In the 13 townships of Clinton County, building and zoning permits come from Clinton County Building & Zoning, 111 South Nelson Avenue, Suite 8, Wilmington (937-382-3335), which enforces the state building codes and the County Zoning Resolution. You apply through the county’s iWorQ portal or in person; the Engineer, Health Department, Map Office, Regional Planning, Soil and Water, Zoning and the Warren County Building Department review each application online, and Warren County makes the inspections. Under the schedule effective May 1, 2025, the structure fee for a house of 1,001 to 2,000 square feet is $400, with electrical and HVAC charged by size.
What requires a building permit in Clinton County?
The county says a building permit is needed when building in any township, zoned or not. Its FAQ names the common cases and asks you to call about anything not on the list.
Building permit
- Any new structure, house or accessory building
- Additions and structural changes
- Decks and pools
- Electrical installations
- Fireplaces and wood stoves
- Remodels and signs
- Demolition (its own application)
Zoning permit
- Any structure or addition in the 11 zoned townships
- Accessory buildings under 200 square feet (zoning fee only, no building fee)
- Changes of use, which need zoning approval
- Home-based businesses and RV or camper occupancy
- Signs, conditional uses and variances
Farm buildings and agritourism uses have their own declaration forms: the county publishes an Agricultural Use Exemption Declaration and an Agritourism Declaration alongside its permit applications. Pole barns with trusses of 36 feet or longer need plans approved and stamped by an engineer.
What Clinton County decides and what the state holds
The building codes come from the state; the county runs its own building and zoning office, contracts with Warren County for all building inspections and has Warren County review each application. Locally the county sets the fee schedule, writes and enforces the County Zoning Resolution (updated in 2025, with a renewable energy appendix) in every township except Clark and Washington, and runs the Board of Zoning Appeals. Clark and Washington townships have no zoning regulations, but building permits are still required there.
Clinton County building department: who handles permitting
Clinton County Building & Zoning is the permit counter for the unincorporated townships. Warren County’s Building Department is one of the reviewers on every application and, under a county contract, carries out all building inspections, while permits themselves are applied for in Clinton County.
Short on time to read all of this?
Get a free quote →| Detail | Information |
|---|---|
| Permit office | Clinton County Building & Zoning, 111 S Nelson Ave, Suite 8, Wilmington, OH 45177 |
| Phone and email | 937-382-3335; buildingandzoning@clintoncountyohio.us |
| Hours | Monday to Friday, 7:30 a.m. to 4:00 p.m. |
| Online | iWorQ permit portal: apply, upload plans, pay and check status |
| Inspection time window | Warren County Building Department, 513-695-3994, 7:00 to 8:00 a.m. on the inspection day |
| Final plumbing | Clinton County Combined Health District |
The City of Wilmington, the county seat with 12,802 people in the 2025 Census estimate, takes permits through its own Building & Zoning office at 69 North South Street (937-382-5134) and also uses Warren County for building inspections, which take place weekdays from 8:00 a.m. to 3:30 p.m. and must be booked a business day ahead. The villages are Blanchester, Clarksville, Martinsville, Midland, New Vienna, Port William and Sabina, plus a sliver of Lynchburg; the county’s pages do not say which of them it permits, so ask the village and check the Board of Building Standards look-up map. The county does take sewer tap applications for Martinsville and Midland. The county as a whole had 42,301 residents in 2025.
Clinton County permit types
One Building & Zoning Department application covers residential and commercial work. It asks for the township and zoning district, total square footage (basement, each floor, garage, deck and porch), project cost and contractor, then the parts of the job: structure (house, accessory building, addition, remodel, pool or deck), electrical (reconnect, upgrade, alteration, new or minor), mechanical (new, addition, pressure or gas piping, upgrade, minor), fire (alarm, sprinkler, kitchen exhaust hood, kitchen hood) and other (certificate of occupancy, demolition, renewable energy, tent, zoning only). You can tick a box asking that your building plans not be released under a public records request.
Residential permits
House plans are checked against the county’s 2025 residential plan review checklist: foundation, floor, elevation and wall-section drawings in PDF, energy documentation, egress windows, stairs and guards, interconnected smoke alarms, garage separation and, for two- and three-family buildings, fire-rated separations. Homes in a flood hazard area need flood-resistant construction designed by a registered engineer or architect and a separate flood hazard permit, and gas piping needs a pressure piping permit.
Building or remodeling a home here? Alliance handles residential permit applications, so the crew isn't waiting on the counter.
Commercial permits
Commercial work is charged per 100 square feet for the structure and each system, with a $200 processing fee and the 3% state surcharge due when you apply. Pole buildings and garages without a house are reviewed as S-1 storage buildings under the Ohio Building Code. Kitchen hoods, fire alarms and sprinklers are listed as separate items on the application.
For tenant improvements and new commercial builds, Alliance handles commercial building permits through issuance. More on this: commercial building permits explained.
Not sure this scope needs a permit?
Get a free quote →What comes before the building permit
- Zoning permit. In the zoned townships it must be issued before the building permit, but the two can be applied for together.
- Plot plan. Property name and address, lot and building dimensions, distances to property lines, driveway, septic and well locations, any water body and any easement.
- Septic approval. Where the site has a septic system, its approval is part of the application, and the Health Department reviews each file.
- New parcels. Any new parcel must be recorded with the Map Office before a permit is issued.
- Board of Zoning Appeals and zoning commission. Conditional uses, variances and appeals go to the board; rezonings and text changes go through the zoning commission.
Clinton County permit costs and fees
All fees come from the Clinton County Building and Zoning Fee Schedule effective May 1, 2025. The processing fee for a new structure is paid with the application; the rest is billed by email once the plans are approved and is due in full then. Fees are not refunded, card payments carry a 3.5% processing charge, and work started without a permit is charged double.
| Square feet | Structure / electrical / mechanical |
|---|---|
| 0–500 | $200 / $135 / $100 |
| 501–1,000 | $345 / $170 / $150 |
| 1,001–2,000 | $400 / $200 / $175 |
| 2,001–3,000 | $475 / $240 / $200 |
| 3,001–4,000 | $550 / $270 / $240 |
| 4,001–5,000 | $700 / $360 / $350 |
| 5,001–6,000 | $775 / $400 / $375 |
| 6,001 and above | $900 / $465 / $400 |
A house also pays a $50 processing fee and the 1% state surcharge. Accessory structures are $135 for 201 to 500 square feet, $200 to 1,000, $270 to 4,000 and $325 above; smaller ones pay only the zoning fee. Flat residential fees: certificate of occupancy, demolition, electrical service upgrade, HVAC replacement, above-ground pool, extra inspection and tent $100 each; fireplace or gas piping $100 each; in-ground pool $200; plan revision $50.
Worked example: a new house of 1,800 total square feet falls in the 1,001 to 2,000 band, so the structure, electrical and mechanical fees are $400 + $200 + $175 = $775, plus the $50 processing fee and the 1% surcharge. In a zoned township the zoning permit for a structure of 501 to 2,000 square feet adds $150.
Rather talk it over?
Call 1-855-478-4290 →| Item | Fee |
|---|---|
| Commercial processing; state surcharge | $200; 3% of fees, due with the application |
| Commercial structure; industrialized unit | $7.50 per 100 sq ft |
| Electrical; fire alarm; fire sprinkler; mechanical, HVAC or solar | $4.50 per 100 sq ft each |
| Pressure piping | $0.25 per lineal foot |
| Certificate of occupancy; minor building, electrical or HVAC; extra inspection | $200 each |
| Kitchen exhaust with suppression; kitchen hood with suppression | $400; $200 |
| Plan review; plan revision; demolition | $100 each |
| Signs | $100 face change; $125 under 30 sq ft; $250 over 30 sq ft |
| Zoning permit for a structure | $60 to 200 sq ft; $100 to 500; $150 to 2,000; $250 to 5,000; $350 above |
| Board of Zoning Appeals (conditional use, variance, appeal) | $250 residential or agricultural district; $450 commercial or industrial |
| Rezoning or text amendment | $500 residential or agricultural; $1,000 commercial or industrial |
| Home occupation; RV or camper occupancy; violation fee | $100 each; repeat offender $500 |
For a 10,000-square-foot commercial building with electrical and HVAC, the per-100 rates give $750 for the structure, $450 for electrical and $450 for mechanical, or $1,650, plus $200 processing and the 3% surcharge. Renewable energy projects over 4,000 square feet pay a zoning fee of $25 per acre with a conditional use.
Trade permits and who may pull them
Electrical and mechanical work is permitted on the same county application as the building, priced by square footage for houses and per 100 square feet for commercial buildings, and inspected by Warren County. Gas lines are inspected by the gas utility outside the building and by the building department inside. Plumbing is not a county building permit: the final plumbing approval comes from the Clinton County Combined Health District, and it must be in place before the final building and electrical inspection.
The county’s pages list no local contractor registration and say nothing about permits pulled by homeowners; the application simply asks whether the applicant is the owner. Commercial electrical, HVAC, hydronics, plumbing and refrigeration contractors need the Ohio Construction Industry Licensing Board license.
Rather not deal with the Clinton County building department?
Get a free quote →How to apply for a Clinton County building permit
Use the county GIS zoning map; Clark and Washington townships have no zoning.
New lots go to the Map Office first.
File in the iWorQ portal or at 111 S Nelson Ave; pay the processing fee for a new structure.
PDF building plans, the plot plan with setbacks, septic and well locations, and septic approval.
Engineer, Health, Map Office, Regional Planning, Soil and Water, Zoning and Warren County review in the portal.
Fees are billed by email; the permit and approved plans are emailed back.
Call the county 24 to 48 hours ahead.
Review, corrections and what causes delay
In the portal an application shows as Pending while the county departments review it, Awaiting Payment once reviews are approved and fees added, Open when work can start, and Closed after the final inspection passes. An unrecorded parcel, a missing septic approval, or a long-span pole barn without engineer-stamped plans keeps it in Pending. Plan revisions cost $50 for houses and $100 for commercial jobs.
Inspections and certificates in Clinton County
Book inspections with the county at 937-382-3335, giving the permit number or job address, 24 to 48 hours ahead. On the day, call Warren County at 513-695-3994 between 7:00 and 8:00 a.m. for a time window. The permit and approved plans must be on site, and the work must be finished for the stage being inspected.
- Footer or foundation: excavation with the concrete grade set and rebar in place.
- Slab: after the plumbing inspection, with wire mesh and vapor barrier down; crawl space: beams and joists set before flooring.
- Rough building and electrical: includes rough HVAC and follows the rough plumbing inspection; then insulation.
- Pools: bonding of all metal parts within 5 feet of the pool.
- Trench: in the CG&E area only, 24 inches deep with red warning tape 12 inches above the wire.
- Final building and electrical: once the structure is complete and the final plumbing approval from the health district is in.
Commercial fire inspections cover suppression, alarms, sprinklers, hoods and exits. A certificate of occupancy costs $100 for a house and $200 for a commercial building; the same fee line covers a 90-day temporary certificate.
Ohio building code in Clinton County
The county department enforces the state’s residential and commercial codes in the townships, with Warren County’s Building Department reviewing applications and inspecting. FEMA’s Community Status Book lists unincorporated Clinton County (community 390764) as participating in the National Flood Insurance Program, with flood maps effective November 19, 2021; Wilmington and the villages are listed separately from the county row.
Want this handled start to finish?
Get a free quote →Ohio has statewide building codes: the Ohio Building Code for commercial and other nonresidential buildings and the Residential Code of Ohio for detached one-, two- and three-family dwellings. Only departments certified by the Ohio Board of Building Standards may approve plans and inspect, and residential rules are uniform statewide. How Ohio’s statewide code works
Clinton County permit search and official resources
Check the status of any open application in the iWorQ portal by permit number. Official building and zoning records are released through a public records request under ORC 149.43; the department notes that its website is informational and not the official record.
- Building in Clinton County (steps and reviews)
- Building and zoning fee schedule, effective May 1, 2025
- Paying for permits
- Building and zoning permit application
- All applications, including agricultural exemption and variance forms
- Residential plan review checklist (2025)
- Building inspections and Warren County contract
- Building and zoning FAQ
- Clinton County Zoning Resolution and zoning map
- Clinton County Building & Zoning
- City of Wilmington inspections
- BBS building department look-up map
- Ohio Board of Building Standards
- Ohio Construction Industry Licensing Board
- FEMA Community Status Book, Ohio
Inspections are where schedules slip.
Get a free quote →Clinton County building permit FAQs
Do I need a building permit in an unzoned township?
Yes. Clark and Washington townships have no zoning, but the county requires a building permit in every township.
Do I need a permit for a small shed?
An accessory structure under 200 square feet pays only the zoning fee ($60 in a zoned township); from 201 to 500 square feet the building fee is $135.
Who inspects my project?
Warren County’s Building Department, under contract. Book through the county office and call Warren County that morning for a time window.
How much does a new house cost to permit?
For 1,001 to 2,000 square feet, $400 structure, $200 electrical and $175 mechanical, plus $50 processing and the 1% state surcharge.
Can I apply online?
Yes, through the county’s iWorQ portal, where you upload PDF plans, pay and follow the status; paper applications can be emailed or dropped off.
Does a pole barn need engineered plans?
Only if its trusses are 36 feet or longer; then the plans must be stamped by an engineer.
Who issues permits inside Wilmington?
The city’s own Building & Zoning office at 69 North South Street (937-382-5134); Warren County inspects there too.
Simplify Clinton County permitting with Alliance Permitting
Alliance Permitting is a permit documentation and submission company in Ohio. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.
Ready to break ground in Clinton County sooner?
Let Alliance prepare, file, and track your Clinton County permits while your crew stays on the job.
More Ohio permitting guides
Warren County
Read guide →Highland County
Read guide →Fayette County
Read guide →Columbiana County Building Permit Guide
Read guide →Columbus Building Permit Guide
Read guide →Coshocton Building Permit Guide
Read guide →This guide is provided by Alliance Permitting for general information about Clinton County permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.