Brown County, Ohio Building Permit Guide

To get a building permit in Brown County, confirm which office issues permits for the property’s address, then submit the application with your plans and required documents, pay the permit fees, and pass inspections before final approval. Alliance Permitting can prepare, file and track the permit for you and schedule the inspections.

The Brown County Building Department at 800 Mt. Orab Pike in Georgetown permits and inspects one-, two- and three-family homes, and since January 2026 the county also takes commercial permits, reviewed under contract by Ohio Valley Inspection Company.

Authority: Brown County Building DepartmentSeat: GeorgetownPhone: 937-378-4716
Houses
County departmentDirector James Berry
New home fee
$4001,001–2,000 sq ft living area
Commercial
County since 2026Reviewed by contract firm
Hours
7:30–4:00 weekdaysClosed 12:30–1:00

In Brown County, house permits come from the Brown County Building Department, 800 Mt. Orab Pike, Suite 111, Georgetown (937-378-4716), which administers the Residential Code of Ohio for one-, two- and three-family dwellings under director James Berry. In 2025 the commissioners hired Ohio Valley Inspection Company of Hillsboro to process and approve commercial permits, and from January 1, 2026 the county department has taken commercial applications and payments too. A new house with 1,001 to 2,000 square feet of living area costs $400 on the posted residential schedule, which includes the $100 plan review fee.

What requires a building permit in Brown County?

The Building Department lists the residential work it permits. Commercial, industrial and multi-family buildings fall under the Ohio Building Code and the county’s commercial program, which uses a separate application.

County house permit

  • New one-, two- and three-family dwellings
  • Additions and attached garages
  • Detached garages and accessory buildings over 200 square feet
  • Structural remodeling
  • Demolition of a house

Not a county building permit

  • Manufactured homes: the department no longer permits or inspects them
  • Detached garages of 200 square feet or less
  • Septic and plumbing (Health Department)
  • Zoning (township or village)

Commercial work covered by the county’s commercial fee packet includes new buildings, additions and alterations, changes of use, footing-and-foundation-only approvals, decks and ramps, pools, roof replacements, fences over 7 feet, retaining walls, signs, tents, cell towers, spray booths, kitchen hoods and suppression, fire alarms, fire lines and gas piping, plus commercial electrical work from new services to EV chargers, solar panels and battery storage.

What Brown County decides and what the state holds

The residential and commercial codes are written by the state; the county decides how it staffs enforcement and what it charges. In June 2025 the commissioners found it was not feasible to expand the existing department for commercial work and contracted the review out instead, and in March 2026 they agreed to extend county commercial permitting into the villages of Georgetown, Ripley and Aberdeen. The county also runs subdivision review through the Planning Commission. Zoning belongs to the townships and villages, and the Health Department controls septic systems and plumbing.

Brown County building department: who handles permitting

For houses, the Brown County Building Department describes its purpose as administering a residential code for one-, two- and three-family dwellings in Brown County, and its application form has spaces for both a township and a village. Mount Orab’s zoning page confirms that residential building permits inside that village come from the county after the village zoning permit. For commercial and industrial work, Mount Orab now issues its own permits through a village building department.

Short on time to read all of this?

Get a free quote →
Who handles commercial building permits in Brown County
PlaceCommercial permits
Unincorporated townshipsBrown County, with plans reviewed by Ohio Valley Inspection Company under the June 25, 2025 contract
Georgetown, Ripley and Aberdeen villagesBrown County under the memorandum of understanding approved March 30, 2026
Mount Orab villageVillage of Mt. Orab Building Department
Fayetteville, Hamersville, Higginsport, Russellville and the Brown County part of SardiniaNot stated on the county’s pages; ask the village and check the BBS look-up map

The Planning Commission, set up by the commissioners on July 10, 1962, advises them on land use in the unincorporated areas; its 11 members are eight appointed citizens and the three commissioners. The county has no cities; its nine villages range from Higginsport (219 people) to Georgetown, the county seat (4,450), in the 2025 Census estimate, and the county as a whole has 44,397.

Brown County permit contacts
DetailInformation
Building Department800 Mt. Orab Pike, Suite 111, Georgetown, OH 45121; 937-378-4716; building@browncountyohio.gov
Hours7:30 a.m. to 4:00 p.m. weekdays, closed 12:30 to 1:00
Commercial information937-433-4642, as printed on the commercial application
Health Department826 Mt. Orab Pike, Georgetown; 937-378-6892 or 866-867-6892; 8:00 a.m. to 4:30 p.m.
Soil and Water Conservation District706 South Main Street, Georgetown; 937-378-4424, ext. 4
Mount Orab zoningZoning Administrator, 211 South High Street; 937-444-6401, ext. 228

Brown County permit types

Residential permits

The residential application asks for the project address, lot and subdivision, the village or township, the owner, contractor and designer, whether the job is new construction, an alteration or a garage, the number of stories, square footage and foundation type, the parcel number from the County Auditor, the Health Department’s septic approval number, whether the Planning Commission approved the lot and whether flood regulations apply. Two sets of plans go in with the fee, and the permit is issued once the plans are approved. The department’s permit checklist asks for the signed checklist before you apply.

Commercial permits

The commercial building and electrical permit application goes to the same Georgetown office, by email to building@browncountyohio.gov with digital plans; if the plans are too large to email, ask for a Dropbox link. You tick what you want reviewed, from a new building or addition to HVAC, electrical, gas lines, fences, decks, sheds, fire alarm, fire lines, fire suppression, hoods, signs, pools, a certificate of occupancy or a change of use, and give the use group, construction type, occupant load and whether the property is in a floodplain. A non-refundable deposit is due with the application.

Not sure this scope needs a permit?

Get a free quote →

What comes before the building permit

  • Planning Commission. Lots created by subdivision need approval under the county subdivision regulations adopted in March 2003 and amended in 2007. A Technical Review Committee of the County Engineer, Health Department, Planning Commission and Soil and Water Conservation District meets weekly on surveys and plats, and the commission meets at 8:00 a.m. on the third Tuesday of the month.
  • Soil and Water. A sediment and erosion control plan is on the residential checklist.
  • Health Department. Septic and plumbing permits; the septic approval number goes on the building application.
  • County Engineer. Approval of the driveway curb cut and the address.
  • Local zoning. A zoning permit from the township or village. In Mount Orab it must come before the county permit and is valid for six months.
  • Flood. A flood permit from the jurisdiction in mapped flood areas.

Brown County permit costs and fees

The residential schedule the department posts is marked effective January 1, 2019, and still carries the office’s former address, so ask whether it remains current. Fees for new construction and alterations go by living area; garages and accessory buildings over 200 square feet go by total area. Every band includes a $100 plan review and processing fee.

Brown County residential fees (schedule effective January 1, 2019)
AreaFee
0–500 sq ft$250 new construction or alteration; $200 garage or accessory building
501–1,000 sq ft$300; $250
1,001–2,000 sq ft$400; $300
2,001–3,000 sq ft$500; $350
3,001–4,000 sq ft$600; $400
4,001 sq ft and over$650; $450
Demolition of a house$100
Re-inspection or additional inspection$50
Plan review after the second review$75
Additional certificate of occupancy after closing$20

So a 1,800-square-foot house pays $400 and a 600-square-foot detached garage $250. A permit expires if no work starts within 12 months; reactivating it costs the permit fee less the $100 plan review fee, and the fee is refunded less $100 within six months if no inspections have been done.

Rather talk it over?

Call 1-855-478-4290 →

Commercial work starts with a non-refundable deposit: $868.14 for a building, addition or alteration (HVAC and electrical not included), $845.31 for a change of use, $572.50 for footing and foundation only, $731.69 for a pool, $295.71 for a roof replacement and $103 for anything not listed. Commercial electrical is a $60 application fee plus $225 and $6.50 per 100 square feet of affected area, with plan review at $40 per half hour and a 3% state fee on the total. The packet then sets out Hamilton County’s building fee calculation, effective January 1, 2026 (gross area × $143.68 × a construction-type factor × a use multiplier, including a 5% technology fee and the state surcharge), and says fees it does not list follow the Hamilton County code. Ask the department how the deposit is credited against the final fee.

Brown County commercial electrical fees and other charges (commercial packet)
ItemFee
Electrical application fee, all permits$60
New work, additions or alterations$225 base + $6.50 per 100 square feet
Service upgrade or change$70, plus $60 for additional wiring
Temporary pole; service release; minor alteration$50 each
Solar PV$15 per panel
EV charger; battery storage$80 per outlet; $75 per connection
Traffic signals or generators$200
Temporary certificate of occupancy (deposit)$304.96
Permit renewal or extension (deposit)$103
Before-hours inspection (deposit)$743.70 for the 2-hour minimum, $185.93 each extra hour

Trade permits and who may pull them

For houses, the Building Department’s page lists four residential state electrical inspectors with their ESI numbers and phone numbers, and the rough and final electrical approvals must be in place before the framing and final building inspections. Commercial electrical goes on the county’s combined commercial building and electrical application. On commercial jobs, electrical fees for fire alarms and HVAC replacements are included in the building permit, with no separate submittal.

  • Plumbing: the Health Department handles plumbing permits and inspections; Mount Orab notes that it inspects plumbing in the village too.
  • Septic: on-site septic approval comes from the Health Department before the building application.
  • Licenses: commercial electrical, HVAC, hydronics, plumbing and refrigeration contractors need the Ohio Construction Industry Licensing Board license; the county’s pages show no local contractor registration and say nothing about homeowner permits.

Rather not deal with the Brown County building department?

Get a free quote →

How to apply for a Brown County building permit

1. Confirm the jurisdiction

Find the township or village; in Mount Orab commercial work goes to the village.

2. Get zoning and lot approval

Township or village zoning permit, and Planning Commission approval if the lot is new.

3. Clear health, soil and road items

Septic approval, an erosion control plan and the County Engineer’s curb cut and address.

4. Complete the application

Residential or commercial form, signed, with the parcel number and the signed checklist.

5. Submit plans and the fee or deposit

Two sets of house plans, or digital commercial plans by email or Dropbox.

6. Collect the permit

Issued once the plans are approved; then book inspections a day ahead.

Review, corrections and what causes delay

A missing septic approval number, Planning Commission sign-off or local zoning permit holds a house application, because each is on the checklist the department wants signed first. A third plan review costs $75. On commercial jobs, revisions to approved plans are charged on the packet’s revision lines, and a temporary certificate of occupancy has its own fee.

Inspections and certificates in Brown County

Request inspections 24 hours ahead. For new homes and additions the department lists these stages:

  • Foundation: excavations dug and forms or stakes set, before concrete is poured.
  • Slab or under-floor: reinforcing and in-slab or under-floor services in place, before concrete or subfloor.
  • Framing and mechanical: ready for drywall, with rough heating in place, rough plumbing and electrical approved and all framing done.
  • Fireplace: before the first flue liner on a masonry fireplace, or before a factory-built unit is concealed.
  • Final: the building complete, with final electrical, plumbing and septic approvals.

For a demolition, the final inspection checks that the site and utilities are secure. An extra or failed inspection costs $50 on the residential schedule and $185.93 on the commercial one.

Ohio building code in Brown County

The county department enforces the Residential Code of Ohio for houses, and its commercial program applies the Ohio Building Code. FEMA’s Community Status Book lists unincorporated Brown County (community 390034) as participating in the National Flood Insurance Program, with flood maps effective September 29, 2010; each village is listed separately from the county row.

Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works

Want this handled start to finish?

Get a free quote →

Brown County permit search and official resources

Permit files for houses and county commercial work are kept by the Building Department in Georgetown; ask there for past permits, approved plans or certificates of occupancy, giving the parcel number. The commissioners’ journals posted on the county site record contracts and agreements such as the 2025 commercial contract and the 2026 village memorandum.

Inspections are where schedules slip.

Get a free quote →

Brown County building permit FAQs

Who issues house permits in Brown County?

The Brown County Building Department at 800 Mt. Orab Pike, Suite 111, Georgetown (937-378-4716), for one-, two- and three-family homes.

Does the county permit manufactured homes?

No. The department says it no longer issues permits or performs inspections for manufactured homes.

Does a detached garage need a county permit?

Only if it is over 200 square feet; a 600-square-foot garage costs $250 on the posted schedule. A local zoning permit may still be needed for a smaller one.

Who handles commercial permits?

The county, with plan review by its contractor Ohio Valley Inspection Company, in the townships and in Georgetown, Ripley and Aberdeen; Mount Orab issues its own commercial permits.

How much is a permit for a new house?

It depends on living area: $400 for 1,001 to 2,000 square feet, rising to $650 above 4,000, including the $100 plan review fee.

Who inspects electrical work on a house?

One of the residential state electrical inspectors listed, with ESI numbers, on the Building Department’s page.

What happens if I do not start work within a year?

The house permit expires after 12 months without work. Reactivating it costs the permit fee less the $100 plan review fee.

Do I need anything before applying?

Yes: septic approval from the Health Department, a sediment and erosion control plan, the Engineer’s curb cut, the local zoning permit and, for new lots, Planning Commission approval.

Simplify Brown County permitting with Alliance Permitting

250K+Permits approved
All 50States covered
21+ YearsJurisdictional depth
Done-for-youWe file, you build

Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Brown County sooner?

Let Alliance prepare, file, and track your Brown County permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Brown County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.