The City of Cocoa Building Division, at 65 Stone Street, reviews plans, issues permits and inspects construction inside the city, and every permit type can be applied for, paid and inspected through the City’s Citizenserve portal. Since January 1, 2026, many small residential jobs are a flat $75, other work is priced on valuation from $75, and a $25 processing fee and $150 plan review fee apply.
What requires a permit
Cocoa requires permits for construction, alteration, repair, demolition, use and occupancy work regulated by the Florida Building Code and the City’s own ordinances. The City’s permit type list covers residential and commercial work:
Building and site
- New construction, alterations and renovations
- Accessory structures and sheds
- Aluminum carports and patio or screen enclosures
- Re-roofs, windows, doors and exterior siding
- Hurricane shutters
- Fences, masonry and retaining walls
- Slabs, driveways, docks and seawalls
- New pools and pool repairs
- Demolition and land clearing
- Manufactured home set-ups
Trades and systems
- Electrical, plumbing and gas
- HVAC replacement and other mechanical work
- Residential generators
- Solar photovoltaic and solar thermal
- Septic replacement
- Fire alarm and fire sprinkler systems
- Kitchen hoods and fire suppression
- Illuminated and non-illuminated signs
- Temporary power poles and tents
The City warns that it has adopted extra local rules and some exceptions to the Florida Building Code, including a minimum floor height, so check with the Building Division before you design.
Who handles permitting
The Building and Permitting Division sits in the City’s Community Services Department and is run by the Building Official, who receives applications, reviews construction documents, issues permits and inspects the work for compliance with the Florida Building and Fire Codes and local requirements.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Office | 65 Stone Street, Cocoa, FL 32922 |
| Phone | 321-433-8501 |
| building@cocoafl.gov | |
| Hours | Monday-Friday, 8:00 a.m.-4:30 p.m. (payments 8:00 a.m.-4:00 p.m.) |
| Apply, pay, inspect | Citizenserve online portal |
Permit types
Citizenserve is the City’s permit intake channel. You can apply for any permit type, download forms, upload documents, view submittal requirements and City policies, check status, pay fees and schedule inspections there. Permits issued since March 1, 2021 can be searched by choosing “Building Permits” as the file type.
| Local permit group | Examples published by Cocoa |
|---|---|
| Building | New construction, alterations, accessory structures, demolition, sheds, slabs, fences and retaining walls. |
| Openings / exterior | Windows, doors, re-roofs, exterior siding and hurricane shutters. |
| Trades | Electrical, plumbing, gas, HVAC replacement and other mechanical work, generators and solar. |
| Site / accessory | Driveways, pools, pool repair, docks and seawalls, septic replacement, construction trailers and temporary tents. |
Owner-builders: the legal owner applies, for their own use, and must be on site for every inspection. Before filing, the owner appears in person at the Building Division with proof of ownership and a driver’s licence showing the property address, and signs the Owner/Builder Disclosure Affidavit, which staff notarize if approved. Applications without an approved affidavit are automatically denied. Corporations and LLCs cannot use it, nor can properties rented, for sale or to be sold or leased within a year, or commercial projects over $75,000.
Not sure this scope needs a permit?
Get a free quote →Permit costs & fees
New building permit fees took effect January 1, 2026 under Resolution 2025-088.
| Project | Fee |
|---|---|
| Application processing (all permits) | $25 |
| Residential flat-fee permits: slab, driveway, siding, fence or wall, non-electric shutters, shed, above-ground pool, pool repair, demolition, land clearing | $75 each |
| HVAC replacement (one air handler and/or one condenser) | $75; more units priced on value |
| Other residential work | $75 for the first $1,000, plus $4 per $1,000 |
| Other commercial work | $100 for the first $1,000, plus $6 per $1,000 |
| Plan review | $150 ($200 with a private provider) |
| Plan revisions | $100 per request |
| Adding a subcontractor / change of contractor | $100 each |
| Floodplain review, LOMR or CLOMR | $150 |
| Temporary certificate of occupancy | $100 per request |
| Extension of time | $50 |
| Re-inspection | $100 second failure, $150 third, $200 fourth and later |
Rather talk it over?
Call 1-855-478-4290 →Simplified fire alarm and fire sprinkler permits, which need no building plan review, are not charged the plan review fee. Work without a permit can cost up to four times the permit fee; emergency work is exempt if the permit is submitted within 2 business days. Refunds are limited to half of the amount above the base fee, requested in writing within 90 days of issue.
Trade permits
Electrical, plumbing, gas, HVAC and other mechanical permits are issued by the Building Division through Citizenserve and priced on valuation, apart from the $75 flat fee for replacing one air handler and/or one condenser.
Fire protection work also pays the City’s fire fees (Resolution 2022-086, effective October 1, 2022): fire plan review is $100 for work under $1,000, or $50 plus 0.35% of the construction value for work over $1,000; plan revisions are $5 a page ($50 minimum). Fire inspections include $100 for an underground flush, $200 for sprinkler or underground hydrostatic tests, $150 per floor or riser for sprinkler and alarm tests, and $100 for hood and extinguishing system tests. The building fire final is included with the permit and the first fire re-inspection is free, then $75 each; any inspection booked with less than 24 hours’ notice adds $75, and failing to schedule the final fire inspection costs $100.
How to apply
Use City of Cocoa records and the project parcel before selecting a city permit type.
For new buildings and additions, confirm the finished floor will meet the City’s minimum height and any flood elevation.
Visit the Building Division in person with proof of ownership and your driver’s licence before applying.
Pick the permit type, upload the documents its submittal requirements list, and pay the $25 processing fee.
Respond to plan review comments ($100 per revision) and pay the invoice online or at the office between 8:00 a.m. and 4:00 p.m.
Request inspections in Citizenserve and pass the building and fire finals.
Rather not deal with the building department?
Get a free quote →Inspections
Cocoa allows inspection scheduling through Citizenserve. The same portal shows permit status and inspection results. Owner-builders must be on site for every inspection.
Building re-inspections cost $100 for a second failure, $150 for a third and $200 for four or more. On the fire side, the first re-inspection is free and later ones are $75, with $75 more for any inspection booked on less than 24 hours’ notice.
Local Cocoa details that matter
Minimum floor height: because of electrocution risk from flooding after heavy rain, City Code Section 6-104 requires finished floors to be at least 6 inches above adjoining grade or 10 inches above the average crown of the adjoining road, whichever is higher (the lower road governs on corner lots). Exceptions need a certified drainage plan showing water flows away from the foundation, a flood-proofing certification or a board of adjustment waiver. The City warns home buyers to check that no converted garage, carport or deck sits at or below grade.
Flood elevations: in flood hazard areas the City requires the lowest floor to be at least 1 foot above the base flood elevation (or the design flood elevation if higher), and enclosed areas below that level may only be used for parking, access or storage.
Hurricane protection: shutters and other devices need a permit and certified laboratory test results.
Florida building code
The Florida Building Code, 8th Edition (2023), has applied statewide since 31 December 2023; the Florida Building Commission has proposed the 9th Edition (2026) to take effect on 31 December 2026. Florida permit rules
Want this handled start to finish?
Get a free quote →FAQ
Who issues permits in Cocoa?
The City of Cocoa Building Division at 65 Stone Street (321-433-8501), part of the Community Services Department.
Can Cocoa permits be filed online?
Yes. The city states that all permit types can be applied for through Citizenserve.
How much is a building permit in Cocoa?
Many small residential jobs, such as fences, sheds, driveways and single HVAC replacements, are a flat $75. Other residential work starts at $75 for the first $1,000 plus $4 per $1,000, with a $25 processing fee and $150 plan review.
Can I pull my own permit?
Yes, for property you own and use, after appearing in person to have the Owner/Builder Disclosure Affidavit approved. LLC- and corporate-owned property does not qualify.
How high must a new floor be?
At least 6 inches above adjoining grade or 10 inches above the road crown, whichever is higher, and higher still in flood zones.
Which code edition applies?
The Florida Building Code, 8th Edition (2023), effective December 31, 2023, with the City’s local amendments for floor height and flood elevation.
Official resources
These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.
Inspections are where schedules slip.
Get a free quote →- Florida Building Commission
- Building & Permitting (Citizenserve and fees)
- Cocoa Citizenserve permitting portal
- Cocoa special building code rules
- City Code Chapter 6, building code amendments and floor height
Simplify Cocoa permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Florida. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Cocoa sooner?
Let Alliance prepare, file, and track your Cocoa permits while your crew stays on the job.
More Florida permitting guides
Brevard County
Read guide →Cape Canaveral
Read guide →Cocoa Beach
Read guide →City of Coconut Creek Building Permit Guide
Read guide →Collier County Building Permit Guide
Read guide →Columbia County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Cocoa permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.