Inside Batavia, permits come from the Building Division of the Community & Economic Development Department, 100 N. Island Avenue (630-454-2700), where Jeff Albertson is Building Commissioner. Most residential and commercial applications go through the city’s One Stop Permit Portal, and the division aims to process most residential permits within 10 business days. Flat fees run from $30 for siding to $110 for a deck; new homes pay $21 per 100 square feet with a $400 minimum.
What requires a building permit in Batavia?
The city requires a permit for most home improvement and remodeling work and for commercial and industrial projects. Its published list covers additions, alterations and renovations, concrete work other than driveways, decks, demolition, detached garages, driveways, electrical work, fences, gazebos, heating, cooling and mechanical equipment, irrigation, parking lots, plumbing, porches and sunrooms, pools and hot tubs, right-of-way work, roofs, signs, sheds, siding, sod or seed installation, solar systems, temporary signs, trellises, window and door installation or replacement, and water heaters.
Permit needed
- Additions, basement finishes and kitchen or bath remodels
- Any alteration involving framing, wiring, plumbing or replacement mechanical equipment
- Every deck, shed and fence, whatever the size
- Re-roofing, roof recovers and siding
- Window and door replacement
- New and replacement driveways
- Water heaters, furnaces and A/C condensers
No permit
- Replacing only a bath or kitchen countertop
- Repairing or replacing plumbing fixtures in the same place with no new piping
- Finish flooring
- Swapping switches, receptacles and light fixtures in the same place with no new wire
Pulling out part of an exterior wall during a remodel can trigger a separate demolition permit. Properties in the Batavia Historic District or designated as local landmarks may also need a Certificate of Appropriateness before the permit is issued, and the city now also requires one for painting exterior materials that were never painted before, work that used to be exempt.
What Batavia decides and what the state holds
Batavia sets its own construction rules in Title 9 of its Municipal Code, and the City Council set the permit fees under that title. The project pages point to the International Residential Code for houses (chapter 9 for roofing) and the International Building Code for commercial roofs, and window replacements must meet the U-factor values of the Illinois energy code. An older pool handout from 2010 still names the 2006 residential code and the 2005 electrical code, so ask the division which editions apply on your filing date. Plumbing follows the state plumbing code and must be done by an Illinois-licensed plumber unless the homeowner does all of it, and roofers need the state roofing license.
Short on time to read all of this?
Get a free quote →Batavia building department: who handles permitting
The Community & Economic Development Department enforces the city’s building, zoning and property maintenance codes, reviews plans and issues building permits. Its Building Division handles permit intake, plan review and inspections; the Planning and Zoning Division handles zoning and development cases; and commercial reviews are coordinated with Fire, Engineering and Utilities. Batavia sits mostly in Kane County with a small part in DuPage County; land outside the city limits goes to the county instead (see the Kane County building permit guide for unincorporated Kane).
| Detail | Information |
|---|---|
| Office | Community & Economic Development, Building Division, 100 N. Island Avenue, Batavia, IL 60510 |
| Phone | 630-454-2700 |
| permits@bataviail.gov | |
| Hours | Monday to Friday, 8 a.m. to 5 p.m. |
| Building official | Jeff Albertson, Building Commissioner |
| Online filing | One Stop Permit Portal |
Batavia permit types
One Building Permit Application covers every project type. It asks for the valuation, the floor areas and every contractor, and whether the site is in the Historic District or is a landmark. Attach the contractor’s contract so the city can set the valuation; if there is none, or the owner is the builder, staff use the latest ICC Building Valuation Data cost per square foot.
Residential permits
- New homes and additions. Two complete plan sets (foundation, floor and framing plans, wall sections, sealed truss specifications, elevations, sump locations, electrical plan, heating and cooling load calculations and a REScheck or prescriptive energy form) and two surveys signed by a land surveyor or engineer showing spot grades, drainage, top-of-foundation elevation, the B-box, water and sewer services and the sump connection. Infill lots also show the average setback and roof heights along the block.
- Remodels and basements. Two paper plan sets plus electronic plans at 1/8 inch to the foot or larger, with framing details, room uses, smoke and CO detectors and new sump or ejector pits; a plat of survey only when the footprint grows.
- Decks. Two surveys and two plan sets; guards of at least 36 inches on platforms more than 30 inches above grade, 6x6 posts for decks more than 4 feet up, and no decks over easements, buried electric lines or septic fields.
- Fences. A plat stamped by a licensed surveyor with the fence drawn in, and a section detail or spec sheet. Front-setback fences are limited to 3 feet, corner-side fences to 4 feet, and side or rear fences to 6 feet (8 feet beside commercial or industrial lots); no fence may go in a FEMA-mapped floodplain.
- Sheds. Every shed needs a permit, the eave may be no higher than 10 feet, and a shed within 5 feet of the house needs one-hour fire-resistant walls unless it is non-combustible.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Not sure this scope needs a permit?
Get a free quote →Commercial permits
New commercial, industrial and public buildings need four sets of plans and specifications. The city recommends a pre-application meeting with Economic Development staff, who list the zoning, building, fire, accessibility and utility approvals, documents, fees and timelines before you file. Batavia runs its own electric utility, so new or upgraded services use the city’s residential or commercial electric service applications and its transformer pad specifications.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Zoning cases. Use permits, design review, variances, rezonings, subdivisions, annexations and zoning appeals go through the Planning and Zoning Division to the Plan Commission and Zoning Board of Appeals, which meets at 7 p.m. on the first and third Wednesday of each month in the Council Chambers at 100 N. Island Avenue and makes recommendations to the City Council’s Committee of the Whole. Minor work can use administrative design review.
- Historic review. A Certificate of Appropriateness, reviewed by staff or the Historic Preservation Commission, comes before exterior work in the Historic District.
- Stormwater and erosion. The zoning application list includes the Kane County Stormwater Management Permit Worksheet, and projects in final engineering review are also checked by the Kane-DuPage Soil and Water Conservation District.
- Right-of-way and driveways. Driveways need their own permit, which covers work in the public right-of-way; curb, sidewalk, street cut and utility work use the general right-of-way permit, and contractors post a surety bond.
- Road impact fees. Some projects owe Kane County Department of Transportation road improvement impact fees; call 630-584-1170 to check.
Batavia permit costs and fees
The Building Permit Fee Schedule lists fees set by the City Council under Title 9 of the Municipal Code. Flat-rate fees are paid when you apply; calculated permits take a submittal fee at application that is credited toward the final fee.
Rather talk it over?
Call 1-855-478-4290 →| Work | Fee |
|---|---|
| New single-family home or duplex | $100 submittal fee; $21 per 100 sq ft, $400 minimum |
| Residential addition | $100 submittal fee; $21 per 100 sq ft |
| Kitchen, bath, basement or other alteration | $32 for the first $1,000 of value, $11 per additional $1,000 |
| Deck, gazebo or porch | $110 |
| Garage over 120 sq ft | $125 pre-engineered; $150 custom |
| Shed under 120 sq ft, pergola or trellis | $85 |
| Fence | $75 |
| Reroof / siding (over the counter) | $40 / $30 |
| Water heater / furnace / A/C condenser replacement | $60 / $45 / $30 |
| Electrical, plumbing-only or new mechanical work | $85 each |
| Windows, exterior doors or driveway | $55 each |
| Above-ground / in-ground pool; spa | $100 / $150; $85 |
| Commercial new building under 10,000 sq ft | $300 submittal fee; $19 per 100 sq ft |
| Commercial tenant improvement | $32 for the first $1,000, $11 per additional $1,000 |
| Commercial plan review | ICC plan examination fee plus 10% |
| Extra plan review or revisions | $30 per half hour |
| Re-inspection | $75 first; each later one for the same items doubles |
| Temporary certificate of occupancy | $80 residential; $160 commercial |
Plan review is included in residential permit fees, while plumbing plan reviews and plumbing inspections are billed at actual cost plus $30. Permit extensions cost 50% of the original fee. Worked example from the schedule: a kitchen remodel valued at $25,000 costs $32 for the first $1,000 plus 24 × $11 ($264), or $296, before any plumbing review and inspection charges. Work started before a permit draws a penalty: the schedule’s note says $250 or double the permit fee, whichever is greater, while its table lists the permit fee plus 100%, so expect at least the higher figure.
Trade permits and who may pull them
Electrical, plumbing, mechanical and water heater work are permitted through the same Building Division, and the application lists the general, electrical, HVAC, plumbing, roofing and excavation contractors. The city’s permit pages list no separate contractor registration; contractors are identified on the application.
- Plumbing: fill in the Residential Plumbing Review Sheet with isometric drawings for new fixtures, and give a copy of the plumber’s Illinois license and an original notarized Letter of Intent. A homeowner doing all of the plumbing signs a notarized Letter of Intent instead.
- Roofing: a copy of the contractor’s Illinois roofing license; on a house, an owner doing the work states on the application that they will do all of it, and gives material receipts for the valuation.
- Electric service: new or upgraded services also need the city utility’s service application.
- Driveway contractors: a surety bond of $10,000 or 1.5 times the estimate, whichever is greater, or a $75,000 annual bond, plus insurance certificates.
Rather not deal with the building department?
Get a free quote →How to apply for a Batavia building permit
Check that the lot is inside Batavia and whether it is in the Historic District.
Use the city’s project guide for decks, fences, sheds, roofs or remodels and gather its plans and surveys.
Submit through the One Stop Permit Portal, or send the PDF application by email or bring it in, which can add entry time.
Flat fees are paid at application; calculated permits pay a credited submittal fee first.
Revised drawings go back to the original reviewers.
The city issues the permit, approved plans and the list of required inspections.
Review, corrections and what causes delay
The division aims to process most residential permits within 10 business days and gives commercial and industrial projects 10 to 15 business days for the first review; the small-business guide says full commercial reviews typically take three to six weeks depending on complexity. Paper or emailed applications can take longer than portal filings because staff must enter them. The project pages require surveys drawn to scale and not resized, license copies and letters of intent, and any change to approved plans must be approved by the Building Division before the work is done, so missing items hold up the permit. Check status by calling 630-454-2700 or emailing permits@bataviail.gov.
Inspections and certificates in Batavia
Book inspections with the Building Inspections Office at least 48 hours ahead; appointments run Monday to Friday from 8 a.m. to noon and 1 to 3 p.m. Each phase must pass before work continues or is covered. A deck, for example, has a post-hole inspection, a rough framing inspection before the boards go on (for decks 48 inches or less above grade) and a final; fences have a post-hole and a final. If the work will not be ready, cancel in advance to avoid the $75 re-inspection fee. Every permit must be closed with a passed final inspection, and a business may open once its final inspection passes. Temporary certificates of occupancy cost $80 for homes and $160 for commercial or industrial buildings, doubling for an extension past six months.
Illinois building code in Batavia
Batavia enforces the codes adopted in Title 9 of its Municipal Code, with the residential and building codes and the Illinois energy, plumbing and accessibility codes named on its project pages. FEMA’s Community Status Book lists the City of Batavia (community 170321) as participating in the National Flood Insurance Program, with a current flood map dated August 1, 2019; the city does not appear in the Community Rating System.
Want this handled start to finish?
Get a free quote →Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline
Batavia building permit FAQs
Do I need a permit to replace my roof in Batavia?
Yes. Every re-roof or roof recover needs a permit, issued over the counter for $40, and a full tear-off is required where two or more layers already exist.
How much is a deck permit?
$110 for a deck, gazebo or porch, with post-hole, framing (on decks up to 48 inches high) and final inspections.
Does a small shed need a permit?
Yes. Batavia requires a permit for every shed regardless of size; a shed under 120 square feet costs $85.
How long does a permit take?
The city aims for 10 business days or less on most residential permits and allows 10 to 15 business days for a first commercial review.
Can I replace windows without a permit?
No. Window and door replacements need a permit ($55), with opening sizes and U-factor values on the application.
Can a homeowner do the plumbing?
Yes, if the homeowner does all of it and files a notarized Letter of Intent; otherwise an Illinois-licensed plumber must sign one.
What happens if I build before getting a permit?
The permit costs more: the fee schedule lists a penalty of $250 or double the permit fee, whichever is greater.
Batavia permit search and official resources
For the status of an application, call 630-454-2700, email permits@bataviail.gov or visit the office; portal users can follow their applications online. Older permit files are public records under the Freedom of Information Act: file the city’s online FOIA form or send a request by mail, phone or in person to the FOIA Officer at 100 N. Island Avenue (630-454-2000). The city generally answers within five business days.
Inspections are where schedules slip.
Get a free quote →- Batavia building permit applications
- Building permit fee schedule
- Building permit application (PDF)
- Residential building permit submittal checklist
- Residential alterations requirements
- Deck construction requirements
- Fence construction requirements
- Shed building requirements
- Re-roofing requirements
- Driveway and right-of-way permit
- Building permit process for small businesses
- Planning and zoning applications
- Plan Commission and Zoning Board of Appeals
- Certificate of Appropriateness
- City of Batavia FAQs
- Freedom of Information Act requests
- FEMA Community Status Book, Illinois
Simplify Batavia permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Batavia sooner?
Let Alliance prepare, file, and track your Batavia permits while your crew stays on the job.
More Illinois permitting guides
Kane County
Read guide →Carpentersville
Read guide →Geneva
Read guide →Beach Park Building Permit Guide
Read guide →Bellwood Building Permit Guide
Read guide →Belvidere Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Batavia permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.