In the Town of Little Elm, building permits are issued by the Building Safety Division of Development Services, and everything from applications to inspection requests runs through the MyGov portal. Plan review takes 10 business days for most permits once the application fee is paid, and since June 2026 the Town builds to the 2024 International codes and the 2023 National Electrical Code.
What requires a permit in Little Elm?
Anyone who builds, enlarges, alters, repairs, moves or demolishes a building, or changes its occupancy, needs a permit first, as does anyone installing or replacing a regulated plumbing system. The Town’s own project sheets set these thresholds:
Permit needed
- New homes, additions and remodels
- Detached accessory buildings over 200 sq ft, or more than one storey
- Patio covers, arbors and pergolas over 200 sq ft
- Pools and spas deeper than 24 inches, permanent or storable
- Every water heater replacement
- Building a fence, or repairing more than half its length
- Irrigation systems
- Commercial finish-outs and each new tenant’s certificate of occupancy
No permit needed
- One-storey detached accessory buildings of 200 sq ft or less, which must still meet setbacks
- Fence repairs shorter than one full side, in matching materials
- Stopping leaks in drain, water, waste or vent pipes
- Clearing stoppages and resetting a toilet without moving pipes or valves
In a subdivision with a homeowners association, the Town needs proof of the association’s architectural review approval before it approves the permit.
Who issues building permits in Little Elm?
The Town of Little Elm permits its own territory. Within Development Services, the Building Permits Division processes and issues construction permits and annual registrations, and the Building Safety Division reviews plans, inspects the work and issues certificates of occupancy. Building Safety also processes septic, health, alcohol and rental registrations. Unincorporated land around the Town is in Denton County.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Building Permits Division | 214-975-0456; permits@littleelm.org |
| Office | 100 W. Eldorado Parkway, Little Elm, TX 75068 |
| Commercial and certificate of occupancy questions | development@littleelm.org |
| Impact fees | Engineering, 214-975-0471 |
| Online portal | MyGov (applications, registrations, payments, inspections) |
MyGov accounts, credentials and contractor registration
To use MyGov, create a Collaborator account, validate your email, then request access to the Town of Little Elm. Next, add a credential: contractors upload their certificate of insurance and state licences, while architects, engineers, business owners and homeowners acting for themselves register as a Project Manager or Project Manager Residential. Most permit types cannot be filed without a credential.
Every trade that needs a licence must register with the Town before a permit application can be completed, and a master licence in that trade is needed to register. General, mechanical, fence, irrigation, backflow and sign contractors pay a $100 registration fee; electricians and plumbers register free. On a new home, irrigation system or fence, all subcontractors must be registered before the application is filed. Homeowners may do some licensed-trade work on their own home, but the permits are still required.
Little Elm permit fees
Little Elm’s building fees are set by Town Council resolution and added to each application in MyGov; the full fee table is not posted online. The Town’s project sheets give these amounts:
| Project | Fee |
|---|---|
| Patio cover, arbor or pergola | $50 application, $100 review, permit from $50 based on value |
| Pool or spa | $50 application plus $100–$250, depending on pool type |
| Water heater replacement | $50 |
| Commercial certificate of occupancy (no renovation) | $100 application fee |
| Contractor registration | $100; electricians, plumbers and homeowners exempt |
Not sure this scope needs a permit?
Get a free quote →Starting work without a permit adds an investigation fee equal to the permit fee, whether or not a permit is then issued. Re-inspection fees can be charged when work is not ready, a red tag repeats, a tag is removed, or erosion, trash or tree-protection controls lapse, and they must be paid before any more inspections on that site.
New development also pays water, wastewater and roadway impact fees, last amended in October 2017. They are assessed when the subdivision plat is filed and must be paid before the building permit is issued.
Trade work, pools and water heaters
Building Safety permits and inspects electrical, plumbing, mechanical and fuel gas work under the 2024 codes and 2023 electrical code adopted in June 2026. On a pool, the electric company’s representative must approve the plans before they go to the Town, plumbing and electrical work must be done by Town-registered licensed trades, and the pool gets belly steel and grounding, deck steel, gas (if heated) and final inspections. A water heater replacement needs a permit and a final inspection, and an expansion tank is required on Town-supplied water lines.
Commercial tenants go through fire review too: the certificate of occupancy process ends with a fire final inspection after the building final.
What to upload for a new home
- A plot plan with lot dimensions, footprint, setbacks, easements, driveway, sidewalk and fence locations, pad, floor and lot-corner elevations, and lot coverage
- A site-specific foundation plan designed and sealed by a Texas-registered engineer
- Framing, truss, floor system and lateral bracing documents from a registered design professional
- One PDF set of architectural, mechanical, electrical and plumbing plans, with combination smoke and carbon monoxide alarms shown on the electrical sheets
- Energy compliance documents with Manual J, S and D sizing
- Irrigation plans if a system is going in
Rather talk it over?
Call 1-855-478-4290 →The Town aims to post review comments within 10 business days. Answer them within 180 days of the comment date or the application expires; a resubmittal gets a further 5-day review. When the review is complete, MyGov moves to payment, and the permit issues once the fees are paid.
How to get a building permit in Little Elm
If your subdivision has an architectural review committee, get its written approval first.
Become a Collaborator, request access to the Town and add your contractor or Project Manager credential.
Make sure each subcontractor on the job is registered with the Town.
Pick the permit type, upload the plans and pay the application invoice to start review.
Answer comments within 180 days; review runs 10 business days, or 5 for a certificate of occupancy.
Pay the permit fees and any impact fees, then request each inspection in MyGov.
Inspections in Little Elm
Contractors request inspections online in MyGov. A request made before 7 a.m. is inspected the same business day; after 7 a.m., the next business day. Final inspections on accessory buildings, patio covers and pools must be booked within a week of finishing the work.
Rather not deal with the building department?
Get a free quote →New homes need an engineer’s pre-pour inspection of the foundation, with the engineer’s acceptance letter sent to the Town within 5 working days. The form board survey must be on site for the plumbing rough-in, and framing, rough electrical, rough mechanical and plumbing top-out are requested together. Insulation and energy items are checked by a third-party inspector, whose report is needed before the building final. At final, the inspector also looks for two canopy trees (at least one in front), sod on disturbed soil, finished sidewalks, the engineer’s foundation letter and the termite treatment record.
For a commercial tenant with no renovation, the order is meter release, building final, fire final and then the certificate of occupancy final, with the space fully set up for business.
Little Elm rules that shape projects
Accessory buildings: at least 3 feet from side and rear property lines and fences, never larger than the house, and capped by lot size: one building and 750 sq ft on lots under half an acre, two and 1,000 sq ft up to one acre, and three totalling 2,500 sq ft above that.
Fences: no taller than 8 feet, kept 15 feet from the curb on corner lots, and any side facing a street must be cedar board-on-board with a decorative cap.
Pools: at least 5 feet from the property line, never in a floodway or easement, with temporary fencing during construction and the permanent barrier in place before the pool is filled.
Foundations: every new foundation, and any addition to a post-tension slab, must be designed and sealed by a Texas-registered engineer. Local design values are 105 mph wind, a 6-inch frost line and very heavy termite risk.
Texas building code
Texas has no single statewide building code: state law makes the International Residential Code the base code for homes in cities and the International Building Code the base for commercial buildings, with each city choosing the edition and its own amendments, while the National Electrical Code and the energy code apply statewide. Outside city limits most counties issue no building permits for homes. Texas building code rules
Want this handled start to finish?
Get a free quote →Little Elm permit search and official resources
- Little Elm Building Permits Division
- Little Elm Building Safety
- Little Elm residential permits and project sheets
- Little Elm commercial permits
- Little Elm MyGov portal
- Introduction to the online submittal process (PDF)
- Residential Building Packet (PDF)
- Commercial certificate of occupancy guide (PDF)
- Little Elm impact fee information
- Code of Ordinances, Chapter 22 technical codes
Little Elm permit FAQs
Inspections are where schedules slip.
Get a free quote →Which building codes does Little Elm use?
The 2024 International Building, Residential, Fire, Mechanical, Fuel Gas, Plumbing, Energy, Property Maintenance and Swimming Pool codes and the 2023 National Electrical Code, adopted by Ordinance 1857 in June 2026. Some Town web pages still list the 2018 codes.
Do I need a permit for a shed in Little Elm?
Not for a one-storey detached building of 200 sq ft or less, although setbacks still apply. Anything larger needs a permit.
Do I need a permit for a fence?
Yes, for a new fence or a repair covering more than half its length. Fences can be up to 8 feet tall.
How long does plan review take?
10 business days for most permits and 5 for a certificate of occupancy, counted from payment of the application fee.
Do I need a permit to replace a water heater?
Yes. Every replacement needs a $50 permit and a final inspection.
When will my inspection happen?
Requests made in MyGov before 7 a.m. are inspected that business day; later requests the next business day.
Can a homeowner pull a permit?
Yes. Register in MyGov as a Project Manager Residential; homeowners pay no registration fee.
Simplify Little Elm permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Texas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Little Elm sooner?
Let Alliance prepare, file, and track your Little Elm permits while your crew stays on the job.