The City of Lockhart’s Development Services Department issues building, electrical, plumbing and mechanical permits inside city limits, and every application is filed online in My Government Online (MGO). Under the fee schedule in force since September 16, 2026, a new house costs $0.45 per square foot plus a 50% plan check fee, and the City answers most applications within 10 business days (14 for new construction) after the fee is paid.
What requires a permit in Lockhart?
The City’s permit FAQ says most work that physically changes or adds a structure needs a permit. Its own lists:
Permit needed
- New homes, ADUs, remodels and additions
- Sheds, carports, garages, decks, patios and pergolas
- Pools, spas, hot tubs and pool enclosures
- Fences taller than 2.5 feet
- Roof, siding, window and exterior door replacement
- New or altered driveways and flatwork
- All plumbing, electrical and HVAC installations, repairs and replacements, water heaters and softeners included
- Solar panels, irrigation systems, tree removal
- Demolition, moving a structure, manufactured home installation
No permit
- Painting, wallpaper, tile, carpet and similar finishes
- Sheetrock repair
- Cabinets and countertops
- Swings and play equipment
- Prefabricated pools under 24 inches deep
- Fixing a leak or clogged drain without replacing concealed piping
City codes apply only inside the city limits. In Lockhart’s extraterritorial jurisdiction (ETJ), the City applies its subdivision and sign regulations, while site construction and septic permits for unincorporated land come from Caldwell County Sanitation/Development Services, 1700 FM 2720 (512-398-1803).
Who issues building permits in Lockhart?
Development Services at City Hall holds both the Planning Division and the Building Division. The Building Division reviews plans, issues permits, inspects work and enforces the property maintenance code. Ben Belk is the Building Official. New single-family homes and commercial projects are plan-reviewed and inspected by Bureau Veritas, the City’s third-party provider; remodels, additions, accessory buildings, fences and trade work are inspected by City staff.
Short on time to read all of this?
Get a free quote →| Need | Contact |
|---|---|
| Office | City Hall, 308 W. San Antonio St., Lockhart, TX 78644 (mail: P.O. Box 239) |
| Main line and MGO help | 512-398-3461, permits@lockhart-tx.org |
| Building Official | Ben Belk, 512-398-2803 |
| Permits, fees, contractor licensing | Permit Technician, 512-376-9939 |
| Trade permits, contractor registration, payments | Development Services Assistant, 512-376-6757 |
| Online filing | My Government Online (mgoconnect.org) |
Filing in MGO and the forms you need
Lockhart moved all building and planning permit requests to My Government Online. Create an account first; contractors and tradespeople must also register with the City after creating it. Every Permit Request Form needs the confirmation number from a Texas811 call made before digging.
- General Contractor Application: a notarized City licence application with eight required items, among them three reference letters, proof of a bona fide office and a bond of $1,000, $5,000 or $10,000 depending on job value. Class A licences (any building) cost $150, Class B (homes of up to two units) $100 and Class C (single-family alterations) $50; renewals are $100, $50 and $25, and every licence expires on December 31.
- Trade registration: electrical, plumbing and mechanical contractors send a driver’s licence, their state licence and a liability certificate naming the City of Lockhart as certificate holder. It lapses when the state licence does.
- Residential Permit and Submittal Guidelines and the Site Plan Sheet and Sample, showing what a residential plan set must contain.
- ROW Excavation Application, for digging in the public right-of-way.
- Certificate for Alteration, for exterior work in the Courthouse Historic District or on a landmark.
Lockhart permit fees (FY 2026–2027)
Ordinance 2026-36 created the City’s first comprehensive fee schedule, effective September 16, 2026. Residential charges:
| Project | Fee |
|---|---|
| New house, duplex or ADU | $0.45 per sq ft |
| Repair or remodel | $0.45 per sq ft |
| Plan check | 50% of the building permit fee |
| Carport, garage, shed, deck or patio cover | $125 each |
| Re-roof or driveway | $125 each |
| Swimming pool | $150 |
| Demolition | $150 |
| Moving a building | $125 |
| Tree removal | $100 |
| Permit renewal | $75 |
| Re-inspection | $150 |
Not sure this scope needs a permit?
Get a free quote →A new 2,000 sq ft house therefore carries a $900 building permit and a $450 plan check fee, before trade permits and utility charges. The adopted schedule lists a residential addition at $125 and a residential fence at $50, while the City’s fee web page still shows additions at $0.45 per sq ft and fences at $125. Starting work before the permit is issued doubles the fee.
Commercial and multi-family: new buildings pay separate plan review and inspection fees from valuation tables (for example, $387.59 plus $2.19 per extra $1,000 for plan review between $100,001 and $500,000); the schedule also lists a commercial plan check fee of 50% of the building permit fee. Valuation is the declared value or the ICC Building Valuation Data figure, whichever is greater, and reviews and inspections outsourced to the third-party firm carry a 5% administrative fee. A commercial certificate of occupancy is $200, a 30-day temporary one $350, and signs cost $100 plus $1 per sq ft.
Electrical, plumbing and mechanical permits
Each trade submits its own Permit Info Form, signed by the master licence holder, and the trade contractor must already be registered with the City.
| Permit | Fee |
|---|---|
| Residential plumbing, electrical or mechanical (new or remodel) | $125 each |
| Residential electrical meter loop | $125 |
| Residential electric tap (overhead service) | $200 |
| Commercial plumbing or mechanical, new construction | $150, plus $20 per unit in hotels and multi-family |
| Commercial electrical, new or remodel | $150 |
| Commercial electric tap | Set by the City Electric Utility, 512-398-6117 |
Rather talk it over?
Call 1-855-478-4290 →Lockhart runs its own electric utility, so the tap fee is paid to the City. Electrical work follows the 2017 National Electrical Code with local amendments, and buildings follow the 2018 International Building, Residential and Existing Building Codes adopted by Ordinance 2021-39.
New home submittal and review times
The City’s new single-family packet asks the builder to book a pre-construction meeting with the Building Official first, and to have the general contractor and all three trades registered before applying. A complete packet has five parts:
- The general contractor’s Permit Info Form, with the Texas811 confirmation number
- A separate Permit Info Form from each trade, signed by its master licence holder
- Plans: a closed-form survey and site plan at 1 inch = 20 feet with setbacks, driveway, A/C pad, parking and landscaping; a floor plan with window U-factor and SHGC values; four elevations; framing details with wind bracing; and a foundation plan sealed by a Texas engineer, with the engineer’s design letter
- An energy compliance report showing 2018 IECC compliance (REScheck, REM/Rate or IC3)
- The Public Works right-of-way excavation application
City code requires plans for new homes and for additions over 300 sq ft to carry the seal of a licensed architect or a certified building designer unless the Building Official approves otherwise.
Review starts only after the application fee is paid. The City gives its comments within 10 full business days, or up to 14 for new construction. For new homes, Bureau Veritas sends comments directly to the builder; after approval the City asks for printed sets (plans at 11 by 17 inches, documents at 8.5 by 11), calculates the remaining fees, and the permit becomes valid once they are paid.
Rather not deal with the building department?
Get a free quote →How to get a Lockhart building permit
Make sure the lot is inside city limits, and ask Planning about zoning, platting, floodplain or historic review before you draw plans.
The general contractor applies for a City licence (reviewed in 1–2 days) and each trade submits its licence and insurance.
Put the confirmation number on the Permit Request Form.
Upload the application and plans. Within 48 hours a balance due appears on the dashboard; paying it starts the review.
Respond to City or Bureau Veritas comments, and deliver printed approved plans for new homes.
Begin work only once MGO shows Permit Issued, then request inspections from the same page.
Inspections and job site rules
For every request, give your name, phone number, the address, the permit number and the inspection type.
- City inspections (remodels, additions, accessory structures, fences and trade permits): 737-787-7957 or the City inspection email.
- Bureau Veritas inspections (new homes and commercial projects): request through the MGO dashboard, call 877-837-8775 or email inspectionstx@bureauveritas.com.
A typical new home moves through temporary pole, plumbing rough, water service, yard sewer, closed-form survey, foundation, electrical, mechanical and gas rough, plumbing top-out, framing, insulation, flatwork and approach, then the trade, energy and building finals.
The City’s job site expectations require the posted permit and the BV-stamped plans on site at all times, a portable toilet and trash container before work begins, 48-inch orange mesh fencing next to occupied lots, a concrete washout area, and work hours of 7:00 a.m. to 6:00 p.m., Monday to Friday, with no weekend work.
Local rules that affect Lockhart projects
Historic district: most exterior changes in the Courthouse Historic District, or to a designated landmark elsewhere, need a $50 Certificate for Alteration from the Historical Preservation Commission before the permit is issued. Applications go to the next Commission meeting at least two weeks away; repainting in the same color and routine maintenance are exempt, and the decision can be appealed to City Council within 30 days.
Fences: a fence permit needs a site plan showing the lot and fence location. It lasts six months, with one six-month extension on written request; like-for-like repairs that add no new post holes need no permit.
Want this handled start to finish?
Get a free quote →Impact fees and taps: the City’s fee page lists water impact fees of $4,562.36 and wastewater impact fees of $5,792.42 per living unit equivalent, roadway fees of $1,501 (Service Area 1) or $1,806 (Service Area 2) per vehicle mile, a 3/4-inch water tap at $750 plus the meter, and a 4-inch sewer tap at $1,200.
Texas building code
Texas has no single statewide building code: state law makes the International Residential Code the base code for homes in cities and the International Building Code the base for commercial buildings, with each city choosing the edition and its own amendments, while the National Electrical Code and the energy code apply statewide. Outside city limits most counties issue no building permits for homes. Texas building code rules
Lockhart official permit resources
- Lockhart Permit Applications and MGO guides
- Do I need a permit? (City FAQ)
- Lockhart fee schedule page
- FY 2026–2027 Comprehensive Fee Schedule (PDF)
- How to Apply for a New SFR Permit (PDF)
- Permit process, payment and inspection requests (PDF)
- New Construction Inspections and Job Site Expectations (PDF)
- Construction Standards and Contractor License Information
- General Contractor Application (PDF)
- Development Services contacts
- Certificate for Alteration and other how-to guides
- Lockhart Code of Ordinances
- Caldwell County Sanitation/Development Services (outside city limits)
Inspections are where schedules slip.
Get a free quote →Lockhart building permit FAQs
How much is a building permit for a new house in Lockhart?
$0.45 per square foot plus a plan check fee of half that amount, so $1,350 for a 2,000 sq ft house before trade permits, taps and impact fees.
How long does Lockhart take to review a permit?
Comments are due within 10 full business days after payment, or up to 14 for new construction.
Do I need a permit for a fence in Lockhart?
Yes, for any fence over 2.5 feet tall. The permit is valid for six months.
Do I need a permit to replace a water heater or windows?
Yes. The City lists water heater and softener replacements, and window and exterior door replacements, among the work that needs a permit.
Who inspects new homes in Lockhart?
Bureau Veritas, the City’s third-party provider. Book through MGO or at 877-837-8775; City staff inspect remodels, accessory buildings, fences and trade jobs (737-787-7957).
Does a contractor need a Lockhart licence?
Yes. General contractors hold a City licence that expires every December 31, and electrical, plumbing and mechanical contractors register with their state licence and insurance.
What codes does Lockhart use?
The 2018 International Building, Residential and Existing Building Codes and the 2017 National Electrical Code, with local amendments.
Simplify Lockhart permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Texas. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Lockhart sooner?
Let Alliance prepare, file, and track your Lockhart permits while your crew stays on the job.
More Texas permitting guides
This guide is provided by Alliance Permitting for general information about Lockhart permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.