fourth Thursday of the month (third Thursday in November and December) in the City Council Chambers, 101 S. Illinois St.
- Planning Commission. Meets at 7 p.m. on the first Wednesday of the month; the city also reviews subdivision plats, lot splits and residential and commercial site plans.
- Historic districts. Exterior work in the Old Belleville, Hexenbuckel and Oakland districts needs a Design Review Request, filed with Health, Housing & Building; the Historic Preservation Commission meets at 6 p.m. on the second Wednesday.
- Erosion control. Temporary erosion control must be in place during construction and permanent measures kept up afterwards.
- Electrical service. For a new or upgraded service, the electrical form asks whether Ameren Illinois has been notified, with a copy of the service order.
Belleville permit costs and fees
Belleville does not post a building permit fee schedule; its department page says fees vary with the size and scope of the project, and staff send the cost with the approval once an emailed application is reviewed. The fees the city prints on its forms and handouts are below.
| Item | Fee |
|---|---|
| Electrical service, residential or commercial | $75 |
| Residential electrical code-correction repairs | $75 |
| Electrical appliances (water heater, furnace) | $75 plus $10 per appliance |
| Illuminated signs | $75 plus $25 per sign |
| Energy management system | $125 |
| Minimum electrical permit | $75 |
| Electrical re-inspection after a notice of noncompliance | $50 |
| Electrical work started without a permit | Double the fee |
| Plumbing fixtures (each) | $8 |
| Repiping | $15 |
| Residential occupancy permit | $55 |
| Rental unit registration (yearly, by October 31) | $30 per unit |
| Rental unit inspection / second failed re-inspection | $65 per unit / $50 |
| Commercial occupancy application with site plan | $100 |
| Sign in the Area of Special Control | $75 |
Rather talk it over?
Call 1-855-478-4290 →Late rental registrations pay double. The occupancy counter takes cash, checks, money orders and cards, with a 2.75% convenience fee on card payments, and all sewer bills for the property must be paid before an inspection or permit. Copy fees for public records are set in Section 31.016 of the city code.
Trade permits and who may pull them
Belleville licenses its own electricians. Electrical contractors register for the city’s examination ($50), pay a $50 license fee each year, post a $10,000 bond and carry $100,000 of bodily injury and property damage insurance; a renewal up to 60 days after May 1 costs $100, after which the contractor must apply again as a new applicant. The department posts separate lists of city-licensed electrical contractors for residential, solar and commercial or industrial work.
- Electrical: permits go to licensed electrical contractors, or to an owner doing the work personally in the single-family home they live in. Fines for violations run up to $500, and each day counts as a separate offence.
- Plumbing: the city issues plumbing permits to licensed, bonded plumbing contractors under the state’s plumbing license law (plumbers are licensed by the Illinois Department of Public Health), and to owner-occupants and long-term tenants as described above; septic and aeration systems are listed as $8 fixtures on the form.
- Mechanical: the application goes to the gas, oil and solid fuel burner inspector, lists each unit with its BTU input, and must be paid before work begins.
- General contractors: building contractors register with the city under Ordinance 5922, Section 150.36, in effect since October 29, 1998, giving their business details, years in business and tax ID.
The city also has a Building Code Board and an Electrical Commission among its appointed boards.
How to apply for a Belleville building permit
Land outside the limits is unincorporated St. Clair County.
Call 618-233-6810, ext. 1251, about the zoning district and any variance before work starts.
File a Design Review Request in a historic district, or take a variance or special use to the Zoning Board of Appeals.
Fill in the building, electrical, plumbing or mechanical form with the site plan and any sealed plans.
Email it to building@belleville.net or return it to the Suite M113 office; staff can help on 618-233-6817, ext. 4216.
Every form says all fees must be paid before the permit is issued and work starts.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
The city does not publish a review time. Staff contact the applicant by email or phone with the approval and the permit cost. The permit is granted on the statements in the application and can be revoked without notice if any of them proves untrue. The application asks whether Zoning Board of Appeals approval or a zoning variation is needed, so those decisions come before the permit, as does design review in a historic district.
Inspections and certificates in Belleville
By signing the building permit application, the applicant agrees to call the enforcing officer at four stages: before pouring footings, at the foundation before backfill, at rough framing, and at final inspection before occupancy. The officer inspects the premises when construction is complete. A permit becomes void if construction does not start within six months of issue and at least one inspection has not been recorded. The plumbing and mechanical forms require the applicant to call for inspections at the right stages and on completion.
For existing homes, a Residential Certificate of Occupancy is required before anyone can legally move in. Owners selling a house are advised to book the housing inspection as soon as they decide to sell, buyers whose seller did not have one must schedule and pay for it, and tenants bring their lease, the Crime Free lease addendum, the background-check form and the $55 fee. The number of people allowed in a unit depends on bedroom floor area. The city recommends that landlords allow at least three weeks before move-in, since inspections are booked first come, first served, and some corrections found in a failed inspection need their own permit.
Illinois building code in Belleville
Belleville’s department page lists the 2006 International Building, Residential and Property Maintenance Codes, an International Energy Conservation Code, the 2014 National Electrical Code with Section 605 of the 2015 International Fire Code as amended, the 2015 International Fire Code, the 2006 National Fuel Gas Code, the current Illinois State Plumbing Code and current ADA standards. The online code of ordinances is codified through June 30, 2024; 2026 ordinances not yet codified include changes to the dumpster permit section (Ordinances 9453-2026 and 9485-2026, the second protecting brick streets), a zoning amendment on short-term rentals, minor land divisions and data centers (9460-2026) and a minimum square footage amendment (9510-2026). FEMA’s Community Status Book lists the City of Belleville (community 170618) as participating in the National Flood Insurance Program, with a current flood map dated November 5, 2003, and no Community Rating System class.
Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Want this handled start to finish?
Get a free quote →Belleville building permit FAQs
How do I submit a permit application in Belleville?
Email the completed form to building@belleville.net or bring it to Health, Housing & Building at 2300 W. Main St., Suite M113; staff reply with the approval and the cost.
How much is a building permit?
The city publishes no building fee schedule; the cost depends on the size and scope of the job and is given when the application is approved. Electrical permits start at $75.
Can a homeowner do their own electrical or plumbing work?
Electrical, only in a single-family home the owner lives in and will keep living in for at least two years, doing the work personally. Plumbing, for an owner-occupied single-family home or duplex.
Do I need an inspection before moving into a house?
Yes. A Residential Certificate of Occupancy, issued after a city housing inspection, is required before a home can be legally occupied; the permit costs $55.
How long does a building permit stay valid?
It becomes void if construction does not begin within six months of issue with at least one inspection recorded.
What does it cost to open a business in an existing building?
A Commercial Occupancy application with site plan costs $100, plus any building permit, sign or business license fees.
Do I need approval to change the outside of a historic house?
Yes, in the Old Belleville, Hexenbuckel and Oakland districts a Design Review Request is required for exterior improvements.
Belleville permit records and official resources
The City Clerk is the official custodian of city records, including licenses and permits, and is the city’s Chief FOIA Officer. The city asks for public record requests through its online FOIA portal, linked from the Clerk’s page, where requests can be filed and tracked at any hour; copy charges follow Section 31.016(B)(3) of the city code. Health, Housing & Building also publishes annual building and development reports.
Inspections are where schedules slip.
Get a free quote →- Belleville Health, Housing & Building Department
- Building permit application
- Electrical permit application and fees
- Plumbing permit application and fixture fees
- Mechanical permit application
- Building contractor registration
- Residential occupancy permit process
- Roofing ice barrier and vapor retarder memo
- Swimming pool and spa regulations
- Economic Development, Planning & Zoning
- Commercial occupancy permits
- Commercial occupancy instructions and checklist
- Zoning Board of Appeals
- Planning Commission
- Historic Preservation Commission and design review
- City code of ordinances and non-codified ordinances
- City Clerk and FOIA requests
- FEMA Community Status Book, Illinois
- Illinois Department of Public Health plumbing
Simplify Belleville permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Belleville sooner?
Let Alliance prepare, file, and track your Belleville permits while your crew stays on the job.
More Illinois permitting guides
St. Clair County
Read guide →East St. Louis
Read guide →Fairview Heights
Read guide →Bellwood Building Permit Guide
Read guide →Belvidere Building Permit Guide
Read guide →Bensenville Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Belleville permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.