Building permits in the City of Brunswick come from the city’s own Building Division at the Municipal Center, 4095 Center Road (330-558-6830), not from the Medina County Building Department. The division issues residential and commercial permits, registers contractors, schedules and performs inspections, and checks storm water and sediment control on building sites; James Lenahan is the Chief Building Official. Applications and contractor registrations can be left in the gray drop box in the City Hall vestibule at any hour, but permits are not issued on the same day and checks are the preferred payment.
What requires a building permit in Brunswick?
Brunswick’s permits page says permits are required for home improvement projects including, but not limited to, the list below. The division also asks owners to contact it before starting any project, and its contractor advice warns owners to be wary of a contractor who asks the owner to get the permit.
Permit required (city list)
- Building additions, and basement or interior remodeling
- Decks and storage sheds
- Roofing, siding and replacement windows
- Water heaters, furnaces and central air conditioning
- Electrical work
- Fences and swimming pools
- Concrete flat work
Other city applications
- Zoning certificate for sheds, garages and additions
- Solar electric systems and generators
- Permanent and temporary signs, tents and membrane structures
- Fire alarm and fire suppression systems, through the Division of Fire
- Work in the public right-of-way, through the City Engineer
The list is not complete, so call the division about any job it does not name. A new building also needs a sanitary sewer permit from the Medina County Sanitary Engineers, and any food service use needs a Medina County Health Department permit.
What Brunswick decides and what the state holds
The state adopts the Ohio building codes and certifies the departments that enforce them, and work may not begin before plans are approved. Brunswick decides its own permit fees under Chapter 1442 of its codified ordinances, which the city has amended at Section 1442.02(a), registers contractors, administers zoning through its Planning Commission and Board of Zoning Appeals, hears building code appeals before its own five-member Board of Building Code Appeals, and enforces property maintenance and residential rental registration. It also requires every recreational vehicle kept at a home to be registered each year with the Division of Building under Ordinance 55-11, which limits where campers, boats and trailers may be parked; zoning and property maintenance complaints go to the division at 330-558-6830.
Short on time to read all of this?
Get a free quote →Brunswick building department: who handles permitting
The Building Division handles building, electrical and mechanical permits and the inspections that follow, along with zoning certificates through its Planning & Zoning Coordinator and property maintenance through its zoning inspectors. The Medina County Building Department serves the townships, villages and Wadsworth, but not Brunswick, so Brunswick Hills Township addresses outside the city go to the county instead. Use the Medina County Auditor’s property search, linked from the division’s page, to confirm a parcel is inside the city before preparing drawings.
| Item | Detail |
|---|---|
| Building Division | Municipal Center, 4095 Center Road, Brunswick, OH 44212 |
| Phone / fax | 330-558-6830 / 330-273-8036 (Municipal Center main line 330-225-9144) |
| Chief Building Official | James Lenahan |
| After-hours drop-off | Gray metal drop box in the City Hall vestibule, open 24 hours a day |
| City Engineer (flood plain, addresses, grading) | 4095 Center Road; 330-558-6880; weekdays 8:30 a.m. to 5:00 p.m. |
| County plumbing program (contractor registration, permits and inspections in the county) | Medina County Health Department, 330-723-9523 |
| Sanitary sewer permits | Medina County Sanitary Engineers |
Brunswick permit types
Brunswick posts its applications on its Forms for Builders and Contractors page, grouped as building, fire, electrical, engineering and storm water, reference guides and registrations.
Residential permits
- Residential Plan Approval & Permit Application: for new homes, additions and alterations, with a residential certificate of occupancy application at the end of the job.
- Decks: a residential deck construction guide sets out what the plans must show.
- Pools, spas and fences: each has its own application, and the city publishes a swimming pool reference guide.
- Solar and generators: a solar electric system permit application, a solar PV reference guide and generator requirements.
- Zoning certificate: sheds, garages and additions need a zoning certificate application as well.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
New commercial and industrial buildings, additions and alterations use the Non-Residential Plan Approval & Permit Application, with an Ohio Building Code statement of special inspections where the code calls for one, and a commercial certificate of occupancy application before the space is used. Fire alarm and fire suppression systems go to the Division of Fire on its own applications, which also cover hydrant use, hydrant specifications and a hazardous material inventory statement. Signs, tents and membrane structures, mobile food service and massage establishments have their own forms.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning. A zoning certificate covers sheds, garages and additions; variances and appeals from a refused building or zoning permit go to the five-member Board of Zoning Appeals, with separate residential and commercial applications.
- Site plans and subdivisions. The City Engineer reviews preliminary and final plats, individual building topographic surveys, and commercial, industrial and multi-family site plans, and advises on drainage, grading, detention and the sizing of storm sewers and drive culverts; the Planning Commission posts its agendas and minutes.
- Flood plain and riparian areas. The City Engineer reviews and approves all construction in FEMA-designated flood plains, and the city publishes a riparian setback map.
- Storm water. Sites track their storm water pollution prevention plan on the city’s SWP3 form, and the Building Division inspects runoff and sediment control.
- Sewer and right-of-way. New buildings need a Medina County Sanitary Engineers sewer permit; work in the street needs a city right-of-way permit.
Brunswick permit costs and fees
Brunswick sets its building permit fees in Chapter 1442 of its codified ordinances, and Section 1442.02(a) has been amended. The division posts separate residential and commercial permit fee sheets on its Building page, and its permits page explains that fees for new homes are based on the square footage of each component of the house. Ask the division at 330-558-6830 for the current sheet before budgeting.
| Item | Detail |
|---|---|
| Building permits | City fee sheets under Chapter 1442; new homes priced by the square footage of each component |
| State Board of Building Standards assessment | Added to local fees: 1% on residential and 3% on nonresidential work |
| Contractor registration | City registration with insurance, state license and a performance bond (contractor bond form) |
| County sewer permit (Medina County Sanitary Engineers, schedule updated September 1, 2026) | $50 application; $500 if the permit is secured after construction is underway |
| County sewer system investment fee / sewer tap | $3,400 for a ¾-inch meter, more for larger meters / $210 for a 4- or 6-inch connection made by county crews |
| Plumbing permit | City division or the Medina County Health Department program; ask which applies |
| Food service permit | Medina County Health Department |
| Payment | Cash, check or credit card; checks strongly preferred |
Rather talk it over?
Call 1-855-478-4290 →Because permits are not issued the same day, plan for at least one return trip or a call-back once the fee has been calculated. The county sewer charges are separate from the city permit: the Sanitary Engineers issue the sewer permit, schedule the tap and inspect the service line from the Medina County Permit Center behind the Engineering Center at 791 West Smith Road, Medina, where their fee schedule also sets a $200 plan review for non-residential permit applications. Rental dwelling units and recreational vehicles are registered separately with the city.
Trade permits and who may pull them
Electrical, heating and air conditioning work needs a Brunswick permit, and the division has its own electrical inspector. Every contractor working in the city must be registered with Brunswick and provide insurance information, a state certificate or license where the trade requires one, and a performance bond; the city publishes a contractor registration form, a bond form and a list of registered contractors by trade, from general contractors and roofers to plumbers, electricians and fence builders.
- Plumbing: rough plumbing is among the mandatory inspections for new buildings. The Medina County Health Department says plumbing in new homes and businesses in the county is permitted and inspected through its plumbing program, which also registers plumbing contractors, so ask the division which office takes the plumbing permit for your job.
- State licenses: commercial electrical, HVAC, hydronics, plumbing and refrigeration contractors need the state OCILB license, which the city asks to see at registration.
- Homeowners: the city’s advice to owners is to have the contractor obtain the permits; ask the division before applying for an owner permit.
- Fire protection: fire alarm and suppression contractors file with the Division of Fire.
- Sewer work: the Medina County Sanitary Engineers register the contractors who connect to the county sewer and keep their own registered contractor list.
Rather not deal with the building department?
Get a free quote →How to apply for a Brunswick building permit
Check the parcel on the Medina County Auditor’s property search; township addresses go to the county.
Each contractor files the registration and bond forms with proof of insurance and any state license.
Get the zoning certificate, any Board of Zoning Appeals relief, and the City Engineer’s review of grading, flood plain or topographic survey.
Use the residential or non-residential plan approval and permit application, with drawings and any special inspection statement.
Bring it in by appointment or leave it in the drop box in the City Hall vestibule.
Pick up the permit once it is approved, on a later day, paying by check, cash or card.
Review, corrections and what causes delay
The most common delays come from steps outside the building review: an unregistered contractor, a missing zoning certificate, a sewer permit not yet issued by the county Sanitary Engineers, or a lot that needs the City Engineer’s grading or flood plain approval. Calling ahead to book a time with staff avoids waiting at the counter, and decisions the applicant disagrees with can be appealed to the Board of Building Code Appeals for code questions or the Board of Zoning Appeals for zoning refusals.
Inspections in Brunswick
Schedule inspections at least 24 hours in advance by calling the Building Division at 330-558-6830; electrical inspection questions go to the division’s electrical inspector. For a new building the city lists these mandatory inspections:
- Sewers and footings, then the temporary electric service
- Foundation, including stone, footer drains and downspouts, and the elevation of the foundation walls
- Rough mechanical, plumbing and electrical, then rough framing and insulation
- Base and form work for driveways and sidewalks, and a pre-pour check on concrete flat work
- The permanent electric service installation
- Final building inspection and final property grade inspection
Commercial and residential certificates of occupancy each have their own application. The division also inspects storm water runoff and sediment control on active sites to meet Ohio EPA requirements, and its zoning inspectors follow up on property maintenance complaints. Sewer taps and service line inspections are scheduled separately with the Sanitary Engineers’ permit department, which also offers online permit status look-up and inspection scheduling and asks for at least 24 hours’ notice to cancel or move a scheduled tap.
Ohio building code in Brunswick
Brunswick’s own Building Division enforces the statewide Ohio codes inside the city. FEMA’s Community Status Book lists the City of Brunswick (community 390380) as participating in the National Flood Insurance Program, with flood maps dated August 19, 2013 on which no base flood elevations were determined; the City Engineer administers flood plain approvals.
Want this handled start to finish?
Get a free quote →Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Brunswick permit search and official resources
Brunswick does not offer an online permit search on these pages; ask the Building Division for permit and inspection records on a property, and use the Medina County Auditor’s property search for parcel details. The registered contractor list on the city’s site shows whether a contractor is currently registered.
- Brunswick Building Division
- Permits and inspections
- Forms for builders and contractors
- Permit fees, residential
- Permit fees, commercial
- Hiring a contractor
- Registered contractors
- City Engineer
- Boards and commissions
- Medina County Health Department plumbing program
- Medina County Sanitary Engineers permits
- Medina County sewer and water fee schedule, September 1, 2026
- RV registration, Ordinance 55-11
- Property maintenance
- Ohio Board of Building Standards building department look-up
- FEMA Community Status Book, Ohio
Inspections are where schedules slip.
Get a free quote →Brunswick building permit FAQs
Who issues building permits in Brunswick, Ohio?
The city’s own Building Division at 4095 Center Road (330-558-6830), not the Medina County Building Department.
Do I need a permit for windows, roofing or siding in Brunswick?
Yes. The city’s list includes replacement windows, roofing, siding, concrete flat work, decks, sheds and fences.
Can I get a permit the same day?
No. Brunswick does not issue permits on the same day; call ahead to book an appointment or use the City Hall drop box.
Do contractors have to register with the city?
Yes. All contractors register with Brunswick and provide insurance, any required state license and a performance bond.
How are permit fees for a new home calculated?
By the square footage of each component, under the city’s fee sheets and Chapter 1442; the state assessment is added.
Who handles flood plain approval?
The City Engineer, who reviews all construction in FEMA-designated flood plains and also assigns building addresses.
Do I have to register an RV or boat kept at my house?
Yes. Recreational vehicles, boats and trailers stored at a home are registered each year with the Division of Building under Ordinance 55-11.
What county permits does a new house need?
A sanitary sewer permit from the Medina County Sanitary Engineers; ask the division whether the plumbing permit is issued by the city or through the Medina County Health Department program.
Simplify Brunswick permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Brunswick sooner?
Let Alliance prepare, file, and track your Brunswick permits while your crew stays on the job.
More Ohio permitting guides
Medina County
Read guide →Medina
Read guide →Wadsworth
Read guide →Bucyrus Building Permit Guide
Read guide →Butler County Building Permit Guide
Read guide →Canton Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Brunswick permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.