Bloomingdale, Illinois Building Permit Guide

To get a building permit in Bloomingdale, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Bloomingdale’s Building and Zoning Department at Village Hall, 201 S. Bloomingdale Road, issues building permits inside the village and accepts only complete applications with every required document.

Authority: Building and Zoning DepartmentFiling: Complete packets onlyPhone: 630-671-5660
Authority
Building and Zoning201 S. Bloomingdale Road
Building fee
$50 + $8 per $1,000Of construction cost after the first $1,000
Contractor registration
None requiredBonds and licenses by permit type
Inspections
24 hours’ noticeApplicant schedules; 630-671-5660

Inside Bloomingdale, building permits come from the Building and Zoning Department, part of Building, Zoning & Engineering at Village Hall, 201 S. Bloomingdale Road (630-671-5660; Monday to Friday, 8:30 a.m. to 4:30 p.m.); the department head is Sean Gascoigne, Director of Community and Economic Development. Partial submittals are refused. The village’s fee schedule charges $50 for the first $1,000 of construction cost and $8 for each further $1,000, plus plan review and trade fees, and contractors need no village registration, though bonds, insurance and licenses depend on the permit.

What requires a building permit in Bloomingdale?

The village asks residents to contact Building and Zoning before building or installing any accessory structure or improving their home, and its general information sheet lists the projects that commonly need a permit. The list is not complete, so ask about anything not on it.

Exterior and structure

  • Room additions, garages and porches
  • Decks, patios, pergolas and sheds
  • Fences and retaining walls
  • Driveways and sidewalks
  • Roofs, including repairs and re-roofing
  • Siding and window or door replacement
  • Above-ground and in-ground pools

Interior and systems

  • Kitchen, bathroom and basement remodeling
  • Fire or water damage repairs
  • Air conditioners and furnaces
  • Attic insulation and fireplaces
  • Electrical and plumbing work
  • Water heaters and sewer repairs
  • Lawn sprinkler systems

Signs, demolition and house moving, sewer and water connections, temporary land uses for special events and work in the parkway (with a right-of-way damage agreement) have their own forms, and filling or altering a storm ditch needs a permit under a separate village ordinance.

What Bloomingdale decides and what the state holds

Bloomingdale adopts its own codes by ordinance. Ordinance 2025-49 adopted, with local amendments, the 2024 International Building, Residential, Mechanical, Fuel Gas, Property Maintenance, Fire and Swimming Pool and Spa codes, the 2023 National Electrical Code and the 2024 edition of the state’s Illinois Energy Conservation Code. The state plumbing code (2014 edition) was adopted by Ordinance 2014-49, and the Illinois Accessibility Code dated October 23, 2018 also applies. Some village handouts are older: the residential roofing and shed sheets still cite the 2018 International Residential Code, and the new-home checklist packet still lists the 2021 codes.

Bloomingdale building department: who handles permitting

The Building and Zoning Department enforces the zoning ordinance, the building, plumbing and electrical codes and the village’s construction and accessibility standards; permits are issued over the Building Commissioner’s signature. The Engineering Department reviews subdivisions and commercial site plans and inspects private development. Planning and Zoning Commission cases are run by the Department of Community & Economic Development (630-671-5668). Unincorporated land near Bloomingdale is permitted by DuPage County Building and Zoning (630-407-6700), which handles unincorporated areas only.

Short on time to read all of this?

Get a free quote →
Bloomingdale permit contacts
DetailInformation
OfficeBuilding and Zoning Department, Village Hall, 201 S. Bloomingdale Road, Bloomingdale, IL 60108
Phone and fax630-671-5660; fax 630-893-1596
Emailbuildingandzoning@vil.bloomingdale.il.us
HoursMonday to Friday, 8:30 a.m. to 4:30 p.m.
Department headSean Gascoigne, Director of Community and Economic Development, 630-671-5694
Village Hall main line630-893-7000

Bloomingdale permit types

All building work uses the Application for Permit, which lists the property, the owner, the construction cost and square footage and every contractor by trade (architect, general, concrete, carpentry, masonry, plumbing, roofing, electrical, mechanical and fire protection). A detailed written scope of work or plans must accompany every permit. Trade forms include an electrical panel schedule, a residential plumbing fixture review sheet and a heating affidavit, and the village posts handouts for fences, hot tubs, residential roofing, sheds and solar panels.

Residential permits

  • New homes. Four sets of plans signed and sealed by an Illinois licensed architect (footings to trusses, electrical, plumbing and heating, light and ventilation and energy compliance), four plot plans on the plat of survey sealed by an Illinois registered surveyor with setbacks and foundation and street elevations, and receipts for the elementary school, high school and park district impact fees. The plumbing plans go to TPI Code Consultants, which has 10 business days to review them while the village reviews the rest.
  • Roofs. The application, the proposal, a certificate of insurance naming the village, the roofer’s Illinois license, a $10,000 surety bond when a dumpster is used and any homeowners association approval; the fee is based on construction cost and paid at issuance. Ice and water shield must run 2 feet inside the heated walls, rotten decking must be replaced, and asphalt roofs may have no more than two layers.
  • Fences. The application with the stormwater and floodplain certification form, the proposal, two plats of survey marking any well, septic field, floodplain, wetland or waterway buffer within 25 feet, a $10,000 bond and insurance naming the village. Fences follow Village Code Title 11, Chapter 19: finished side out, along easement lines rather than through them, none between the front lot line and the street, 42-inch frost footings, no barbed wire or electric wire, and metal fences only in green, brown or black and not in a front yard. Post holes are inspected before concrete, then a final.
  • Sheds. One general accessory building of up to 200 square feet is allowed per lot in single-family districts, plus one of up to 150 square feet for pool equipment, gardening or a gazebo. Sheds go in the rear yard only, 10 feet from the house and from buildings next door and 5 feet from property lines, one story and no taller than 15 feet or the house; submit two plan copies and two plats.
  • Other jobs. Each handout lists what to submit, and the general information sheet urges owners to check a contractor’s references, insurance and license before signing.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial work follows the commercial submittal checklist and the engineering inspection checklist for commercial construction. Commercial plan review is $150 plus 0.4% of construction cost up to $1 million and 0.05% above that, and engineering plan review is $350 per acre. Elevators, flammable liquid tanks and fuel dispensers, fire protection systems and construction trailers have their own fees, and a final inspection and certificate of occupancy costs $75.

What comes before the building permit

  • Zoning. Cases under the zoning code go to the seven-member Planning and Zoning Commission, which meets at 6 p.m. on the first and third Tuesdays and recommends to the Board of Trustees (second and fourth Mondays). File the complete application at least 30 days before the meeting with 14 copies, five full-size plan sets, a flash drive of PDFs, the plat of survey, proof of ownership and the fee, and mail certified notices to every owner within 250 feet 15 to 30 days before the hearing.
  • Stormwater. The forms page carries a Stormwater and Floodplain Management Ordinance Certification Form, and the engineering fees include $75 for a stormwater certification application and $650 per acre-foot (at least $250) for stormwater management review. The village posts floodplain maps by area, and the countywide MS4 stormwater permit covers Bloomingdale.
  • Utilities and parkway. Water and sewer connections need the village’s sewer and water permit application, and parkway work needs a right-of-way damage agreement.

Bloomingdale permit costs and fees

The Building & Zoning Division Plan Review & Inspection Permit Schedule of Fees is attached to the village’s new residential construction checklist; most rows carry a note that additional fees may apply, and the packet does not show the adopting ordinance or date. Plan review fees are paid when the application is submitted and are not refundable.

Rather talk it over?

Call 1-855-478-4290 →
Bloomingdale permit fees (Building & Zoning schedule of fees)
WorkFee
Building permit, residential or commercial$50 for the first $1,000 of construction cost, then $8 per $1,000 (above 100,000 sq ft of construction, $4 per $1,000)
Residential plan review$50 plus $0.10 per sq ft
Commercial plan review$150 plus 0.4% of cost to $1 million, 0.05% above
Expedited plan review150% of the plan review fee
Electrical service, 100 A single phase$50, plus $10 per extra 100 A
Circuits$3 single-pole, $4 two-pole, $5 three-pole
Mechanical / HVAC$50 plus $10 per 1,000 sq ft
Fire protection system$50 plus $2 per 1,000 sq ft
Residential plumbing plan review; inspection$50 plus $10 per fixture, each
Water heater inspection (residential)$50
Final inspection / certificate of occupancy; temporary occupancy$75; $75
Demolition$100 plus $5 per 1,000 sq ft
Engineering plan review, single-family site$350
Stormwater certification application$75
Water or sewer connection$50 each
Soil erosion and sediment control$50 per site

Worked example from the building row: a remodel with a construction cost of $25,000 pays $50 for the first $1,000 plus 24 × $8, or $242, before plan review, trade fees and any additional fees. Reinspections and extra inspections are charged per required inspection. New homes must also show receipts for the elementary school, high school and park district impact fees, and an unbuilt permit costs extra to extend after six months under Village Code 10-1-1.

Trade permits and who may pull them

Bloomingdale has no contractor registration form or fee. Instead, each permit carries the credentials its trade requires: depending on the permit type, a $10,000 surety bond, a certificate of insurance naming the village as certificate holder and a license for electrical, roofing, plumbing, mechanical or radon work. Every plumbing job needs a letter of intent; for a new house the plumber provides a state 055 license and a notarized or sealed letter of intent, and the general contractor posts the $10,000 bond before the permit issues. Electrical, mechanical and roofing contractors provide their license and insurance. Plumbing plans for new homes are reviewed by TPI Code Consultants for the village, and electrical, mechanical, plumbing and fire protection fees are charged by the schedule above.

Rather not deal with the building department?

Get a free quote →

How to apply for a Bloomingdale building permit

1. Talk to Building and Zoning

Call 630-671-5660 before starting to learn which permits, codes and handouts apply.

2. Clear zoning

If the project needs commission approval, file with Community & Economic Development at least 30 days before a meeting.

3. Collect contractor papers

Gather bonds, insurance naming the village, licenses and the plumber’s letter of intent.

4. Assemble a complete packet

Include the application, scope or plans, plat of survey and any trade or stormwater forms; partial submittals are refused.

5. Pay plan review

Plan review fees are due at submittal and are not refundable.

6. Pick up and post

Pay the permit fee at issuance and post the yellow permit card in a front door or window.

Review, corrections and what causes delay

For new homes, TPI’s 10-business-day plumbing review runs alongside the village review, comments are sent together, and revisions go through the same process; village review can be expedited for 150% of the plan review fee. Incomplete packets are not accepted, and missing impact fee receipts, surveys, bonds or letters of intent hold up issuance.

Inspections and certificates in Bloomingdale

Every inspection needs 24 hours’ notice, and the applicant is responsible for scheduling it with Building and Zoning at 630-671-5660. The yellow permit card stays posted until the building inspector approves the project. On a re-roof, the ice and water protection is inspected before roofing goes on (photographs are acceptable) and then a final. A new building may not be occupied until the final inspection is approved and a certificate of occupancy is issued; a final or temporary occupancy inspection costs $75.

Permits are valid for 12 months once construction has started, and for six months if work has not begun. Bond money that is not requested back within one year of final approval or the certificate of occupancy is forfeited to the village, so ask for bond refunds promptly.

Illinois building code in Bloomingdale

Bloomingdale enforces the 2024 International codes and 2023 National Electrical Code adopted by Ordinance 2025-49, with local amendments. FEMA’s Community Status Book lists the Village of Bloomingdale (community 170201) as participating in the National Flood Insurance Program, with flood maps effective August 1, 2019.

Want this handled start to finish?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Bloomingdale building permit FAQs

Do I need a permit to replace windows or my roof in Bloomingdale?

Yes. The village lists roof repairs and re-roofing and window and door replacement among the projects that need a permit.

How much is a building permit?

$50 for the first $1,000 of construction cost and $8 for each further $1,000, plus plan review, trade and any additional fees.

Do contractors have to register with the village?

No. There is no registration form or fee, but bonds, insurance and licenses are required by permit type.

Can I email my application?

The department’s email is buildingandzoning@vil.bloomingdale.il.us, but every required document must come with the application; partial submittals are not accepted.

How long is a permit valid?

Twelve months once work has started, or six months if it has not; extending an unstarted permit costs extra.

Who reviews plumbing plans for a new house?

TPI Code Consultants, within 10 business days, while the village reviews the rest of the plans.

How much notice do inspections need?

24 hours, and the applicant must schedule each one.

Bloomingdale permit search and official resources

Call Building and Zoning at 630-671-5660 about a permit. Records requests for village files go through the online Public Record Request (FOIA) form or by mail to the Assistant Village Administrator at 201 S. Bloomingdale Road; police records have their own form, and fire records belong to the Bloomingdale Fire Protection District, a separate government.

Inspections are where schedules slip.

Get a free quote →

Simplify Bloomingdale permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Bloomingdale sooner?

Let Alliance prepare, file, and track your Bloomingdale permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Bloomingdale permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.