In the Village of Bartlett, building permits come from the Building Division of Planning & Development Services at Village Hall, 228 S. Main Street (630-837-0800). A permit is needed before a building or structure is built, enlarged, repaired, altered, replaced or moved, and also when a property changes owner or occupant. Applications, status tracking and inspection requests are online. Permit fees follow the estimated value of the work, from $40 under $500 to $12 per $1,000 of value for work over $10,000, plus $75 each for electrical and plumbing review where they apply.
What requires a building permit in Bartlett?
Bartlett’s rule is broad: a building permit is needed before any building or structure is erected, constructed, built, enlarged, repaired, altered, replaced or moved, and when a property’s ownership or occupancy changes. The Building Division lists the permits it issues, and the list shows how far that reaches.
Homes and yards
- Additions, remodels and new single-family houses
- Accessory buildings and structures, decks, fences
- Driveways, patios, service walks and stoops
- Roofs, siding, soffit, fascia, gutters, windows and doors
- HVAC, water heaters, radon mitigation and solar
- Sewer repairs, lawn sprinkler systems, pools and hot tubs
- Miscellaneous electric and plumbing work
- Temporary dumpsters, tents and trailers
Business and multi-family
- New multi-family and non-residential construction
- Commercial build-outs
- Racking and parking lot improvements
- Fire alarm and fire sprinkler systems
- Signs
- Erosion control and grading
- Demolition
- Occupancy for a change in owner
Because the rule covers a change of owner or occupant, a property changing hands in Bartlett involves the Building Division too: the village issues a Change in Ownership/Occupancy Certificate for $150.
What Bartlett decides and what the state holds
Bartlett writes its own building code and penalties into the Bartlett Municipal Code (work without a permit is dealt with under Section 9-23-4), sets its own fees and licenses the contractors who work in the village. Plumbing still follows the statewide Illinois Plumbing Code, with plumbers licensed by the Illinois Department of Public Health, and roofing contractors hold a state roofing license.
Bartlett building department: who handles permitting
The Building Division within Planning & Development Services issues every permit on its list and runs the inspections and occupancy certificates that follow. Bartlett Public Works (630-837-0811) inspects public sidewalks and utilities in the right-of-way during driveway permit review and serves as the village’s stormwater contact.
Short on time to read all of this?
Get a free quote →Bartlett straddles three counties. The 2025 Census estimates put 23,799 of its 40,855 residents in DuPage County, 16,962 in Cook County and 94 in Kane County. Inside the village, the Building Division issues the permit whichever county the lot is in. Land outside the village limits goes to the county: the Cook County Department of Building and Zoning (312-603-0500), DuPage County Building and Zoning (630-407-6700) or the Kane County Building & Zoning Division in Geneva (630-232-3485), each for its unincorporated area only.
| Detail | Information |
|---|---|
| Office | Building Division, Planning & Development Services, Village of Bartlett, 228 S. Main Street, Bartlett, IL 60103 |
| Village Hall | 630-837-0800 |
| Public Works (sidewalks, stormwater) | 630-837-0811 |
| Applications and inspections | Apply Online, Track Your Permit Status and Request Inspections links for each permit type |
| Contractor licenses | Online licensing portal |
Bartlett permit types
Each permit type on the Building Division page has its own link to apply online, track the permit and request inspections. Two new-construction permits sit apart from the rest: one for single-family homes and one for multi-family and non-residential buildings.
Residential permits
The village posts a handout for most home projects: sheds and accessory buildings, basement build-outs, concrete and paver patios, decks, driveways, electrical work, fences, attached and detached garages, insulation, lawn sprinklers, pools and hot tubs, roofs, room additions and three-season rooms, siding, solar, tents, water heaters, and windows and doors. Decks have a separate checklist, permanently installed pools have their own checklist, and a plumbing checklist covers existing and new water services. A Residential Insurance FAQ is posted with them.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial build-outs, new multi-family and non-residential buildings, racking, parking lot improvements, signs, fire alarm and fire sprinkler systems and temporary tents and construction trailers are all permitted by the Building Division. Plans that must carry an architect’s stamp pay a $100 review fee for the required stamped architectural plan, and a construction trailer is $100 plus a $500 bond.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Public sidewalk at a new driveway. When you apply for a driveway permit, Public Works inspects the public sidewalk and utilities within the driveway and apron. If the sidewalk needs repair, the village fixes it with its own crews or a contractor, first come, first served by application date, and that can take up to four weeks and holds the driveway permit until it is done. If your driveway contractor, or a separate concrete contractor, repairs the public walk instead, Public Works reimburses part of the cost (630-837-0811).
- Aprons and parkway sprinklers. The apron belongs to the homeowner, and the village does not maintain or replace it, so it strongly encourages replacing the apron with the driveway. Sprinkler lines in the parkway should be moved out of the right-of-way where possible.
- Stormwater. DuPage County lists Bartlett as a partial waiver community: the county reviews floodplain, floodway, wetland and buffer elements and then authorizes the village, which enforces the rest of the ordinance and issues the Stormwater Certification. MWRD lists Bartlett as a multi-county municipality that applies the DuPage ordinance in its Cook County part, so no MWRD Watershed Management permit is needed there unless the project includes the activities in Section 201.2 of the WMO.
- Grading. Erosion control and grading work has its own permit from the Building Division.
Bartlett permit costs and fees
Bartlett publishes its building permit fees on the Building Division’s Permit Fees page. The basic fee follows the estimated value of the proposed work, and review fees for electrical work, plumbing work and stamped architectural plans are added where the project has them.
| Estimated value or item | Fee |
|---|---|
| Less than $500 | $40 |
| $500 to under $1,000 | $45 |
| $1,000 to under $2,500 | $50 |
| $2,500 to under $5,000 | $60 |
| $5,000 to under $10,000 | $90 |
| More than $10,000 | $12 per thousand |
| Electrical review (if applicable) | $75 |
| Plumbing review (if applicable) | $75 |
| Required stamped architectural plan review | $100 |
| Above-ground pool | $115 including $40 electric review; $40 plumbing review if applicable |
| In-ground pool | Value-based fee plus $80 ($40 electric, $40 plumbing review) |
| Change in ownership or occupancy certificate | $150 |
| Conditional occupancy certificate | $100 |
| Final occupancy certificate | $100 |
| Construction trailer | $100 plus $500 bond |
| Demolition, accessory structure / primary structure | $100 / $1,000 |
Rather talk it over?
Call 1-855-478-4290 →Worked example from the table: an $8,000 bathroom remodel falls in the $5,000-to-$10,000 band, so the permit fee is $90; with the $75 electrical review and $75 plumbing review that the work brings, the total is $240. A $3,000 fence would pay $60.
Anyone who does work without a required permit pays double the fee based on the cost of the project, or at least $100, and may also face fines and penalties under Section 9-23-4 of the Bartlett Municipal Code.
Trade permits and who may pull them
Trade work is permitted through the Building Division: HVAC, water heater, radon mitigation and solar permits, miscellaneous electric and miscellaneous plumbing permits, sewer repairs, lawn sprinklers, and fire alarm and fire sprinkler systems. Where a permit includes electrical or plumbing work, a $75 review fee is added for each, and the Plumbing Checklist for existing and new water services sets out what a water service job needs.
Contractors apply for a Bartlett contractor’s license through the village’s online licensing portal. Plumbers must also hold an Illinois Department of Public Health license under the state plumbing code, and roofing contractors the state roofing license. The Building Division pages do not set out whether a homeowner may do their own trade work; the handouts for electrical work and water heaters are the place to start, and the division can confirm before you apply.
Rather not deal with the building department?
Get a free quote →How to apply for a Bartlett building permit
Village lots in any of the three counties file with the Building Division; unincorporated land goes to the county.
Use the handout or checklist for your project, such as the deck checklist or the roof, fence or driveway guide.
Your contractor should hold a current Bartlett contractor’s license from the online licensing portal.
Open your permit type on the Building Division page and choose Apply Online; give the estimated value of the work.
Driveway permits wait for Public Works’ sidewalk inspection; projects with floodplain or wetland areas need the county’s stormwater sign-off.
Pay the fee, then display the permit where it can be seen from the street until the final certificate is issued.
Review, corrections and what causes delay
The village does not post a standard review time, but its pages name two causes of delay. A driveway permit is not issued until any public sidewalk repair Public Works finds is finished, which can take up to four weeks. Projects touching floodplain, floodway, wetlands or buffers need DuPage County’s review before the village can issue the stormwater certification. Use Track Your Permit Status online to follow the application.
Inspections and occupancy in Bartlett
Request inspections online through the Request Inspections link for your permit type. Keep the permit displayed so it is visible from the street or public right-of-way until the work is complete and the village has issued a certificate of completion or occupancy.
Occupancy certificates are priced on the fee page: a final occupancy certificate is $100, a conditional occupancy certificate is also $100, and a change in ownership or occupancy certificate is $150. Demolition permits are $100 for an accessory structure and $1,000 for a primary structure.
Illinois building code in Bartlett
Bartlett’s building rules and penalties are in the Bartlett Municipal Code, including the Bartlett Building Code cited on the fee page; the Building Division pages do not list the model code editions. FEMA’s Community Status Book lists the Village of Bartlett (community 170059, Kane, DuPage and Cook counties) as participating in the National Flood Insurance Program, with flood maps effective January 23, 2026, and in the Community Rating System at class 6, with a 20% flood insurance premium discount.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Bartlett building permit FAQs
How much is a building permit in Bartlett?
It depends on the estimated value: $40 under $500, rising to $90 for $5,000 to $10,000, and $12 per thousand for work valued over $10,000, plus $75 electrical and plumbing reviews where they apply.
Is a permit needed when a property changes owner?
Yes. Bartlett requires a permit when ownership or occupancy changes, and the change in ownership or occupancy certificate costs $150.
Why is my driveway permit delayed?
Public Works inspects the public sidewalk first; if it needs repair, the village fixes it before issuing the permit, which can take up to four weeks.
Do contractors need a Bartlett license?
Yes. Contractors apply for a contractor’s license through the village’s online licensing portal.
What happens if I build without a permit?
You pay double the permit fee, at least $100, and may face fines under Section 9-23-4 of the Municipal Code.
Does the county issue permits in Bartlett?
No. The Building Division permits all of Bartlett in Cook, DuPage and Kane counties; the counties permit only unincorporated land.
Do I need an MWRD stormwater permit in the Cook County part?
Usually not. Bartlett applies the DuPage County stormwater ordinance there, and MWRD requires its own permit only for Section 201.2 activities.
Bartlett permit search and official resources
Use Track Your Permit Status on the Building Division page to follow a permit filed online. For older permits and occupancy certificates on a property, contact the Building Division through Village Hall at 630-837-0800; public records can also be requested from the village under the Illinois Freedom of Information Act.
Inspections are where schedules slip.
Get a free quote →- Bartlett Building Division and permit links
- Bartlett permit fees
- Building permit handouts, guides and checklists
- Contractor’s license application
- DuPage County stormwater administrators and waiver status
- MWRD multi-county municipalities
- Cook County Department of Building and Zoning (unincorporated areas)
- DuPage County Building and Zoning (unincorporated areas)
- Kane County Building & Zoning Division (unincorporated areas)
- FEMA Community Status Book, Illinois
Simplify Bartlett permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Bartlett sooner?
Let Alliance prepare, file, and track your Bartlett permits while your crew stays on the job.
More Illinois permitting guides
DuPage County
Read guide →Bensenville
Read guide →Bloomingdale
Read guide →Batavia Building Permit Guide
Read guide →Beach Park Building Permit Guide
Read guide →Belleville Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Bartlett permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.