Blue Island, Illinois Building Permit Guide

To get a building permit in Blue Island, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

Blue Island’s Department of Building Safety at City Hall, 13051 Greenwood Avenue, issues building, electrical and plumbing permits in the city and registers every contractor who pulls one.

Authority: Blue Island Building SafetyBuilding fee: $5 per $1,000 (Ch. 150)Phone: 708-597-8606
Authority
Department of Building Safety13051 Greenwood Ave., Blue Island
Hours
Mon–Fri 7:30–4708-597-8606
Contractors
$100 a year per tradeOrdinance 99-247 registration
Historic work
Certificate of AppropriatenessLandmarks and Old Western district

In the City of Blue Island, building permits come from the Department of Building Safety (the Building & Zoning Department) at City Hall, 13051 Greenwood Avenue (708-597-8606), where Robert Vasilenko is Building Official. Contractors register with the city for $100 per trade each year, and the general application covers work to erect, alter, repair or demolish. The city’s posted Chapter 150 prices a building permit at $5 per $1,000 of work value with a $15 minimum, and electrical permits start at $30 for homes.

What requires a building permit in Blue Island?

Chapter 150 of the city code, as posted on the Planning & Zoning page, says no building may be erected, altered or repaired, and no excavation for one may begin, until the Building Commissioner has issued a permit. Everyone who works on the job or delivers materials is expected to check that the permit exists first.

Permit needed

  • New buildings, additions, garages, patios and demolitions
  • Alterations and repairs to existing buildings
  • Fences, which also need a post-hole inspection
  • Electrical services, circuits, motors and illuminated signs
  • Plumbing fixtures, sewer and water taps, water services, sprinklers and street or parkway openings
  • Wireless facilities such as cell towers

Extra approvals

  • A Certificate of Appropriateness for landmarks and buildings in the Old Western Historic District
  • A floodplain development permit in mapped flood areas
  • Zoning relief for variations, special uses or rezoning
  • A commercial sign application

Before a house, condominium or apartment is occupied by a new owner or tenant, Ordinance 09-048 requires a city inspection; sellers file an Intent to Sell application and landlords a Notice of Intent to Rent. For outside work such as a garage, fence, patio or addition, the permit form requires a survey, and where a property has no city sidewalk, or the existing one is in bad repair, the owner must lay or relay it at the owner’s expense as a condition of the permit.

What Blue Island decides and what the state holds

Blue Island chooses and amends its codes, which notably include the Chicago Electrical Code rather than the National Electrical Code, sets its own fees and runs contractor registration, zoning, historic preservation and a city health inspector. Plumbing follows the Illinois Plumbing Code, and the city’s registration rules lean on state credentials: plumbers show their IDPH licenses, roofers and fire alarm contractors their state licenses.

Blue Island building department: who handles permitting

The Department of Building Safety reviews applications, issues permits and inspects construction for property inside the city, and it also enforces the property maintenance and health codes. Under Chapter 150 the City Clerk formally issues the permit and posting card once the department approves the application and the fee is paid. Unincorporated land elsewhere in Cook County is permitted by the county Department of Building and Zoning, not by Blue Island.

Short on time to read all of this?

Get a free quote →
Blue Island permit contacts
DetailInformation
OfficeDepartment of Building Safety, City Hall, 13051 Greenwood Avenue, Blue Island, IL 60406
Phone / fax708-597-8606 / 708-396-2686; City Hall main line 708-597-8603
Emailbuilding@cityofblueisland.org
HoursMonday to Friday, 7:30 a.m. to 4 p.m.
Building OfficialRobert Vasilenko, 708-396-7051
Zoning boardPlanning and Zoning Board of Appeals, 7 p.m. on the first Thursday, City Council Chambers, East Annex, 2434 Vermont Street

Blue Island permit types

The city’s forms page carries a General Building Permit application, separate electrical and plumbing applications, a commercial sign application, a wireless facility application for cell towers, the fence regulations and the floodplain development permit. The general application lists every contractor with its city registration number, from the general contractor, excavator and concrete crew to the sewer, roofing, fire alarm and fire suppression trades, and a signed contract showing the scope of work, signed by owner and contractor, goes with every application.

Residential permits

Fences follow Ordinance 12-168: the application needs a staked plat of survey drawn by a licensed surveyor within the last six months, posts go at least 36 inches below grade, chain-link fences use metal posts set in concrete, and the finished side faces out. Residential fences may be no taller than 6 feet, or 8 feet around a pool, may not stand in the front yard, and may not use barbed or razor wire. If a water meter reading device sits inside the fence line, the Water Department must move it before the fence goes up. Single-family homes need at least a 100-amp electrical service before central air conditioning is approved.

Chapter 150 also spells out how a detached frame garage is built: a concrete floor at least 4 inches thick on an 8-by-8-inch perimeter wall, sand or stone fill (never cinders), 2-by-4 studs at 24 inches on center and doubled 2-by-12 headers over the overhead door. Converting a home to more apartments or rental rooms is limited: no new residential space above the second story of a building taller than two stories, and walls between converted units must be one-hour fire-resistive.

Not sure this scope needs a permit?

Get a free quote →

Commercial permits

Commercial and industrial jobs use the same general and trade applications with the higher commercial electrical base fee, and plans must carry the seal of an Illinois-licensed architect under Chapter 150, which also requires two sets of drawings, including a plot plan and the layout of sewer, drain and water lines. New businesses also apply for a business license, and the department’s code list covers food service and body art establishments, which its own health inspector checks.

What comes before the building permit

  • Historic review. The Historic Preservation Commission, a state-recognized Certified Local Government since 1981, issues Certificates of Appropriateness for landmarks and the Old Western Historic District.
  • Zoning relief. Variations, special uses and text or map amendments go to the Planning and Zoning Board of Appeals, which recommends to the City Council. Notice runs in a newspaper and on one to four signs at least 36 by 48 inches, posted 15 to 30 days before the hearing and removed within seven days after it.
  • Floodplain. No work may start in a mapped floodplain until a floodplain development permit is issued, backed by a drawing sealed by an Illinois engineer or surveyor showing FEMA boundaries and base flood elevations; the permit expires if work does not start within six months.
  • Stormwater. Sites large enough to trigger MWRD’s Watershed Management Ordinance, such as development disturbing more than half an acre, need a district permit, because Blue Island does not issue those permits itself.

Blue Island permit costs and fees

The fee figures below come from the city’s Electrical Permits page and from the Chapter 150 text posted on its Planning & Zoning page. That copy of Chapter 150 still lists older code adoptions than the department now follows, so confirm any Chapter 150 amount with the department before budgeting.

Rather talk it over?

Call 1-855-478-4290 →
Blue Island permit fees (Chapter 150 and Electrical Permits page)
ItemFee
Building permit$5 per $1,000 of work value; $15 minimum; no fee up to $100
Work started before the permit$25 on top of the permit fee
Compliance deposit (refundable)$100 for jobs of $100 to $2,000; $200 to $10,000; $300 at $10,000 or more
Electrical base fee$30 residential; $50 commercial or industrial
Electrical service$30 (100 A); $50 (200 A); $75 (400 A); $100 above 400 A
Circuits$10 per 15-amp circuit, $15 per 20-amp circuit, $20 per larger circuit, $25 per motor
Plumbing inspection$50 for five fixtures or fewer, $10 each extra; sprinklers $1 per head
Water main tap / sewer connection$300 one-inch, $400 larger / $200
Street / parkway opening deposit$300 ($200 returned after 45 days) / $125 ($75 returned)
Contractor registration$100 per trade per year
Zoning relief$200 variation; $400 special use or amendment; $50 sign deposit

As a worked example under Chapter 150, a $20,000 remodel carries a building permit fee of 20 × $5, or $100, plus a $300 compliance deposit that comes back once the inspections, final certificate of occupancy, site clean-up and any sidewalk repair are complete; trade permits are extra. Zoning applicants also pay the newspaper publication cost, which the city bills.

Trade permits and who may pull them

Under Ordinance 99-247 every contractor doing business in Blue Island registers with the city, at $100 for each type of work, renewed yearly. Registration needs a certificate of insurance naming the city as holder, with at least $1,000,000 per occurrence in general liability plus statutory workers’ compensation, and a $10,000 surety bond ($20,000 for tree cutting and excavation) that states the trade.

  • Electrical and general contractors attach a license from another city or village, with the City of Chicago license preferred; electrical contractors name their supervising electrician. Electrical work follows the Chicago Electrical Code.
  • Plumbers keep both IDPH licenses (055 and 058) on file; they pay no local fee and post no bond.
  • Roofers keep a current state roofing license on file and post no bond.
  • Fire alarm contractors file their state license and pay no local fee.
  • HVAC contractors attach EPA 608 certification.

Chapter 150 says the application must be signed by the owner, any land-trust beneficiaries, the architect and the contractor responsible for the work, all of whom answer jointly for following city and state law.

Rather not deal with the building department?

Get a free quote →

How to apply for a Blue Island building permit

1. Clear historic, flood and zoning questions

Get a Certificate of Appropriateness, floodplain permit or zoning relief first where they apply.

2. Register the contractors

Each trade files the registration form, insurance and bond, or its state license.

3. Fill in the applications

Use the General Building Permit form plus electrical or plumbing forms, with the JULIE dig number.

4. Attach plans and the contract

Two sets of plans where required, a survey for outside work and the signed contract.

5. Submit at City Hall

Bring the package to the Building & Zoning Department at 13051 Greenwood Avenue; questions go to building@cityofblueisland.org.

6. Pay and post

Pay the fee and deposit, then post the permit card on the site.

Review, corrections and what causes delay

The Building Commissioner stamps both sets of plans once they meet the building and zoning codes, keeping one and leaving one on the job. Small, simple work may be approved without plans at the Commissioner’s discretion. A permit becomes void if work does not begin within six months and expires 18 months after issue, though the Commissioner can extend it up to 12 months for good cause. An unregistered subcontractor or a missing signed contract will hold an application.

Inspections in Blue Island

Chapter 150 has the permit holder call the Building Commissioner at set stages: when trenches are dug and forms set but before the foundation is poured, before the structural frame is covered, after lath is in place but before plaster, and when the building is finished and ready to occupy. Fences add a post-hole inspection. No part of a building may be used until a final inspection has been made and a certificate of occupancy issued.

The compliance deposit stands behind those rules. If the holder skips required notice, covers work before inspection or moves in before the certificate of occupancy, the whole deposit is forfeited; if debris, stopcocks or damaged sidewalks are left for the city, the cost comes out of the deposit and any balance is refunded. Inspections for sales and rentals are booked at 708-597-8606, and violations found there can be handled through the Agreement to Correct Building Code Violations.

Illinois building code in Blue Island

Blue Island lists, as amended, the 2021 International Building, Residential, Existing Building, Energy Conservation, Mechanical and Property Maintenance codes, the 2018 Chicago Electrical Code, the 2017 Life Safety Code, the 2014 Illinois Plumbing Code and the Illinois Accessibility Code. FEMA’s Community Status Book lists the City of Blue Island (community 170064) as participating in the National Flood Insurance Program, with its flood map effective August 19, 2008, and the city’s floodplain rules are in Chapter 156.

Want this handled start to finish?

Get a free quote →

Illinois leaves building codes to local government, but since 1 January 2025 any local code must regulate structural design at least as strictly as baseline editions of the International Building, Existing Building and Residential Codes, and where no code was adopted the statute sets minimums for commercial buildings and new homes (Public Act 103-0510). Illinois codes and the statewide baseline

Blue Island permit search and official resources

Permit and inspection records are requested with the Building & Zoning Department’s Freedom of Information form, which goes to the department at City Hall (the form lists building@cityofblueisland.org) and notes a copy charge of a quarter per page. The form lets you ask for ordinances, minutes and plans as well as permit files.

Inspections are where schedules slip.

Get a free quote →

Blue Island building permit FAQs

How much is a building permit in Blue Island?

The posted Chapter 150 charges $5 per $1,000 of work value, at least $15, plus a refundable compliance deposit of $100 to $300; confirm current figures with the department.

Does my contractor have to register?

Yes. Every contractor registers each year for $100 per trade with insurance and a bond; plumbers and fire alarm contractors pay no fee.

Which electrical code applies?

The 2018 Chicago Electrical Code, and electrical permits start at $30 for a home.

How tall can my fence be?

Six feet in a residential district, or 8 feet around a pool, and never in the front yard; a staked survey is required.

My house is in the historic district. What do I need?

A Certificate of Appropriateness from the Historic Preservation Commission along with the building permit.

Do I need an inspection to sell or rent?

Yes. Ordinance 09-048 requires an inspection before a house, condominium or apartment is occupied; call 708-597-8606.

When does the zoning board meet?

At 7 p.m. on the first Thursday of the month in the City Council Chambers, East Annex, 2434 Vermont Street.

Simplify Blue Island permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Illinois. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Blue Island sooner?

Let Alliance prepare, file, and track your Blue Island permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Blue Island permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.