In Broadview Heights, permits come from the city’s Building Department (Building and Zoning) at 9543 Broadview Road (440-526-6864), where Joe Mandato is the Chief Building Official. Staff calculate each fee from Chapter 1449 of the city code and add the state’s 1% residential or 3% commercial assessment. The department has 30 days to review an application but says a complete one averages two weeks, and every contractor and subcontractor must be registered, bonded, insured and licensed by the city before a permit is issued.
What requires a building permit in Broadview Heights?
Broadview Heights uses one “General” application for most house projects, and its list is the clearest guide to what needs a permit here. Separate applications cover new homes, roofs, pools, water heaters and furnaces, generators, signs and commercial plan review.
General application
- Basement completion, bathroom and kitchen remodels
- Decks, patios, gazebos and storage sheds
- Driveways, sidewalks and fences
- Siding, windows and waterproofing
- Electric upgrades
- Hot tubs and swimming pools
- Sewer line replacement and sewer tie-ins
- Other work not listed elsewhere
Own application
- New homes (New Home Packet)
- Roofs
- Water heaters, furnaces, air conditioning and generators
- Swimming pools, hot tubs and seasonal pools
- Signs and donation bins
- Commercial buildings, additions and alterations (plan review)
- Change of occupancy
- Work in the right-of-way
Pools and hot tubs appear on both lists; the city also posts a dedicated pool, hot tub and seasonal pool application. Contractors must register even for work that needs no permit, so landscapers and other trades working in the city are covered too. The city notes that parts of a house that do not affect its safety or structural integrity are the buyer’s or homeowner’s responsibility, not the department’s.
What Broadview Heights decides and what the state holds
The state adopts the Ohio building codes and certifies the departments that enforce them; Broadview Heights lists the codes it has adopted, from the Residential Code of Ohio to the fuel gas and electrical codes. The city sets its own fees in Chapter 1449, registers contractors and rental properties, and runs zoning through its Planning Commission and Board of Zoning Appeals. One thing it does not control: oil and gas wells. Since House Bill 278 of 2004 the state permits and regulates drilling, through the Ohio Department of Natural Resources, and the city counts about 87 wells inside its limits. FEMA lists Broadview Heights as a participating flood insurance community, with maps dated December 3, 2010, on which no base flood elevations were determined.
Short on time to read all of this?
Get a free quote →Broadview Heights building department: who handles permitting
The Building and Zoning Department administers the city and building codes, reviews applications, issues permits and books inspections. Joe Mandato, the Chief Building Official, can be reached through the department’s main number. The department posts a flow chart for new project submittals and sheets on which utility (the Illuminating Company, Cleveland Water or Dominion) owns which part of a home’s service lines.
| Detail | Information |
|---|---|
| Office | Building Department, 9543 Broadview Road, Broadview Heights, OH 44147 |
| Phone / fax | 440-526-6864 / 440-526-3091 |
| Building@broadview-heights.org | |
| Chief Building Official | Joe Mandato |
| Payments | In person Monday to Friday 9:00 a.m. to 4:00 p.m. (none after 4:00); online with a 3.5% charge ($0.50 minimum); checks by mail |
| Inspections | 440-526-6864, 8:30 a.m. to 4:00 p.m., with 24 hours’ notice |
| City Hall main line | 440-526-4357 |
Broadview Heights permit types
Applicants must use the current published forms; an old version is sent back for resubmission. The 2026 revised General Application, dated April 23, 2026, asks for the project value (materials plus labor), the parcel number, zoning district and sublot, the type of work and a scope of work, and it must come with a lot drawing showing the work. Two questions are mandatory: whether the lot is a corner lot and whether it belongs to a homeowners association. If it does, attach a letter from the HOA agreeing to the project; an unanswered question stops the permit.
Residential permits
- New homes use the New Home Packet (also revised April 23, 2026), which lists the excavator, foundation, electrical, HVAC and plumbing subcontractors. Before the city issues the building permit, the permit holder must get a sewer permit and bring the receipt or permit; the packet includes a sanitary sewer map showing which applies to the lot.
- Sheds and other accessory structures are for storing garden and yard equipment: one per parcel, no taller than 16 feet, and up to 320 square feet on a lot under one acre or 500 square feet on an acre or more. Garage and shed together may not exceed 1,200 or 1,700 square feet.
- Fences need a plot plan, must sit entirely behind the rear wall line of the house, top out at 6 feet, and on corner lots keep a 50-foot secondary setback from the right-of-way, with a drawing sent in for pre-approval.
- Waterproofing comes with an acknowledgment form, and water heater replacements follow the city’s hot water tank guidelines.
Building or remodeling a home here? Alliance handles residential permit filing, so the crew isn't waiting on the counter.
Commercial permits
New commercial buildings, additions and alterations use the commercial plan review application, with the city’s requirements for alteration plans. Commercial work also has its own forms for water heaters, furnaces, air conditioning and generators, roofs, signs (with a Planning Commission sign application where needed), wireless and small cell facilities, donation bins and changes of occupancy.
Not sure this scope needs a permit?
Get a free quote →For tenant improvements and new commercial builds, Alliance handles commercial permit expediting through issuance. More on this: commercial building permits explained.
What comes before the building permit
- Planning Commission. Meets at 7:00 p.m., generally on the second and fourth Wednesdays, and reviews commercial, industrial and residential development, lot splits and consolidations, rezoning and signs; its recommendations go to City Council.
- Board of Zoning Appeals. Meets when needed, generally on the first Wednesday, to hear variance requests such as setback relief on a difficult lot. Residents within 500 feet are notified by mail before the hearing. The board has five members and two alternates appointed by the Mayor and approved by Council, and a council member attends as a nonvoting representative who reports back to City Council.
- Homeowners associations. A letter of HOA approval is part of the residential application where the lot is in an HOA, and the permit holder is responsible for any other board or association approvals.
Broadview Heights permit costs and fees
Permit fees come from the schedule in Chapter 1449 of the Codified Ordinances. The city does not print the amounts on its application forms: Building Department staff calculate the fee for each job and then add the Ohio Board of Building Standards assessment of 1% for residential projects or 3% for commercial projects. Call 440-526-6864 for the figure on a specific project before paying. The charges the city does publish are below.
| Item | Amount |
|---|---|
| Permit fees | Chapter 1449 schedule, calculated by staff |
| State assessment | 1% residential; 3% commercial |
| Contractor registration | $100 a year, no refunds, however many trades are on the bond |
| Online payment charge | 3.5% ($0.50 minimum) |
| Final grading or concrete not finished at occupancy | Cash bond of 1% of permit value plus the cost of the unfinished work; 10% administrative fee kept |
| Landscaping and seeding not finished at transfer | Cash bond of $0.50 per sq ft of lawn area |
| Inspection without approved plans on site | No inspection; re-inspection fee charged |
| Public record copies | $0.10 per page (Ord. 155-12) |
Rather talk it over?
Call 1-855-478-4290 →The occupancy bond is refunded once the work is approved, less the 10% fee and any re-inspection charges, but it is forfeited if the work is not done within 30 days of written notice. Registration and rental applications for 2026 were accepted from January 1, 2026, and rental registrations run from February 28, 2026 to February 27, 2027.
Trade permits and who may pull them
Electrical, plumbing and HVAC work goes on the General Application or on the water heater, furnace, air conditioning and generator form, and every contractor and subcontractor named must be registered, bonded, insured and licensed by the city. The 2026 registration rules:
- All general contractors, subcontractors, specialty contractors and landscapers register with the city and with the Regional Income Tax Agency (RITA) before any work, whether or not the job needs a permit.
- Registration is $100 a year with no refunds, valid January 1 to December 31, 2026. Register for each trade classification shown on your bond; one fee covers every trade on it.
- Use the city’s bond form, dated in 2026 and expiring December 31, 2026, with a power of attorney and the insurer’s seal; no continuation certificates and no December grace period.
- Insurance of $100,000/$300,000 for bodily injury and at least $50,000 for property damage, with the city as certificate holder, plus a current workers’ compensation certificate.
- Electric, hydronic, fire suppression, refrigeration, HVAC, fire protection and plumbing contractors attach a current state license.
Starting work unregistered can bring extra fees, a stop-work order or a court citation, and a cancelled bond cancels the registration. Homeowners may file applications, but the General Application warns that a homeowner who takes out a permit on a contractor’s behalf is liable for all the work, including violations and anything left unfinished. The city posts its list of registered contractors, last updated in July 2026.
How to apply for a Broadview Heights building permit
Find the zoning district and sublot, note whether it is a corner lot, and get the HOA’s approval letter if there is one.
Every contractor and subcontractor registers with the city and RITA before work begins.
Download the latest General Application, New Home Packet or specialty form; older versions are returned.
Include the lot drawing and any plans; new homes add the sewer permit or receipt.
The city allows itself 30 days; a complete application averages two weeks.
Pay in person, online or by mailed check; no work starts until the permit is stamped approved, paid and issued.
Rather not deal with the building department?
Get a free quote →Review, corrections and what causes delay
The two-week average assumes every document is in. Unanswered corner-lot or HOA questions stop processing outright, an outdated form must be redone, and a new home cannot get its permit until the sewer permit is in hand. Expired insurance or workers’ compensation certificates on file for a contractor also delay permits and inspections until new ones are sent.
Inspections and certificates in Broadview Heights
Call 440-526-6864 between 8:30 a.m. and 4:00 p.m. at least 24 hours ahead. The permit holder schedules every inspection, and every permit carries the city’s mandatory inspections plus a final. If the approved plans are not on site, no inspection is made and a re-inspection fee is charged.
- Site and foundation: temporary electric service; sewer before footers, with perimeter erosion control in place (City Engineer); footers, which are not approved and the job is red-flagged until erosion controls are installed; utility trenches; foundation and waterproofing; and the City Engineer’s tar grade check of the foundation walls.
- Rough and cover-up: plumbing, mechanical and electrical rough-ins before framing; framing with fire blocking; roofing with ice guard and underlayment; insulation; wallboard before taping. A carbon monoxide detector is required whenever a gas appliance is installed or replaced.
- Finish: concrete bases before pouring, gutters and downspouts, and a final that covers grading, survey pins, the driveway and finished kitchen and bath floors.
The City Engineer certifies final and driveway grades against the approved plan, with all survey pins exposed. Landscaping and seeding must be finished before a property transfers; when the season does not allow it, the buyer signs a time-limit acknowledgment and posts a lawn bond, and the work is due by the following July 1 or October 30 depending on when occupancy was granted.
Ohio building code in Broadview Heights
Broadview Heights lists the Ohio Building, Mechanical and Plumbing Codes and the Residential Code of Ohio among the codes it has adopted, alongside the electrical and fuel gas codes. The Board of Building Standards look-up map shows which department has residential and commercial authority over an address.
Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Want this handled start to finish?
Get a free quote →Broadview Heights building permit FAQs
How long does a building permit take in Broadview Heights?
The city has 30 days to review an application; a complete one averages about two weeks.
Do landscapers have to register?
Yes. Every contractor, including landscapers, registers with the city and RITA before working, even when no permit is needed; the fee is $100 a year.
How big can a shed be?
One per parcel, 16 feet tall at most: 320 square feet on a lot under an acre, 500 square feet on an acre or more.
What are the fence rules?
A permit and plot plan, a fence behind the rear wall line of the house, 6 feet maximum, and post holes 38 inches deep inspected before other work.
Why does the application ask about my HOA?
It is a mandatory question; if the lot is in an HOA, a letter of approval from the association must come with the application.
Who regulates the gas wells in the city?
The Ohio Department of Natural Resources; state law took that authority from cities in 2004.
What happens if final grading is not done at move-in?
The builder or permit holder posts a cash bond of 1% of the permit value plus the unfinished work, refunded less 10% once the work is approved.
Broadview Heights permit search and official resources
Permit files are public records. They can be reviewed on weekdays from 8:30 a.m. to 4:30 p.m.; copies cost 10 cents a page, and requests go through the city’s records request form or by phone to 440-526-3664. Readily available records are handed over at once; larger requests get a date.
Inspections are where schedules slip.
Get a free quote →- Broadview Heights Building and Zoning
- Applications, forms and fees
- 2026 General Application
- New Home Packet
- 2026 contractor registration
- Registered contractors, July 2026
- Mandatory inspections
- Accessory structure rules
- Fence rules
- Commercial plan review application
- Flow chart for new project submittals
- Planning Commission
- Board of Zoning Appeals
- Gas and oil wells
- Public records requests
- BBS building department look-up
- Ohio Board of Building Standards
Simplify Broadview Heights permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Broadview Heights sooner?
Let Alliance prepare, file, and track your Broadview Heights permits while your crew stays on the job.
More Ohio permitting guides
Cuyahoga County
Read guide →Brook Park
Read guide →Brooklyn
Read guide →Brown County Building Permit Guide
Read guide →Brunswick Building Permit Guide
Read guide →Bucyrus Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Broadview Heights permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.