Murray County, Oklahoma Building Permit Guide

Murray County issues no building permits; in Sulphur and Davis the city permits and inspects construction, and outside them DEQ permits septic systems and the State Fire Marshal permits buildings in International Building Code occupancy classes.

Authority: No county building permit (OUBCC list); Sulphur and Davis permit locallyRural IBC-class buildings: State Fire MarshalCounty office (OUBCC listing): 580-622-3777
2025 population
13,805
County building permit
Not issued
Cities that permit
Sulphur, Davis
Sulphur commercial plan review
State Fire Marshal, Okie Safety or ICC (applicant’s choice)

Murray County does not issue building permits: the state building code commission lists the county, and the towns of Dougherty and Hickory, as issuing none. Sulphur and Davis run their own permit and inspection programs inside city limits. On unincorporated land, septic systems are permitted by the Oklahoma Department of Environmental Quality (DEQ), and buildings in the International Building Code’s occupancy classes need a State Fire Marshal permit.

Who issues permits in Murray County?

Murray County has four incorporated places:

Building permits in Murray County towns
TownWho issues building permits
Sulphur (city)City of Sulphur, City Hall, 600 W. Broadway, 580-622-5096. The city’s Code Enforcement page posts its building permit and inspection process. On the State Fire Marshal’s list since March 24, 2023.
Davis (city, partly in Murray County)Community Development Services at Davis City Hall, 227 E. Main, 580-369-3333, open 8 a.m. to 5 p.m. On the State Fire Marshal’s list since September 29, 2025.
Dougherty, HickoryListed by the state building code commission as issuing no permits; the published sources do not say otherwise. Ask the town: Dougherty 580-993-2312, Hickory 580-456-7419.

Short on time to read all of this?

Get a free quote →

The county itself is listed by the commission at PO Box 240, Sulphur, 580-622-3777. Because Sulphur and Davis are on the State Fire Marshal’s list of local plan review authorities, their permits stand in for the state permit inside city limits, except on state-owned buildings. Where no local authority issues building permits, the State Fire Marshal requires its own permit (OAC 265:25-1-4), at $0.20 per square foot of building with a $100 minimum (OAC 265:60-1-2).

Rural Murray County

  • State Fire Marshal building permit for buildings in International Building Code occupancy classes
  • DEQ permit for a septic or onsite sewage system
  • Construction Industries Board licensees for electrical, plumbing and mechanical work

Not issued by the county

  • Building permits
  • Trade permits
  • Certificates of occupancy

Building permits in Sulphur

Sulphur publishes its building permit and inspection process; in short:

Not sure this scope needs a permit?

Get a free quote →
1. Apply

Fill in the residential or commercial building permit application.

2. Assemble the city’s list

Plans (architectural or engineered, depending on the building) with plumbing, electrical and mechanical line drawings from the contractors; a survey of the property lines; the purpose and use of the building; and, for an existing structure not built to the city’s adopted codes, an engineer’s report.

3. Site plan review

The city’s Site Plan Review Team, made up of city officials, checks the plans against the city’s infrastructure, and the plans go to any committee, board or commission that must see them.

4. Commercial plan review

Commercial plans go to a plan review consultant the applicant chooses from the city’s list (the State Fire Marshal, Okie Safety Consulting or the International Code Council’s plan review service), at the applicant’s own cost; the city permit is issued once the consultant approves.

5. Pay and build

The permit and inspection fees are set by the number of inspections needed; temporary utility service can then be set up.

6. Inspections and occupancy

Call for footing, rough-in, top-out and final inspections; after the final walk-through the certificate of occupancy is issued and permanent utility service can start.

The use stated on the permit cannot change after issue without city or consultant approval, and changes to the plans may bring more fees and inspections. Its process sheet (posted in 2024) lists the 2018 International codes and the 2020 National Electrical Code and says all codes used in Sulphur are those adopted by the Oklahoma Uniform Building Code Commission, whose minimum has been the 2024 editions and the 2023 National Electrical Code since September 14, 2026; the code books can be viewed at City Hall.

Rather talk it over?

Call 1-855-478-4290 →

Building permits and contractors in Davis

Davis requires a building permit to build a new structure or to enlarge, alter or move an existing building. Its Community Development Services office takes residential questions through the City Planner (ext. 27) and commercial questions through Economic Development and Community Services (ext. 32) at 580-369-3333.

  • Contractor registration: electrical, plumbing and mechanical contractors and journeymen must register with the city, showing a valid Oklahoma licence and photo ID and paying the fee. The city will not approve a building project without registered electrical, mechanical and plumbing contractors.
  • Sub-Contractor Compliance Letter: one is due from each contractor when its work is complete, before the final inspection and the certificate of occupancy.
  • Floodplain: any development in a floodplain, including buildings, fill or grading, needs a Floodplain Development Permit in addition to the building permit. The city’s local floodplain administrator is reached through City Hall.

Local Murray County details

Sulphur floodplain: the Oklahoma Water Resources Board’s directory lists Sulphur’s floodplain administrator at the city’s code inspector line, 580-622-5096.

Rather not deal with the Murray County building department?

Get a free quote →

After hours in Davis: emergency water, sewer and street problems go to the city’s dispatch line, 580-369-2323.

Oklahoma building code

Oklahoma sets statewide minimum codes (the 2024 editions since September 14, 2026) that cities enforce and may strengthen; most counties issue no building permits for unincorporated land, though a few do. Oklahoma rules

Official Murray County permit resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Want this handled start to finish?

Get a free quote →

Murray County permit FAQs

Does Murray County issue building permits?

No; the county appears on the state commission’s list as a non-permitting jurisdiction. Sulphur and Davis issue building permits inside their limits.

Who issues building permits in Sulphur?

The City of Sulphur at City Hall, 600 W. Broadway (580-622-5096). Commercial plans also need approval from a plan review consultant the applicant chooses.

Who issues building permits in Davis?

Davis Community Development Services at City Hall, 580-369-3333: ext. 27 for residential projects and ext. 32 for commercial projects.

Inspections are where schedules slip.

Get a free quote →

Do contractors need to register in Davis?

Yes. Electrical, plumbing and mechanical contractors and journeymen register with the city using their state licence and photo ID.

What about building outside the cities?

There is no county building permit. DEQ permits septic systems, and the State Fire Marshal permits buildings in the International Building Code’s occupancy classes where no local authority does.

Simplify Murray County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Oklahoma. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Murray County sooner?

Let Alliance prepare, file, and track your Murray County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Murray County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.