Skip to main content
Municipal GuideOklahomaGlenpool · Tulsa County

Glenpool, Oklahoma Building Permit Guide

Glenpool’s Building Division at City Hall on South Yukon Avenue issues building and trade permits for property inside the city and books inspections by email.

Authority: City of Glenpool Building Division (Development Services)Code: Title 10, Ordinance 796; plans list the 2018 I-Codes and 2017 NECPhone: 918-209-4610
2025 population
14,705
Permit office
918-209-4610, Permit@CityofGlenpool.com
New house
$10 permit + $8 inspection per 100 sq ft (2011 schedule)
Same-day inspection
Email request before 8:00 a.m.

The City of Glenpool’s Building Division, part of Development Services, reviews plans and issues building, electrical, plumbing and mechanical permits for work inside city limits; Joel Huff is the Building Official. Under the fee schedule the City still posts (approved February 7, 2011), a new house is charged $10 per 100 sq ft for the permit and $8 per 100 sq ft for inspections, and inspection requests emailed before 8:00 a.m. are done the same day.

What needs a permit in Glenpool?

Title 10 of the City Code bars erecting, moving, adding to, enclosing or structurally altering any structure without a permit unless the building official approves an exemption in writing. The Building Division’s list of required residential permits spells out the everyday cases:

Permit required

  • New homes, additions and remodels that involve framing or electrical, plumbing or mechanical work
  • Roof replacements, even shingles only (repairs of 3 squares or less excepted)
  • Water heater and air conditioning or furnace replacements
  • Window replacements and brick or siding replacement
  • Sheds, patio covers, shade structures, storm shelters and decks over 30 inches high
  • Concrete flatwork over 200 sq ft, and driveway approaches or sidewalks
  • Pools above or below ground, hot tubs, irrigation, water treatment systems, fire sprinklers and outdoor kitchens

No permit

  • Painting, carpeting, wallpaper, cabinets, trim and gutters
  • Playground equipment and trampolines
  • Residential fences 7 feet tall or less (commercial fences and fences over 7 feet need one)

Who issues building permits in Glenpool?

The Building Division in Development Services handles permits, plan review and inspections. Plans get a concurrent review by Building, Engineering, Fire, Health and Planning/Zoning; fire alarm and sprinkler plans go to the Glenpool Fire Department and civil plans to Public Works. Floodplain, earth change and zoning applications are on the City’s Codes of Ordinances & Development Permits page.

Short on time to read all of this?

Get a free quote →
Glenpool Building Division
DetailInformation
OfficeCity Hall, 12205 S. Yukon Ave., Glenpool, OK 74033
Permits918-209-4610 · fax 918-209-4611 · Permit@CityofGlenpool.com
Building OfficialJoel Huff, CBO, 918-209-4616
HoursMonday–Thursday 7:30 a.m.–noon and 1:00–5:30 p.m.; Friday 7:30–11:30 a.m.
Fire Department (fire plans)14536 S. Elwood Ave., 918-322-2172
Floodplain administrator918-209-4630 (state OWRB list)

Glenpool lies wholly in Tulsa County, so land outside the city limits is permitted by Tulsa County Inspections. Permits that need attention are not accepted after 4:00 p.m. unless they are simply left for review.

Trade permits and contractor registration

Every general and trade contractor must register with the City before starting work: $100 per trade each year, with a copy of the driver’s licence, the State trade licence for electrical, mechanical and plumbing contractors, and a liability insurance certificate naming the City. The registration requirements sheet says registrations renew each June 30, while the online form says they expire one year after approval; inspections stop if a registration lapses mid-project.

Stand-alone trade jobs, such as a water heater, panel change-out or three-piece HVAC change-out, use the online Trades Permit Application, which carries a $30 fee paid by phone with Visa or Mastercard; it is not used for trade work under a general contractor’s permit. A gas test and city inspection are needed before the gas company restores service after a system is altered or repaired: the lines must hold 3 psi for 10 minutes. A homeowner doing electrical, plumbing, HVAC or irrigation work on their own homestead signs the City’s Homeowner’s Affidavit and must hire a registered contractor if the work fails and cannot be corrected. Roofing permits are issued only to a registered general contractor.

Glenpool permit fees

Title 10 says permit and plan review fees follow the City’s separately published fee schedule. The Community Development Fee Schedule posted on the Fee Schedule page is the one approved by the City Council on February 7, 2011. The plan review fee is a deposit paid at application and credited toward the later fees, not an extra charge.

Not sure this scope needs a permit?

Get a free quote →
Glenpool building fees (schedule approved February 7, 2011)
ProjectFee
New one- or two-family home$10 per 100 sq ft permit + $8 per 100 sq ft inspections + $25 zoning clearance + $5 state fee
Plan review deposit, new home$100, credited toward the fees
Water and wastewater impact fee$4 per 100 sq ft
Water tap; sewer tap; water deposit$800; $200; $50
Parks and recreation fee$150 plus $25 per bedroom
Remodel, detached garage, accessory building or attached patio cover$50 permit + $100 inspections + $25 zoning + $5 state ($50 review deposit)
In-ground swimming pool$250 permit + $100 inspections + $25 zoning + $5 state
Re-roofing$25 permit + $25 inspection + $5 state
Re-inspection; missed inspection fine$50; $100
Work started without a permit$200 fine (commercial $500)
New commercial building$9 per 100 sq ft permit + $9 per 100 sq ft inspections; $400 review deposit
Certificate of occupancy; change of use$50 each
Floodplain development; earth change; driveway or curb cut$100; $100; $25

For example, a new 2,000 sq ft house is charged $200 for the permit, $160 for inspections, $80 for the water and wastewater impact fee, $25 for zoning clearance and $5 in state fees, or $470, with the $100 plan review deposit credited toward that amount; taps, the water deposit and the parks fee are added on top. Re-submitted plans cost extra, and a permit abandoned before any inspection is refunded except 25%, with the plan review payment kept.

Rather talk it over?

Call 1-855-478-4290 →

Plans and plan review

New house

  • Completed application with lot, block and subdivision, square footage, valuation and subcontractors
  • Full plans by a registered design professional (hand-drawn plans are refused): elevations, roof plan, framing with braced wall layout, and mechanical, electrical and plumbing plans
  • Engineered, stamped foundation design
  • Site plan with property lines, setbacks, easements and the legal description
  • Energy documentation: REScheck, IC3 or the Glenpool Energy Compliance Worksheet
  • Site Drainage Acknowledgement and Utility Service Agreement

New commercial

  • Site plan approved by Planning and Zoning before the building review starts
  • One paper set (at least 24 x 36 inches) and one digital set of plans by a design professional
  • Code summary sheet, energy design (COMcheck or similar) and a geotechnical report or engineered foundation
  • Application, Utility Service Agreement and Site Drainage Acknowledgement

Corrections must be returned within 180 days. Construction must begin within 180 days of issue (the City Code says six months), and at least one inspection has to pass every 180 days or the permit is treated as abandoned. Irrigation, outdoor kitchens, pools, patio covers not on the house plans, fire sprinklers, water treatment systems, accessory buildings and fences each need their own permit. Where neither Glenpool nor Creek County Rural Water District No. 2 has ever served a lot with water, the owner may choose either provider; lots in the Released Area once served by Creek-2 stay with Creek-2.

How to get a Glenpool building permit

1. Register the contractors

The general contractor and each trade register with the City ($100 per trade) before any work starts.

2. Check zoning and site permits

Commercial site plans need Planning and Zoning approval first; floodplain or earth change permits are separate applications.

3. Submit the application and plans

Send the permit application, plan set and required forms to the Building Division with the plan review deposit.

4. Answer the review comments

Building, Engineering, Fire, Health and Planning review together; return corrections within 180 days.

5. Pay and collect the permit

All fees are paid before the permit is issued; post it in a window visible from the street.

6. Inspect through to the certificate

Email each inspection request; meter releases follow the rough, top-out and frame approvals, and the certificate of occupancy follows the final.

Rather not deal with the building department?

Get a free quote →

Inspections in Glenpool

Request inspections through the online Inspection Request form or by email to Inspections@cityofglenpool.com, giving the permit number, address, project type, inspection type and a contact email for the results. Requests received before 8:00 a.m. are inspected the same day; later ones go to the next business day. Monday to Thursday you may ask for a morning or afternoon visit, and Friday inspections are mornings only. An emergency same-day inspection needs the Building Official’s approval first (918-209-4616).

A new house moves through T-pole and plumbing rough, foundation with under-slab electrical, sheathing, a combined framing and trades inspection, insulation, drywall or brick, meter releases, the trade and energy finals and the building final with the certificate of occupancy. A form board survey is due at plumbing rough for homes on floodplain land, and an engineer’s stamped foundation report at framing; termite, drainage and energy reports come in by the final.

Plumbing rough and foundation inspections may be postponed in bad weather. Inspectors will not enter an occupied home unless an adult is present, attic stairs must be down for framing and finals, and no other workers should be inside. A re-inspection costs $50, paid before the visit.

Local Glenpool rules

Construction hours: on weekdays work may not start before 7:00 a.m. or run past 8:00 p.m.; on weekends the window is 9:00 a.m. to 6:00 p.m. After-hours work needs a written permit from the city manager.

Job sites: before work goes past footing excavation, each lot needs a portable toilet, a posted street address and a trash container of at least 4 x 4 feet. Developments need a concrete washout station, trash fences once homes are occupied, and orange fencing around open excavations; burning debris on site is not allowed.

Want this handled start to finish?

Get a free quote →

Restaurants: a certificate of occupancy for a food or drink business is issued only after the Tulsa County Health Department clears it.

Code edition: Ordinance 796 (December 13, 2021) adopted the 2018 International Codes for permits whose plans were approved from April 15, 2022, and the City’s submittal sheets still list the 2018 I-Codes and the 2017 NEC with the current OUBCC rules.

Oklahoma building code

Oklahoma sets statewide minimum codes (the 2024 editions since September 14, 2026) that cities enforce and may strengthen; most counties issue no building permits for unincorporated land, though a few do. Oklahoma rules

Official Glenpool permit resources

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Inspections are where schedules slip.

Get a free quote →

Glenpool permit FAQs

Who issues building permits in Glenpool?

The City’s Building Division in Development Services, at City Hall, 12205 S. Yukon Ave. (918-209-4610). Joel Huff is the Building Official.

How much is a building permit for a new house in Glenpool?

On the 2011 schedule the City posts, $10 per 100 sq ft for the permit plus $8 per 100 sq ft for inspections, $4 per 100 sq ft impact fee, $25 zoning clearance and $5 state fee: $470 for 2,000 sq ft, before taps and the parks fee.

Do I need a permit to replace my roof in Glenpool?

Yes, even for shingles only, unless the repair is 3 squares or less. Only a registered general contractor can get the permit, and a full tear-off with new underlayment is required.

Do I need a permit for a fence?

Not for a residential fence up to 7 feet tall. Fences on commercial property and fences over 7 feet need a permit.

How do I book an inspection?

Use the online request form or email Inspections@cityofglenpool.com. Requests in before 8:00 a.m. are done the same day; Friday inspections are mornings only.

Can a homeowner do their own trade work?

On their own homestead, yes, by signing the Homeowner’s Affidavit and doing all the work themselves.

Simplify Glenpool permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Oklahoma. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Glenpool sooner?

Let Alliance prepare, file, and track your Glenpool permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Glenpool permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.