Llano County, Texas Building Permit Guide

Llano County issues development, floodplain and septic permits outside the cities, with no county building permit; Llano, Horseshoe Bay and Sunrise Beach Village permit their own.

Authority: Llano County Development Services / 911 AddressingSeptic: $225 standard systemPhone: 325-247-2039
County authority
Development Services & 9-1-1 Addressing100 W Sandstone St., Ste 200A, Llano
Review time
7–10 business daysNon-floodplain development
Permit contact
325-247-2039Apply online in iWorQ
2025 population
23,353

Outside city limits, Llano County Development Services issues development, floodplain and septic permits and 911 addresses through its iWorQ portal, but no building or trade permit. A standard septic permit costs $225, and non-floodplain applications take about 7–10 business days. Llano, Horseshoe Bay and Sunrise Beach Village issue their own building permits.

What needs a county permit in Llano County?

County Development Services

  • Development permit for new residential or commercial construction (needed before a 911 address is assigned)
  • Floodplain development permit for work in a mapped flood zone, including clearing and demolition
  • Septic (OSSF) permit, on any size of tract
  • Road cuts and utility work in county roads
  • Plats, replats, RV parks and manufactured home rental communities

No county permit

  • Building permit or building inspections for a home outside city limits
  • Electrical, plumbing or mechanical permits outside city limits

The county’s approval matrix sends development, floodplain, septic and 911 applications to county staff, while plats, replats, variances and appeals go to Commissioners Court. All development is also subject to the deed restrictions of the subdivision it sits in.

Short on time to read all of this?

Get a free quote →

Who issues permits in Llano County?

Area or workWho issues permits
City of LlanoCode Enforcement Department: building, plumbing, electrical and mechanical permits and inspections; 301 W Main St., 325-247-4158 ext. 3
Horseshoe Bay (Llano County part)City Development Services: building, inspections and land development, filed in GovWell since October 5, 2026; 1 Community Drive, 830-598-9959
Sunrise Beach VillageThe City: development and building permits under Ordinance 347.4; 124 Sunrise Drive, 325-388-6438
Unincorporated countyDevelopment Services: development, floodplain, septic, road cut and 911 address permits; 100 W Sandstone Street, Ste 200A, Llano, 325-247-2039
Septic within the Highland Lakes zoneLower Colorado River Authority (LCRA) OSSF program, 512-578-3216
Plats, replats and variancesLlano County Commissioners Court, after Development Services review

Kingsland and other unincorporated communities have no city permit office, so the county rules above apply there. Horseshoe Bay addresses come from the City, not the county 911 office.

Llano County fees, septic and trade rules

Development Services sends an invoice when a fee applies, and the fee must be paid before the permit is issued. The posted fee schedule dates its floodplain fees to April 14, 2008:

Llano County development and septic fees
PermitFee
Floodplain development, standard residential$200
Floodplain development, commercial$200 plus $0.10 per sq ft (apartments, offices and hotels: $15 per unit)
Floodplain: smaller non-residential structures, land clearing, basic demolition$50
Floodplain, complex project$300
Septic, standard trench and tank$225
Septic, aerobic, low-pressure dosing or engineered (residential)$350
Septic, commercial$450
Septic, non-major repair$100
LCRA compliance letter$25; no charge with a development permit
911 address applicationNo charge
Road cut or utility construction in a county road$250 for 50 ft plus $5 per extra foot

Not sure this scope needs a permit?

Get a free quote →

Starting work in the floodplain without the right permit doubles the fee. Subdivision fees in the May 2025 regulations are $300 plus $10 per lot for a plat, or $500 plus $10 per lot where the plat contains a designated floodplain, plus $250 plus $10 per space for RV parks and manufactured home rental communities. Those regulations set a replat at $200, while the separate fee sheet still shows $100. The County accepts credit cards, checks, money orders and cashier’s checks.

Septic coverage: under its 2018 OSSF order, the County permits and inspects every septic system regardless of tract size, outside city limits and outside areas already covered by another rule. Within 2,200 feet of the upper Highland Lakes, LCRA is TCEQ’s authorized agent and issues the septic permit instead. Inside Horseshoe Bay, TCEQ lists the septic work as handled by the County away from the lakes and by LCRA within its zone. A septic application in iWorQ must include the system design.

Trades: the county issues no electrical, plumbing or mechanical permits. The City of Llano permits all four trades in town, and Horseshoe Bay requires a permit for any electrical, HVAC or plumbing work and registration ($100) of every contractor and subcontractor.

Rather talk it over?

Call 1-855-478-4290 →

How to apply in unincorporated Llano County

1. Find the flood zone

Look up the parcel on the FEMA map linked from the Development Services page or the county GIS web map; Johnson Creek maps were revised by a FEMA letter of map revision on April 17, 2026.

2. Gather the property papers

Have the warranty deed (if bought within the last year), the lease agreement for owner-financed land, and a Letter of Authorization if you are not the owner.

3. Draw a site map

A survey or aerial map must show where the structure goes and where the driveway leaves the public road; the address number is set from those locations.

4. Apply in iWorQ

File a Development Permit for the structure and, where there is no sewer, a Septic Permit with the uploaded design.

5. Pay the invoice

Development Services sends an invoice when a fee is due; the permit is issued after payment.

6. Post the address and book inspections

Request septic and floodplain inspections through the iWorQ portal and post the 911 number where it can be seen from the road.

Floodplain and 911 address requirements

Zone A: new development needs an elevation certificate based on the construction plans, a site plan with ground elevations at the four outer corners, plans showing foundation, anchoring and flood vents (with every enclosure below base flood elevation), an engineered compaction study if fill raises the building, and driver’s licence details for both owner and builder. Every structure on the job, including carports, sheds, docks and pools, goes on the same application.

Zone AE and floodway: add an engineer’s statement with the legal description showing no more than a 1-foot rise (Zone AE) or no rise at all (floodway), and no adverse impact on neighbors. Pre-FIRM buildings (built before 1991) may be improved or repaired up to 50% of appraised building value before the whole structure must meet the flood order; the cost is proven with a contractor bid for labor and materials.

Rather not deal with the Llano County building department?

Get a free quote →

911 addresses: the County assigns an address only for a structure or development project, once the permits are in place. Numbers must be reflective, at least 3 inches tall, and mounted 5 to 7 feet high where they are visible from the road. A red reflective sign costs $12, takes 7–10 business days and must be collected at the office; it is not available inside city limits.

Lots and setbacks: new subdivision lots without community water and sewer need at least 1 acre, or 0.5 acre with community water. Platted building lines sit 25 feet from the right-of-way and 10 feet from sides and rear on lots of 0.5 acre or more.

Texas building code

Texas has no single statewide building code: state law makes the International Residential Code the base code for homes in cities and the International Building Code the base for commercial buildings, with each city choosing the edition and its own amendments, while the National Electrical Code and the energy code apply statewide. Outside city limits most counties issue no building permits for homes. Texas building code rules

Llano County official permit resources

County, LCRA and city pages:

Want this handled start to finish?

Get a free quote →

Llano County building and development FAQ

Do I need a building permit to build a house in unincorporated Llano County?

There is no county building permit, but you need a county development permit for the structure, a septic permit if there is no sewer, and a floodplain permit in a flood zone.

How much is a septic permit in Llano County?

$225 for a standard trench-and-tank system, $350 for an aerobic, low-pressure dosing or engineered home system and $450 for a commercial system. Near the upper Highland Lakes, LCRA issues the permit.

How long does a Llano County development permit take?

Allow 7–10 business days outside the floodplain; floodplain, septic and commercial applications can take longer.

Inspections are where schedules slip.

Get a free quote →

Can I get a 911 address for a vacant lot?

No. The County assigns addresses only to structures or development projects, so apply when you are ready for utilities or will build within six months.

Who issues permits in Kingsland?

Kingsland is unincorporated, so Llano County Development Services handles development, floodplain and 911 permits, and LCRA issues septic permits within its Highland Lakes zone.

How long does City of Llano plan review take?

The City’s 2026 application allows 2–3 weeks and up to 45 days. Permits are valid for 180 days, extendable to 365 days once work has started.

What does a new home permit cost in Sunrise Beach Village?

$250 plus $0.40 per conditioned sq ft and $0.25 per unconditioned sq ft, with a $1,500 refundable deposit.

Simplify Llano County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Texas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Llano County sooner?

Let Alliance prepare, file, and track your Llano County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Llano County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.