Highland County’s government offices include an Engineer, a Planning Commission, a sewer district and a health department, but no building department. Hillsboro, the county seat and only city, runs its own Building Department for building, electrical and mechanical permits. In the rest of the county the County Engineer issues driveway and house number permits for $40, the Planning Commission handles lot splits under the 2005 subdivision regulations, and the Highland County Health Department permits septic systems and wells and, through a contract with Clinton County, commercial plumbing. FEMA lists unincorporated Highland County among the communities not in the National Flood Insurance Program.
What requires a building permit in Highland County?
What you need depends on whether the land is inside Hillsboro, in a village, or in one of the townships, and on whether the building is a house or a commercial building.
Inside Hillsboro
- All new construction, additions, alterations and major repairs, including structural, mechanical and electrical changes
- A certificate of occupancy for new buildings, additions and changes of occupancy
- Zoning review under Chapter 155 of the city code
- A Certificate of Appropriateness for locally designated historic properties
Across the county
- Driveway and house number permit for county and township roads ($40)
- Right-of-way utility and moving permits from the County Engineer
- Lot splits and minor subdivisions through the Planning Commission
- Septic system and private water system permits
- Commercial plumbing permits for new commercial buildings and plumbing alterations in commercial facilities
For one-, two- and three-family homes, Hillsboro exempts repairs and replacement of windows without enlarging the opening, gutters and downspouts, siding, flag poles, and rear-yard storage sheds up to 200 square feet and 8 feet in average height (which still need zoning approval), unless the property is in the historic district. Outside the city, county pages name no certified building department; check the Board of Building Standards look-up for the address, and where no certified department has jurisdiction, state law sends nonresidential plans to the Superintendent of Industrial Compliance and requires no plan submission for a house.
What the county decides and what the state holds
The building codes and certification of departments are the state’s. Locally, the Board of Health adopts the septic, water and plumbing fees, the Planning Commission administers the subdivision regulations, the Engineer sets the conveyance standards (adopted February 26, 2015) and road permit terms, and Hillsboro keeps its own zoning code (Chapter 155) and building fee schedules.
Short on time to read all of this?
Get a free quote →Highland County building department: who handles permitting
Hillsboro’s Building Department enforces the building, electrical and mechanical codes and issues the related permits and certificates of occupancy inside the city; corrections that run past six months need the Chief Building Official’s written extension. The county government’s office list has no building department, so for the villages and townships the useful county offices are the ones below.
| Office | Role and contact |
|---|---|
| Hillsboro Building Department | Building, electrical and mechanical permits and certificates of occupancy in the city; City Administration Building, 130 North High Street, Hillsboro, OH 45133; 937-393-5219; 8:00 a.m. to 4:30 p.m. weekdays |
| Highland County Health Department | Septic systems, private water systems, commercial plumbing, food and pool licenses; 1487 North High Street, Suite 400, Hillsboro; 937-393-1941; Monday and Wednesday 8:00 to 5:30, Tuesday, Thursday and Friday 8:00 to 4:00 |
| Highland County Engineer | Driveway and house number, right-of-way utility and moving permits; office listed at 138 Bowers Avenue, Hillsboro, with a new mailing address of 520 East Main St., P.O. Box 297; 937-393-3496 |
| Highland County Planning Commission | Lot splits, minor and large-lot subdivisions; 119 Governor Foraker Place, Suite 211, Hillsboro; 937-393-1911 |
| Highland County Sewer District | County sewer service; 119 Governor Foraker Place, Suite 202; 937-393-8749 |
| Highland Soil and Water Conservation District | 514 Harry Sauner Road, Suite 2, Hillsboro; 937-393-1922 ext. 3 |
The city and the villages
Hillsboro (about 6,760 people) is the only city. Most of Greenfield (about 4,330 people in Highland County) and parts of Lynchburg and Sardinia lie in the county, along with Highland, Leesburg, Mowrystown and Sinking Spring. The county pages do not say who handles building or zoning in each village, so ask the village office before planning work there, and check the BBS look-up for commercial plans.
Highland County permit types
Each office keeps its own forms: Hillsboro takes applications in person, by mail or by email, the Engineer takes its driveway and house number application online with payment by check or in person, and the Health Department takes plumbing applications in person or by mail.
Not sure this scope needs a permit?
Get a free quote →Residential permits
- Hillsboro building permits: an application with supporting structural, energy and soils documents where applicable and three sets of drawings; plans for one-, two- and three-family homes generally need no seal unless an architect or engineer prepared them.
- Septic systems: a site review application to the Health Department, a soil evaluation from an outside evaluator (the department does not offer that service), a design, then the sewage permit, which includes the first operation and maintenance permit.
- Private water systems: a permit for a new well, pond or conversion, with up to three water samples included.
- Driveways and house numbers: the Engineer’s online application, which asks for the parcel number, road, township and driveway type.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
In Hillsboro, commercial plans and construction documents must be prepared by an Ohio-registered architect or professional engineer. Commercial plumbing anywhere in the county needs a Health Department permit: new commercial construction, new fixtures where none existed, pipe changes, and water heater or fixture replacements all count. The Health Department contracts with the Clinton County Health Department for the plumbing inspections, but permits are bought in Hillsboro. Food businesses also need a Health Department plan review ($231 in 2026 for a small operation) and license.
For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Lot splits. Use the Planning Commission’s minor or large-lot subdivision, adjoining-land or agricultural and recreational application; a split without septic approval has its own form.
- Zoning. Hillsboro reviews zoning with every building application; zone changes, variances and conditional uses start with the city’s Building Department and go to its Planning Commission, which also sits as the Zoning Board of Appeals.
- Septic and water. On unsewered land, the Health Department’s site review and permits come before construction.
- Road access. The Engineer’s driveway permit covers both county and township roads.
Highland County permit costs and fees
There is no county building fee schedule. Hillsboro publishes separate residential and commercial fee schedules on its Building Department page, and fees are paid when the plan approval is picked up. The Board of Building Standards adds 1% (residential) or 3% (nonresidential) to fees collected by a certified department. Health fees below are from the Board of Health’s 2026 schedule (effective December 1, 2025) and the 2027 schedule adopted on October 15, 2026.
Rather talk it over?
Call 1-855-478-4290 →| Work | Fee |
|---|---|
| Engineer driveway / house number application | $40 |
| Septic site review, per lot | $343 (2026); $360 (2027 schedule) |
| Sewage system permit, new or alteration | $339 (2026); $352 (2027 schedule), state fees included |
| New private water system, single family | $214 (2026); $220 (2027 schedule) |
| Pond, single family | $194 (2026); $200 (2027 schedule) |
| Commercial plumbing permit | $200 application + $20 per trap and fixture + $200 plan review |
| Commercial single-fixture plumbing permit | $100 flat |
| Septic, water or plumbing work begun without a permit | 25% penalty on the local fee |
Worked example from the Health Department’s plumbing page: a commercial restroom remodel with 5 traps and fixtures costs $200 + (5 × $20 = $100) + $200 plan review = $500, while a single water heater replacement in a commercial building is the $100 single-fixture permit. Ask the department which schedule applies on your filing date, since the 2027 fees were adopted in October 2026.
Trade permits and who may pull them
Inside Hillsboro, electrical and mechanical permits come from the city’s Building Department with the building approval, and applications may be made by the owner, the person in control, an authorized agent, the architect or engineer, or the owner’s contractor. Commercial plumbing is permitted by the county Health Department, which does not register local plumbers and points to the Ohio Construction Industry Licensing Board for commercial plumbing licenses; it states that it does not regulate residential plumbing work. Septic installers, haulers and service providers register with the Health Department ($41 in 2026).
Rather not deal with the Highland County building department?
Get a free quote →How to apply for a permit in Highland County
Check whether it is in Hillsboro (use the city’s GIS and zoning map), a village or a township.
File the Planning Commission’s subdivision or lot split application.
Hire a soil evaluator, then apply to the Health Department for the site review and sewage and well permits.
Submit the Engineer’s online driveway and house number application and pay the $40 fee by check or in person.
In Hillsboro, submit three sets of plans at 130 North High Street, by mail or by email; elsewhere, use the BBS look-up to find the department, if any, for the address.
Send the plumbing application, fee and two sets of drawings to the Health Department.
Review, corrections and what causes delay
Hillsboro checks applications for completeness, assigns a permit number and sends the plans to its plans examiner; any outside approvals must be in before the plan approval certificate issues. A correction letter must be answered within six months or the application lapses, and a revision fee is added when the plans are approved. A denial can be appealed to the city’s Board of Building Appeals.
Inspections and certificates
In Hillsboro, inspections start after the plan approval is issued and fees are paid; book them at 937-393-5219, keep the approval certificate and plans on site, and ask whether the project qualifies for a virtual inspection. A certificate of occupancy is needed for new buildings, additions and changes of occupancy, and for alterations except those in one-, two- and three-family homes that create no new habitable space; a temporary certificate lasts 30 days. Commercial plumbing inspections are carried out under the Health Department’s contract with Clinton County, and septic installations are inspected by the Health Department.
Ohio building code in Highland County
FEMA’s Community Status Book lists unincorporated Highland County (community 390769) under “Communities Not in the National Flood Program”; the same row gives a first flood rate map date of March 3, 2011 and a current effective map date of November 19, 2021. That row covers unincorporated land only; Hillsboro and the villages take part, or not, on their own.
Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Want this handled start to finish?
Get a free quote →Highland County permit search and official resources
The Health Department’s online property record search shows sewage system, water system and nuisance records for a property. Building permit records for Hillsboro are held by the city’s Building Department, and lot split files by the Planning Commission.
- Hillsboro Building Department
- Hillsboro zoning and GIS
- Highland County Health Department commercial plumbing
- Highland County Health Department environmental health
- 2026 environmental health fee schedule (PDF)
- Adopted 2027 fee schedule (PDF)
- County Engineer driveway and house number application
- County Engineer right-of-way utility application
- Highland County conveyance standards (PDF)
- Highland County Planning Commission forms
- Subdivision Regulations, December 2005 (PDF)
- Highland County offices and contacts
- FEMA Community Status Book, Ohio
Inspections are where schedules slip.
Get a free quote →Highland County building permit FAQs
Does Highland County have a building department?
The county’s office list shows none; Hillsboro runs a city Building Department, and elsewhere the BBS look-up shows which department, if any, covers an address.
How much is a septic permit in Highland County?
Under the 2026 schedule, a $343 site review and a $339 sewage permit; the 2027 schedule adopted in October 2026 raises them to $360 and $352.
Who issues commercial plumbing permits?
The Highland County Health Department, with inspections by Clinton County under contract; the permit is $200 plus $20 per trap and fixture and a $200 plan review.
Does the Health Department inspect plumbing in my house?
No; it states that it does not regulate residential plumbing work.
Do I need a permit for a driveway?
Yes, on county and township roads: the Engineer’s driveway and house number permit, with a $40 application fee.
Is unincorporated Highland County in the flood insurance program?
No. FEMA lists it under the communities not in the National Flood Program; its row shows a current effective map date of November 19, 2021.
Can I build a shed in Hillsboro without a permit?
A rear-yard shed up to 200 square feet and 8 feet in average height needs no building permit at a home, but it does need zoning approval, and historic properties need a Certificate of Appropriateness.
Simplify Highland County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Highland County sooner?
Let Alliance prepare, file, and track your Highland County permits while your crew stays on the job.
More Ohio permitting guides
Brown County
Read guide →Clinton County
Read guide →Ross County
Read guide →Hilliard Building Permit Guide
Read guide →Hocking County Building Permit Guide
Read guide →Holmes County Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Highland County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.